| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 28 squares of dimensional shingles on a pitch represented as | 1319 CEDAR AVE, BOULDER |
Roofing and exterior | Mar 12, 2026 | 1 | Under $250,000 |
| Install speaker strobe for Gowning Room remodel. | 6044 LONGBOW CT, BOULDER |
Major renovation | Mar 12, 2026 | 1 | Under $250,000 |
| Comcast proposes to place directional bore 1,385 to install fiber optic cable **contractor must maintain minimum separation of utilities per | 1500 MARIPOSA AVE, BOULDER |
Electrical | Mar 12, 2026 | 1 | Under $250,000 |
| Heat pump water heater with electrical replacing gas water heater. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: A | 4410 HASTINGS DR, BOULDER |
Mechanical | Mar 12, 2026 | 1 | Under $250,000 |
| Install (3) helical piers under the south center (rear) foundation (as shown on the attached plans) to help mitigate future vertical movemen | 1224 MARIPOSA AVE, BOULDER |
Other | Mar 12, 2026 | 1 | Under $250,000 |
| Residential electric UG distribution: Install 40C3 Wood Pole, 1PH Primary Tangent HW, Lashed Secondary Tangent HW, 3" U-Guard, 10" x 14" x 3 | 620 GILLASPIE DR, BOULDER |
Electrical | Mar 12, 2026 | 1 | Under $250,000 |
| **One time 180-day permit extension granted. All work and inspections must be completed by 03/22/2027. ** Installing mini split. Two indoor | 2165 VINE AVE, BOULDER |
Mechanical | Mar 12, 2026 | 2 | Under $250,000 |
| Abandon existing 3/4" water service tap & install new 1" tap and 1" meter | Wastewater service repair to the tap in the alleyway | in-proper | 844 19TH ST, BOULDER |
Other | Mar 12, 2026 | 2 | Under $250,000 |
| (1) INTERNALLY ILLUMINATED CABINET COPY : Barnsley Tire CO. EST 1981 (1) SET FLUSH MOUNTED CHANNEL LETTERS COPY : Barnsley Tire CO. WITH ROU | 2940 VALMONT RD, BOULDER |
Other | Mar 11, 2026 | 1 | Under $250,000 |
| Finish 380 sf basement to include bedroom and 3/4 bathroom. ***4/2/26*** Update to remove exhaust fan from living room | 4187 LONETREE CT, BOULDER |
Other | Mar 11, 2026 | 1 | Under $250,000 |
| Remove and replace all exterior stucco on the exterior of the community. Remove stucco down to sheathing, install new stucco per engineer sp | 2711 MAPLETON AVE, BOULDER |
Roofing and exterior | Mar 11, 2026 | 1 | $250,000 to $1 million |
| ESS installation NEW SYSTEM SIZE: 27.00KWHAC · (2) TESLA POWERWALL 3, 13.50KWH BATTERY PV installed under PMT2011-00145-ELE | 375 OVERLOOK DR, BOULDER |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| ESS installation NEW SYSTEM SIZE: 15.00KWHAC · 1 FRANKLIN APOWER 2, 15.00KWH BATTERY Replacing meter socket and installing new meter PV inst | 4595 SQUIRES CIR, BOULDER |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| ESS battery. Installation of one Tesla Powerwall 3 battery retrofit to an existing PV solar system. PV System Install ELE2020-01327 | 3765 DAVIDSON PL, BOULDER |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| ESS addition to existing PV system | 5074 E LAUREL AVE, BOULDER |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| Add Energy Storage to Existing PV System | 4903 FOUNTAIN ST, BOULDER |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| ESS battery. Installation of one Tesla Powerwall 3 battery retrofit to an existing PV solar system. | 1920 POPLAR AVE, BOULDER |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| ESS addition to existing PV system | 2175 KNOLLWOOD DR, BOULDER |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| Roof-mounted solar and inverter-battery addition to existing solar system | 906 BROOKLAWN DR, BOULDER |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| 115120959 | underground electric cable replacement: directional bore and trenching, 5 potholes **contractor must maintain utility separation | 5145 63RD ST, BOULDER |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 19.67 squares of dimensional shingles on a pitch represented | 2901 LORRAINE CT, BOULDER |
Roofing and exterior | Mar 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 19 squares of dimensional shingles on a pitch represented as | 1365 DREXEL ST, BOULDER |
Roofing and exterior | Mar 11, 2026 | 1 | Under $250,000 |
| install replacement 40 gallon 40k btu low nox gas water heater **Any electrical work required beyond a like-for-like replacement of equipmen | 2010 JOSLYN PL, BOULDER |
Mechanical | Mar 11, 2026 | 1 | Under $250,000 |
| Install Plumis system in new ADU | 3165 E EUCLID AVE, BOULDER |
Other | Mar 11, 2026 | 1 | Under $250,000 |
| Install Plumis system in new ADU | 1380 FAIRFIELD DR, BOULDER |
Other | Mar 11, 2026 | 1 | Under $250,000 |
| New sewer service from garage to existing sewer | 6507 BASELINE RD, BOULDER |
Plumbing | Mar 11, 2026 | 1 | Subscribers |
| in-property wastewater service repair **any restoration must be coordinated with HOA** | 3850 PASEO DEL PRADO, BOULDER |
Other | Mar 11, 2026 | 1 | Subscribers |
| We will need to break up the sidewalk to repair a mainline water (water service). the home has no water at this time **contractor must notif | 920 15TH ST, BOULDER |
Other | Mar 11, 2026 | 1 | Under $250,000 |
| Pole replacement **contractor must notify impacted residents a minimum of 72 hours in advance** **residents must be able to enter and exit t | 1270 26TH ST, BOULDER |
Other | Mar 11, 2026 | 1 | Under $250,000 |
| WO #114875995 - Pole replacement out of ROW traffic control only **contractor must notify impacted residents 72 hrs in advance; no-parks mus | 2489 COLORADO AVE, BOULDER |
Other | Mar 11, 2026 | 1 | Under $250,000 |