| Service upgrade | 558 MARINE ST, BOULDER |
Electrical | Jun 3, 2026 | 1 | Under $250,000 |
| Sewer pipe burst from back of house to neighbor property line | 435 UNIVERSITY AVE, BOULDER |
Plumbing | Jun 3, 2026 | 1 | Subscribers |
| **All Structures must be permitted separately** Small Rear House Total tear-off & reroof of SFD, 8.66 squares of dimensional shingles on a p | 864 20TH ST, BOULDER |
Roofing and exterior | Jun 3, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Detached garage Total tear-off & reroof of detached garage, 4.33 squares of dimensional shin | 864 20TH ST, BOULDER |
Roofing and exterior | Jun 3, 2026 | 1 | Under $250,000 |
| Install Navien 150S2 tankless water heater. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued ve | 2635 MAPLETON AVE 156, BOULDER |
Mechanical | Jun 3, 2026 | 2 | Under $250,000 |
| Building upgrade to waste and water lines -- plumbing updates to entire building unrelated to BLD-NRE2026-00047. Existing gas line to/on roo | 2490 ARAPAHOE AVE, BOULDER |
Plumbing | Jun 3, 2026 | 2 | Under $250,000 |
| Manufacture Channel Letter Sign Internally Illuminated with LED's Mounted to Raceways and Installed above Entry Way Door | 2700 28TH ST, BOULDER |
Roofing and exterior | Jun 3, 2026 | 2 | Under $250,000 |
| Remove and replace existing conduit connectors and couplings associated with eleven (11) exterior light fixtures. Existing fixtures, conduit | 1911 COLUMBINE AVE, BOULDER |
Electrical | Jun 3, 2026 | 2 | Under $250,000 |
| The plan is to finish the existing unfinished basement. Total unfinished basement space is 1243 sq ft. Wanting to finish 1091 sq ft. The fin | 5079 HOLMES PL, BOULDER |
Other | Jun 2, 2026 | 1 | Under $250,000 |
| Remove and replace 11 windows of like sizes and no structural work performed. | 2929 6TH ST, BOULDER |
Other | Jun 2, 2026 | 1 | Under $250,000 |
| 6.960 kW PV system flush mount on roof of single family detached dwelling - ESS mounted on exterior - 16 modules | 3961 FULLER CT, BOULDER |
Electrical | Jun 2, 2026 | 1 | Under $250,000 |
| Install a new 13.5 kWh energy storage system utilizing (1) TESLA POWERWALL 3 with (1) TESLA GATEWAY 3 system controller. | 4021 SAINT PETERSBURG ST, BOULDER |
Electrical | Jun 2, 2026 | 1 | Under $250,000 |
| Panel and initiating device replacement | 1100 SPRUCE ST, BOULDER |
Other | Jun 2, 2026 | 1 | Under $250,000 |
| ***Located in Mechanical Room, see location photos in attachments*** Replacing existing leaking low efficiency Rheem domestic hot water boil | 2000 CANYON BLVD, BOULDER |
Mechanical | Jun 2, 2026 | 1 | Under $250,000 |
| Underground Electric Cable Replacement: +/- 656' Directional bore from UG XMFR to UG XMFR / 1-3'x3' Bore Pit in ROW / 6 Potholes in ROW Bore | 1140 MONROE DR, BOULDER |
Electrical | Jun 2, 2026 | 1 | Under $250,000 |
| Replace 40-gallon water heater **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel | 1425 LINCOLN PL, BOULDER |
Mechanical | Jun 2, 2026 | 1 | Under $250,000 |
| 500' of overhead wire to be replaced. Work vehicles in alleyway. No excavation. **contractor must notify all surrounding/impacted residents, | 1200 COLLEGE AVE, BOULDER |
Other | Jun 2, 2026 | 1 | Under $250,000 |
| Concrete and asphalt work associated with the CU Residence One project **impacted residents/businesses must be notified a minimum of 72 hour | 1930 ATHENS ST, BOULDER |
Other | Jun 2, 2026 | 1 | Under $250,000 |
| Gas demo (1) 5x5 street cut (3) potholes **contractor must notify impacted residents 72 hrs in advance; no-parks must be placed 72 hrs in ad | 3767 ORANGE LN, BOULDER |
Demolition | Jun 2, 2026 | 1 | Under $250,000 |
| Replace existing furnace with heat pump system for single family detached dwelling - includes electrical **PLEASE NOTE: APPLICABLE ONLY TO S | 370 29TH ST, BOULDER |
Mechanical | Jun 2, 2026 | 1 | Under $250,000 |
| Service Change upgrade to 200a Also add 20a dedicated circuit for coffee maker | 1900 MARIPOSA AVE, BOULDER |
Electrical | Jun 2, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 14 squares of dimensional shingles on a pitch represented as | 1332 6TH ST, BOULDER |
Roofing and exterior | Jun 2, 2026 | 1 | Under $250,000 |
| Work performed includes excavation of sewer line from cleanouts in backyard to the property line towards the alley. For a depth up to 6ft de | 2004 GOSS ST, BOULDER |
Plumbing | Jun 2, 2026 | 1 | Subscribers |
| in-property sewer service repair, install cleanouts | 2485 BALSAM DR, BOULDER |
Plumbing | Jun 2, 2026 | 1 | Subscribers |
| 657 North St - WO#105662132 Gas Service Renewal - Install - _Abandon:80' of 3/4" Steel Svc Pipe - Install - 80' of 3/4" PE Svc Pipe via 1-8' | 657 NORTH ST, BOULDER |
Plumbing | Jun 2, 2026 | 1 | Under $250,000 |
| 3080 3rd St - WO#106379516 | Gas Service Renewal - Install - _Abandon:60' of 3/4" Steel Svc Pipe - Install - 65' of 3/4" PE Svc Pipe via 1-8 | 3080 3RD ST, BOULDER |
Plumbing | Jun 2, 2026 | 1 | Under $250,000 |
| wastewater sewer service repair in utility easement, install cleanouts | 4755 W MOORHEAD CIR, BOULDER |
Plumbing | Jun 2, 2026 | 1 | Under $250,000 |
| Emergency fire line repair **sidewalk closure for no more than 3 consecutive days** | 1825 33RD ST, BOULDER |
Other | Jun 2, 2026 | 1 | Under $250,000 |
| Replace current system wtih Rheem Heat Pump and 98% Gas Furnace **Any electrical work required beyond a like-for-like replacement of equipme | 2092 HARDSCRABBLE DR, BOULDER |
Mechanical | Jun 2, 2026 | 1 | Under $250,000 |
| Mitsubishi Hyper Heat Pump System System Size: 70.6K BTU's System Components: (1) Mitsubishi HiWall - MSZ-GX12NL (5) Mitsubishi Ceiling Cass | 4521 NAVAJO PL, BOULDER |
Mechanical | Jun 2, 2026 | 1 | Under $250,000 |