| RES - SOLAR - ROOF MOUNTED - INSTALLATION OF ROOFTOP MOUNTED PHOTOVOLTAIC SOLAR SYSTEM | 7941 ROSLYN ST |
Roofing and exterior | Jan 26, 2026 | 1 | Subscribers |
| RES - GARAGE, DETACHED Building Metal 30'wide X 40' length vertical roof(Ga:14 | 3/12" roof pitch) ,14"height(double legs)(5ft on center),14 | 34302 E 142ND PL |
Roofing and exterior | Jan 25, 2026 | 1 | Subscribers |
| RES - GARAGE, DETACHED 36x40 | 12610 UINTA ST |
Other | Jan 25, 2026 | 1 | Subscribers |
| RES - GARAGE, ATTACHED attach garage | 12635 VALENTIA ST |
Other | Jan 25, 2026 | 1 | Subscribers |
| RES - ELECTRICAL - 200 AMP SERVICE SWAP - 200 amp service swap. Residential Electrical Replace Service Change - Up to 200 amps | 2081 W 82ND PL |
Electrical | Jan 24, 2026 | 2 | Subscribers |
| IND - VAPOR RECOVERY UNIT - Installation of vapor recovery unit at Powhaton Compressor Station; no foundation - VRU is set on grade. | 14501 POWHATON RD |
Other | Jan 24, 2026 | 1 | Subscribers |
| RES - WATER HEATER - Replacement of 40 Gallon like for like water heater | 2552 MEADOWBROOK DR |
Plumbing | Jan 23, 2026 | 1 | Subscribers |
| RES - FURNACE - replace furnace: located in basement SS 80% eff/45k btu | 8035 KRAMERIA ST |
Mechanical | Jan 23, 2026 | 1 | Subscribers |
| COM - SIGN - ILLUMINATED - Remove existing wall sign. Install new illuminated wall sign. Connect to existing electrical connections. Install | 601 E 64TH AVE |
Electrical | Jan 23, 2026 | 1 | Subscribers |
| COM - FIRE RESTORATION - fire damage to 2 office spaces, hallway and bathroom. R&R water heater 40 gallon replace with insta hot water heate | 909 E 62ND AVE |
Plumbing | Jan 23, 2026 | 1 | Subscribers |
| RES - FURNACE & A/C - Replace Furnace 80% EFF 75K BTU AC 2.5 Ton 13 Seer | 900 DEL NORTE ST |
Mechanical | Jan 23, 2026 | 1 | Subscribers |
| COM - SIGN - ILLUMINATED - Illuminate wall sign for Truewerk. | 7010 BROADWAY ST |
Other | Jan 23, 2026 | 1 | Subscribers |
| RES - FURNACE - 80% 60K BTU FURNACE REPLACEMENT - LIKE FOR LIKE | 1849 E 83RD DR |
Mechanical | Jan 23, 2026 | 1 | Subscribers |
| COM - REMODEL - BLDG 2 - UNIT 2103 -Building 2 — 8730 Dawson Street Covered under a single building-level permit: BDP26-0164 (issued 4/20/26 | 8730 DAWSON ST |
Roofing and exterior | Jan 23, 2026 | 1 | Subscribers |
| COM - REMODEL - BLDG 1 - UNIT 202 - Rehab of interior of two story townhome units and leasing office at 8670 Dawson St. Remodeled kitchens, | 8750 DAWSON ST |
Roofing and exterior | Jan 23, 2026 | 1 | Subscribers |
| RES - FIRE RESTORATION - Existing house had a fire in the attic. We will be removing the existing roof trusses, the house will not change si | 14331 COUNTRY HILLS DR |
Plumbing | Jan 23, 2026 | 1 | Subscribers |
| RES - BARN - 60 by 40 pole barn. I have the plan set for the framing that I can send as well. | 3460 VANDERHOOF ST |
Other | Jan 23, 2026 | 1 | Subscribers |
| RES - RE-ROOF - Standard slope portion (1,918 sqft) Tear off 1 layer asphalt shingles and existing decking. Redeck over space decking. Insta | 8210 ORCHARD DR |
Mechanical | Jan 23, 2026 | 1 | Subscribers |
| SINGLE FAMILY DWELLING - A new single-family home on an empty lot. | 7040 N CONVERSE RD |
Other | Jan 22, 2026 | 1 | Subscribers |
| RES - WATER HEATER - 40g 40k water heater replacement | 300 CRAGMORE ST |
Plumbing | Jan 22, 2026 | 1 | Subscribers |
| RES - REBUILD - FIRE DAMAGE - Attic fire. Slight damage to several joists. Replace affected wiring/devices, drywall, blown in insulation and | 8500 RICHARD RD |
Other | Jan 22, 2026 | 1 | Subscribers |
| UTL - NEEDED - ASPHALT CUT FOR EMERGENCY GAS MAIN REPAIR | 321 E 82ND DR |
Plumbing | Jan 22, 2026 | 1 | Subscribers |
| COM - WATER HEATER - replace like for like 199K btu tankless water heater | 5650 PECOS ST |
Plumbing | Jan 22, 2026 | 1 | Subscribers |
| RES - FURNACE - replace furnace: located in basement SS 96% eff/60k btu | 11090 E 166TH AVE |
Mechanical | Jan 22, 2026 | 1 | Subscribers |
| RES - GARAGE - DETACHED - This project is a rebuild of a 624 SF wood frame garage on the existing turned-down concrete slab. This garage is | 4621 E 70TH AVE |
Other | Jan 22, 2026 | 1 | Subscribers |
| COM - TENANT FINISH - New first generation tenant finish for Gallery Carts. The office area utilizes premanufactured modular systems - these | 485 W 56TH AVE |
Major renovation | Jan 22, 2026 | 1 | Subscribers |
| RES - WATER HEATER - replacing the water heater with a 50 gallon water heater with a new 50 gallon water heater | 261 W 79TH CT |
Plumbing | Jan 22, 2026 | 1 | Subscribers |
| RES - FURNACE & A/C - Remove existing furnace and AC, replace will like for like furnace and add heat pump in place of AC | 8948 WINONA CT |
Mechanical | Jan 22, 2026 | 1 | Subscribers |
| SINGLE FAMILY DWELLING - We will be building a new single-family dwelling with an ADU/detached garage (separate permit) | 1341 W 152ND AVE |
Other | Jan 21, 2026 | 1 | Subscribers |
| RES - 3 TON MINISPLIT - Added a new single cassette hyper heat output 3 ton minisplit to garage. | 8896 WAGNER LN |
Other | Jan 21, 2026 | 1 | Subscribers |