| **All Structures must be permitted separately** Reroof of entire building. Total tear-off & reroof of MFD, 80 squares of dimensional shingle | 4600 17TH ST 100, BOULDER |
Roofing and exterior | May 20, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 20 squares of dimensional shingles on a pitch represented as | 1720 LINDEN AVE, BOULDER |
Roofing and exterior | May 20, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 17 squares of dimensional shingles on a pitch represented as | 430 PIERRE ST, BOULDER |
Roofing and exterior | May 20, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 22 squares of dimensional shingles on a pitch represented as | 757 QUINCE CIR, BOULDER |
Roofing and exterior | May 20, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 56 squares of dimensional shingles on a pitch represented as | 2175 NORWOOD AVE, BOULDER |
Roofing and exterior | May 20, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 35 squares of 60mil grey EPDM on a pitch represented as < 2/ | 2008 ALPINE AVE, BOULDER |
Roofing and exterior | May 20, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 23 squares of dimensional shingles on a pitch represented as | 911 PLEASANT ST, BOULDER |
Roofing and exterior | May 20, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 18 squares of dimensional shingles on a pitch represented as | 720 17TH ST, BOULDER |
Roofing and exterior | May 20, 2026 | 1 | Under $250,000 |
| Replacement AC **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burning applianc | 1501 LODGE CT, BOULDER |
Mechanical | May 20, 2026 | 1 | Under $250,000 |
| Replacement furnace replacement AC **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for f | 2810 E COLLEGE AVE 307, BOULDER |
Mechanical | May 20, 2026 | 1 | Under $250,000 |
| replace 40 gallon water heater like for like **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued v | 955 WAITE DR, BOULDER |
Mechanical | May 20, 2026 | 1 | Under $250,000 |
| Installation of two Minisplit Heat Pump units, one replacing an existing A/C and one as a new installation. **PLEASE NOTE: APPLICABLE ONLY T | 275 SPRUCE ST, BOULDER |
Mechanical | May 20, 2026 | 1 | Under $250,000 |
| Service upgrade to replace the existing 100a service with a 200a, replace meter, panel and breakers, update grounding, add whole home Surge | 230 CIMMARON WAY, BOULDER |
Electrical | May 20, 2026 | 1 | Under $250,000 |
| in-property wastewater service repair | 1045 GILBERT ST, BOULDER |
Other | May 20, 2026 | 1 | Subscribers |
| 6/9/26: Full road closure approved. Replacement of the existing sewer line from sidewalk to city main **contractor must notify impacted resi | 3590 16TH ST, BOULDER |
Plumbing | May 20, 2026 | 1 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* ADR2025-00087 | Proposed Standalone small cell to be installed north o | 3901 28TH ST, BOULDER |
Other | May 20, 2026 | 1 | Under $250,000 |
| ADR2025-00086 | Proposed Standalone small cell to be installed southwest of Kalmia Ave and Kirkwood Pl. Underground power to be installed fr | 2052 KALMIA AVE, BOULDER |
Other | May 20, 2026 | 1 | Under $250,000 |
| Comcast proposes to aerial overlash 69' of coax cable near 911 Cypress **contractor must notify impacted residents 72 hrs in advance; no-par | 911 CYPRESS DR, BOULDER |
Other | May 20, 2026 | 1 | Under $250,000 |
| Occupancy only to Manholes to splice fibers CMS 26020272 **contractor must coordinate with CDOT for any work & TCP in CDOT ROW prior to comm | 4410 ARAPAHOE AVE, BOULDER |
Other | May 20, 2026 | 1 | Under $250,000 |
| Xcel Energy needs to perform a service renewal on gas line due to a gas leak **contractor must notify impacted residents 72 hrs in advance; | 4454 HAMILTON CT, BOULDER |
Plumbing | May 20, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 37Vsquares of dimensional shingles on a pitch represented as | 280 DEVON PL, BOULDER |
Roofing and exterior | May 20, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 23vsquares of dimensional shingles on a pitch represented as | 3486 16TH CIR, BOULDER |
Roofing and exterior | May 20, 2026 | 1 | Under $250,000 |
| Replacing two 40g 40k water heaters. **Any electrical work required beyond a like-for-like replacement of equipment will require an electric | 4198 19TH ST, BOULDER |
Mechanical | May 20, 2026 | 1 | Under $250,000 |
| Replacement central AC. New 3 Zone mini split heat pump. | 1160 HARTFORD DR, BOULDER |
Mechanical | May 20, 2026 | 1 | Under $250,000 |
| Like for like water heater replacement. **Any electrical work required beyond a like-for-like replacement of equipment will require an elect | 4245 EATON CT, BOULDER |
Mechanical | May 20, 2026 | 1 | Under $250,000 |
| Install 2 ton heat pump with 60k btu furnace 96% with reconnect. **Any electrical work required beyond a like-for-like replacement of equipm | 35 BUCKNELL CT, BOULDER |
Mechanical | May 20, 2026 | 3 | Under $250,000 |
| THE PURPOSE OF THIS WORK IS TO MODIFY THE EXISTING FIRE ALARM SYSTEM TO ACCOMMODATE THE NEW LAYOUT OF 4TH FLOOR RESTROOMS AND LOBBY. THE SYS | 2530 JUNCTION PL, BOULDER |
Other | May 20, 2026 | 1 | Under $250,000 |
| THE PROJECT IS A RENOVATION OF AN EXISTING BASEMENT, AN EXISTING LAUNDRY ROOM, AND AN EXISTING POWDER ROOM. ALSO, THE CRAWLSPACE BELOW THE G | 2088 RIVERSIDE LN, BOULDER |
Major renovation | May 20, 2026 | 2 | $250,000 to $1 million |
| **Voided for inactivity - no inspection within 180 days** One monument and wall sign for 5500 Central Ave. | 5500 CENTRAL AVE, BOULDER |
Other | May 20, 2026 | 2 | Under $250,000 |
| Replace 2 ACs and Air Handler **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel b | 1076 LINCOLN PL, BOULDER |
Mechanical | May 20, 2026 | 2 | Under $250,000 |