| **VOID- Inspections not completed within 180 days** Install heat pump replacing air conditioner. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS W | 1130 JUDSON DR, BOULDER |
Mechanical | Apr 2, 2026 | 1 | Under $250,000 |
| Replacement water heater. **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical permit f | 585 HARTFORD DR, BOULDER |
Mechanical | Apr 2, 2026 | 1 | Under $250,000 |
| Replace 75-gallon water heater **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical per | 2222 14TH ST, BOULDER |
Mechanical | Apr 2, 2026 | 1 | Under $250,000 |
| 40g 60k water heater replacement **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical p | 3120 14TH ST, BOULDER |
Mechanical | Apr 2, 2026 | 1 | Under $250,000 |
| Replace existing furnace & A/C with new. Furnace: 80% AFUE, 80K BTU A/C: 15 SEER, 3 ton **Any electrical work required beyond a like-for-lik | 643 FURMAN WAY, BOULDER |
Mechanical | Apr 2, 2026 | 1 | Under $250,000 |
| Spot repair on the sewer service line in the front yard. | 440 S 39TH ST, BOULDER |
Plumbing | Apr 2, 2026 | 1 | Subscribers |
| WO 115609004 - Road closure for 1 crane set to replace 1 pole and transformer **contractor must notify impacted residents 72 hrs in advance; | 3035 18TH ST, BOULDER |
Other | Apr 2, 2026 | 1 | Under $250,000 |
| N.990391 | pole replacement **no parking signs must be placed a minimum of 72 hours in advance** **impacted residents must be notified a min | 1024 MARINE ST, BOULDER |
Other | Apr 2, 2026 | 1 | Under $250,000 |
| new 1" tap for irrigation with 3/4" meter | utility sub-permit UTL2026-00116 | 650 TERRACE AVE, BOULDER |
Other | Apr 2, 2026 | 1 | Under $250,000 |
| Occupancy only to Manhole to check & splice Fibers CMS 26011740 **contractor must coordinate with CDOT for TCP in CDOT ROW** **work hours 9 | 2525 ARAPAHOE AVE, BOULDER |
Other | Apr 2, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspection within 180 days** Structural upgrades by installing overlapping sister to rafters under solar panels | 601 MARINE ST, BOULDER |
Other | Apr 2, 2026 | 2 | Under $250,000 |
| Gas demo (1) 5x5 street cut (3) potholes **contractor must notify impacted residents 72 hrs in advance; no-parks must be placed 72 hrs in ad | 1559 ORCHARD AVE, BOULDER |
Demolition | Apr 2, 2026 | 2 | Under $250,000 |
| **VOID- Inspections not completed within 180 days****VOID- Inspections not completed within 180 days** **Unit 316** replace water heater 50 | 2785 28TH ST, BOULDER |
Mechanical | Apr 2, 2026 | 2 | Under $250,000 |
| Solar system installation SYSTEM SIZE: 6.88KWDC, 5.58KWAC · 16 Q CELL Q.TRON BLK M-G2+/AC MODULES · 16 Q CELL Q.MI.349B-G1 INVERTER | 1100 LINDEN AVE, BOULDER |
Electrical | Apr 2, 2026 | 2 | Under $250,000 |
| PARKING LANE CLOSURE TO PERFORM CONCRETE PUMPING OPERATIONS OF A LEVEL ONE CONCRETE SLAB DECK | 1550 EISENHOWER DR, BOULDER |
Other | Apr 1, 2026 | 1 | Under $250,000 |
| A Level 3 alteration of the existing walk-out and 1st floor levels of the existing home. Work also includes the addition of a 2nd floor (676 | 1320 BLUEBELL AVE, BOULDER |
Major renovation | Apr 1, 2026 | 1 | $250,000 to $1 million |
| Lot 7. New market rate 2,305 sq. ft. two-story single family detached home. | 150 55TH ST, BOULDER |
Other | Apr 1, 2026 | 1 | $250,000 to $1 million |
| Lot 7. New market rate 2,305 sq. ft. two-story single family detached home. | 150 55TH ST, BOULDER |
Other | Apr 1, 2026 | 1 | Subscribers |
| Lot 8. New affordable 1869 sq. ft. two-story single family detached home. | 140 55TH ST, BOULDER |
Other | Apr 1, 2026 | 1 | $250,000 to $1 million |
| Lot 8. New affordable 2,153 sq. ft. two-story single family detached home. | 140 55TH ST, BOULDER |
Other | Apr 1, 2026 | 1 | Subscribers |
| Lot 9. New affordable 1869 sq. ft. two-story single family detached home. | 130 55TH ST, BOULDER |
Other | Apr 1, 2026 | 1 | $250,000 to $1 million |
| Lot 9. New affordable 2,153 sq. ft. two-story single family detached home. | 130 55TH ST, BOULDER |
Other | Apr 1, 2026 | 1 | Subscribers |
| Lot 6. New 1869 sq. ft. affordable two-story single family detached home. | 146 PEACOCK PL, BOULDER |
Other | Apr 1, 2026 | 1 | Under $250,000 |
| Lot 6. New 2,153 sq. ft. affordable two-story single family detached home. | 146 PEACOCK PL, BOULDER |
Other | Apr 1, 2026 | 1 | Subscribers |
| 662 sf. INTERIOR REMODEL (LEVEL 2 ALTERATION) TO AN EXISTING 3,528 sf. SINGLE FAMILY RESIDENCE. INCLUDES NEW MECHANICAL, ELECTRICAL, AND PLU | 350 HOPI PL, BOULDER |
Other | Apr 1, 2026 | 1 | Under $250,000 |
| **REVISION 5/21/26-Updated one-line and site plan to show battery moved outside and eliminated the second disconnect on one-line. INSTALL 8. | 649 HARTFORD DR, BOULDER |
Electrical | Apr 1, 2026 | 1 | Under $250,000 |
| New 2 to 1 Mini Split heat pump. Exterior equipment to be installed a t least one foot above grade to comply with the floodplain requirement | 405 PEARL ST, BOULDER |
Mechanical | Apr 1, 2026 | 1 | Under $250,000 |
| 5-head tenant finish to meet code coverage for new wall/ceiling layout. | 1805 29TH ST 1124, BOULDER |
Major renovation | Apr 1, 2026 | 1 | Under $250,000 |
| New tenant improvement for Atom Computing remodel of existing suite for new work room/equipment chases/mech rooms/utility room Remodel area; | 2500 55TH ST, BOULDER |
Major renovation | Apr 1, 2026 | 1 | $1 to $5 million |
| Demo old notification . Install new notification for new suite layout. | 2500 55TH ST, BOULDER |
Demolition | Apr 1, 2026 | 1 | Under $250,000 |