| Full deconstruction of the existing 4 bed 4 bath approximately 3400sf house. | 2116 KNOLLWOOD DR, BOULDER |
Demolition | Apr 8, 2026 | 1 | Subscribers |
| 1301 and 1375 Walnut (buildings are connected on lowest level) - 14,969 sf interior renovation of existing office suite and labs. Scope buil | 1301 WALNUT ST, BOULDER |
Major renovation | Apr 8, 2026 | 1 | $1 to $5 million |
| New Attached Canopy Structure over the Loading Dock. | 4780 PEARL EAST CIR, BOULDER |
Major renovation | Apr 8, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 10 squares of dimensional shingles on a pitch represented as | 708 ARAPAHOE AVE, BOULDER |
Roofing and exterior | Apr 8, 2026 | 1 | Under $250,000 |
| JB 2538855 | cable vault replacement **Contractor must notify RTD 303-299-6563 of any impacts to bus stops/routes** | 5600 CENTRAL AVE, BOULDER |
Other | Apr 8, 2026 | 1 | Under $250,000 |
| JB 2544038 | damaged cable repair **contractor must provide pedestrian detours at closest crosswalks** **Contractor must notify RTD 303-299- | 2950 GLENWOOD DR, BOULDER |
Other | Apr 8, 2026 | 1 | Under $250,000 |
| Water Heater Replacement **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burnin | 3303 30TH ST, BOULDER |
Mechanical | Apr 8, 2026 | 1 | Under $250,000 |
| Water heater replacement **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burnin | 4896 MCKINLEY DR, BOULDER |
Mechanical | Apr 8, 2026 | 1 | Under $250,000 |
| Partial exterior sewer service line replacement to & including the tap connection via Pipe Bursting. Total length of replacement will be 32' | 4450 CHIPPEWA DR, BOULDER |
Plumbing | Apr 8, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 19 squares of dimensional shingles on a pitch represented as | 2901 6TH ST, BOULDER |
Roofing and exterior | Apr 8, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 24 squares of dimensional shingles on a pitch represented as | 1851 23RD ST, BOULDER |
Roofing and exterior | Apr 8, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 14 squares of dimensional shingles on a pitch represented as | 2825 3RD ST, BOULDER |
Roofing and exterior | Apr 8, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 20 squares of dimensional shingles on a pitch represented as | 2955 17TH ST, BOULDER |
Roofing and exterior | Apr 8, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of detached garage, 5 squares of dimensional shingles on a pitch rep | 2955 17TH ST, BOULDER |
Roofing and exterior | Apr 8, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 18 squares of dimensional shingles on a pitch represented as | 3000 E EUCLID AVE, BOULDER |
Roofing and exterior | Apr 8, 2026 | 1 | Under $250,000 |
| Replacement furnace, new heat pump, electrical for the heat pump, and replacement tankless water heater. **PLEASE NOTE: APPLICABLE ONLY TO S | 700 HAWTHORN AVE, BOULDER |
Mechanical | Apr 8, 2026 | 1 | Under $250,000 |
| Temporary Banner | 2440 ARAPAHOE AVE 230, BOULDER |
Other | Apr 8, 2026 | 1 | Under $250,000 |
| Like for like 40-gallon Atmospheric vent 38,000 BTUs Natural gas water heater. **Any electrical work required beyond a like-for-like replace | 2650 IRIS AVE 22, BOULDER |
Mechanical | Apr 8, 2026 | 1 | Under $250,000 |
| JB0002503133 | occupancy permit for 12 pole corrections near 3505 19th Street **sidewalk section closures for no more than three consecutive | 3505 19TH ST, BOULDER |
Other | Apr 8, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Partial tear-off & reroof of SFD, 6 squares of dimensional shingles on a pitch represented a | 492 UTICA AVE, BOULDER |
Roofing and exterior | Apr 8, 2026 | 1 | Under $250,000 |
| ***4/23/26 REVISED TO REMOVE AND NOT REPLACE SOLAR PV PANELS-REMOVING INSPECTIONS**All Structures must be permitted separately** Total tear- | 941 8TH ST, BOULDER |
Roofing and exterior | Apr 8, 2026 | 1 | Under $250,000 |
| Remove and replace cladding, repair Zip Sheathing System, install diverter flashing and flashings to columns, remove and replace coping cap | 650 TERRACE AVE, BOULDER |
Roofing and exterior | Apr 8, 2026 | 1 | Subscribers |
| JB 2507669 | occupancy for fiber splicing | 2525 ARAPAHOE AVE, BOULDER |
Other | Apr 8, 2026 | 1 | Under $250,000 |
| **Permit scope to be included in BLD-ACC2025-00042 - this permit to be voided** **REVISION 6/5/26- Install 30-Amp dryer circuit, 20-amp wash | 1529 GROVE ST B, BOULDER |
Electrical | Apr 8, 2026 | 2 | Under $250,000 |
| 3 ton electric heat pump installation replacing an existing gas furnace. The gas line will be capped at the removed furnace location. Need t | 705 GILLASPIE DR, BOULDER |
Mechanical | Apr 8, 2026 | 2 | Under $250,000 |
| Installation of one (1) wall-mounted channel letter sign per approved plans and elevations. No changes to building structure; work limited t | 607 S BROADWAY, BOULDER |
Other | Apr 8, 2026 | 2 | Under $250,000 |
| in-property wastewater service repair | 4513 NAVAJO PL, BOULDER |
Other | Apr 8, 2026 | 2 | Under $250,000 |
| 3 ton electric heat pump installation replacing an existing gas furnace. The gas line will be capped at the removed furnace location. Need t | 1312 SANDSTONE CT, BOULDER |
Mechanical | Apr 8, 2026 | 2 | Under $250,000 |
| The scope for the project is to remove an interior wall and door from suite #280 (636 SF). This suite is currently vacant. Our client is req | 1007 PEARL ST 260, BOULDER |
Other | Apr 7, 2026 | 1 | Under $250,000 |
| Remove and replace all decks, stairs, and landings (5 locations). All structures to remain in same place and to be the same size | 4955 MOORHEAD AVE, BOULDER |
Major renovation | Apr 7, 2026 | 1 | $250,000 to $1 million |