| Replace heat pump and electrical sub panel | 8200 KERN AV APT I205, Gilroy |
Major renovation | Mar 17, 2026 | 1 | Subscribers |
| Replacing 10ft of sewer line, installing a cleanout and backflow preventor. No work in the PRW. | 7452 HOYLAKE CT, Gilroy |
Major renovation | Mar 17, 2026 | 1 | Subscribers |
| CONVERT EXISTING 461 SQ. FT. GARAGE TO A 2 BEDROOM, 1 BATHROOM, FULL KITCHEN JADU. PROPOSING NEW 37 SQ. FT. FRONT PORCH FOR MAIN RESIDENCE. | 1280 SWANER DR, Gilroy |
Major renovation | Mar 17, 2026 | 1 | Subscribers |
| Building is protected by an existing auto fire sprinkler system for light hazard occupancy. | 360 E TENTH ST, Gilroy |
Other | Mar 17, 2026 | 1 | Subscribers |
| New Old Navy Retail Store 15,965 sq, ft Tenant Improvement | 681 LEAVESLEY RD, Gilroy |
Major renovation | Mar 17, 2026 | 1 | Subscribers |
| Construction of a new (748) SF ADU with (2) BR, (1) BA, full kitchen, and (77) SF porch. 250AMP METER UPGRADE. | 1009 WELBURN AV UNIT B, Gilroy |
Other | Mar 16, 2026 | 1 | Subscribers |
| Like for like replacement of 40 gallon gas tank ULN water heater installed in garage. Same size and location as existing. | 6280 CHURCH ST, Gilroy |
Plumbing | Mar 16, 2026 | 1 | Subscribers |
| R&R existing furnace in the same location like for like. | 710 FIFTH ST, Gilroy |
Major renovation | Mar 16, 2026 | 1 | Subscribers |
| First Floor System Replacement Provide and install one 5 Ton, 17.2 SEER2 Daikin FIT Enhanced Fan Coil, & Heat Pump. Clean and reuse condensa | 2335 WILDROSE CT, Gilroy |
Major renovation | Mar 16, 2026 | 1 | Subscribers |
| COMPLETE KITCHEN REMODEL. REPLACING ALL ELECTRICAL, MECHANICAL AND PLUMBING. NO WALLS OR CHANGE IN THE LAYOUT. | 1091 THIRD ST, Gilroy |
Major renovation | Mar 16, 2026 | 1 | Subscribers |
| INSTALL (2) ESS with MICROGRID INTERCONNECT DEVICE: BACKUP SWITCH and EXISTING SOLAR SYSTEM INSTALLED | 7289 HANNA ST, Gilroy |
Other | Mar 13, 2026 | 1 | Subscribers |
| Replace 1 inswing entry door with sidelights | 7831 SANTA THERESA DR, Gilroy |
Major renovation | Mar 13, 2026 | 1 | Subscribers |
| 18.86 KW (46) Panel Roof mount PV System (3) ESS with BACKUP GATEWAY: (1) 200A | 1850 VISTA DEL SUR, Gilroy |
Roofing and exterior | Mar 13, 2026 | 1 | Subscribers |
| AWS: Temp Power for Construction and Construction office trailers | 8000 CAMINO ARROYO, Gilroy |
Major renovation | Mar 12, 2026 | 1 | Subscribers |
| AMAZON - ON-SITE IMPROVEMENTS | 8000 CAMINO ARROYO, Gilroy |
Major renovation | Mar 12, 2026 | 1 | Subscribers |
| LEGENDS: (2) SETS OF ILLUMINATED LED CHANNEL LETTERS. (2) BLADE SIGNS. | 681 LEAVESLEY RD STE 100, Gilroy |
Other | Mar 12, 2026 | 1 | Subscribers |
| CRUNCH FITNESS INTERIOR ONLY DEMO: All interior non-structural walls are to be removed. All interior T-bar and gypsum board ceilings are to | 360 E TENTH ST, Gilroy |
Demolition | Mar 12, 2026 | 2 | Subscribers |
| 6.56 KW PV Solar Install, 16 Modules (1) ESS | 8810 ZINNIA ST, Gilroy |
Other | Mar 11, 2026 | 1 | Subscribers |
| 5.74 KW (14) Panels Roof mount PV System (1) ESS | 840 ESCHENBURG DR, Gilroy |
Roofing and exterior | Mar 11, 2026 | 1 | Subscribers |
| New Solar PV System with Attached Design | 2202 COLUMBINE CT, Gilroy |
Other | Mar 11, 2026 | 1 | Subscribers |
| INSTALL 1 ESS with BACKUP GATEWAY: (1) 200A | 9203 RANCHO HILLS DR, Gilroy |
Other | Mar 11, 2026 | 1 | Subscribers |
| Installing below (2) 20A 120V AFCI Circuit (within 5’) + Device Box w/ GFCI Outlet | 6370 GODANI ST, Gilroy |
Major renovation | Mar 11, 2026 | 1 | Subscribers |
| TRACT #9563, BELLA VISTA, Lot #31, 2 STORY, SINGLE FAMILY HOME AT 3,956 SQ.FT. WITH 4 BEDROOMS, 5 BATHROOMS. BASEMENT GARAGE AT 928 SQ.FT. A | 6635 EAGLE RIDGE CT, Gilroy |
Other | Mar 11, 2026 | 1 | Subscribers |
| Replace 1 retrofit window | 1991 CLUB DR, Gilroy |
Major renovation | Mar 11, 2026 | 1 | Subscribers |
| New PV+ESS | 5430 NICOLE WY, Gilroy |
Other | Mar 10, 2026 | 1 | Subscribers |
| remove 3 windows and 1door and replace with 1 large window. | 7361 OLD TOMS CT, Gilroy |
Major renovation | Mar 10, 2026 | 1 | Subscribers |
| Removal & haul away all layers of Comp-Shingles. Install Underlayment. Replace roof jacks. Install new Comp-Shingles GAF Timberline HDZ. | 5590 KAREN CT, Gilroy |
Roofing and exterior | Mar 10, 2026 | 1 | Subscribers |
| 7.2 KW (16) Panel Roof mount PV System (1) ESS | 1430 PARTRIDGE DR, Gilroy |
Roofing and exterior | Mar 10, 2026 | 1 | Subscribers |
| Rooftop Mounted Solar Energy System PV+ST 19 ELNSM54M-HC-N-450 solar modules 1 1707000-XX-Y {11.5kW} inverter 2 1707000-XX-Y {11.5kW} ESS Ex | 1575 ZEPHYR PL, Gilroy |
Roofing and exterior | Mar 10, 2026 | 1 | Subscribers |
| remove and dispose of the existing asphalt shingles roofing materials and install a new landmark Pro asphalt shingles roofing system. | 260 FARRELL AV APT 260, Gilroy |
Roofing and exterior | Mar 10, 2026 | 1 | Subscribers |