| COMCAST PROPOSES TO TIE IN TO MULTIPLE EXISTING SPLICE LOCATIONS INSIDE THE ROW OF THE CITY OF BOULDER, CO 80302 | CONDITIONS OF APPROVAL: * | 2127 16TH ST, BOULDER |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| 40g 40k BTU water heater replacement **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for | 755 S 46TH ST, BOULDER |
Mechanical | Oct 2, 2026 | 1 | Under $250,000 |
| Like for like 50 gal water heater replacement ONLY* Not approved to alter water lines **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BU | 790 POPLAR AVE, BOULDER |
Mechanical | Oct 2, 2026 | 2 | Under $250,000 |
| replacing furnace and installing heat pump. 60K BTU 80% eff furnace. 3 ton 18 seer heat pump **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH | 4475 LAGUNA PL 201, BOULDER |
Mechanical | Oct 2, 2026 | 2 | Under $250,000 |
| Service change. Install new 200 amp service. Install new meter housing, panel, ground rods, cold water bond, intersystem bonding and surge p | 1730 BLUFF ST, BOULDER |
Electrical | Oct 2, 2026 | 2 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 22 squares of dimensional shingles on a pitch represented as | 3930 DARLEY AVE, BOULDER |
Roofing and exterior | Oct 2, 2026 | 2 | Under $250,000 |
| Remove the existing ADA ramp and a portion of the street to determine options for the roof drain connection to existing storm system | repla | 1603 WALNUT ST, BOULDER |
Roofing and exterior | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and replace 19 windows and 1 Door. No alterations to framed opening. U-Factor .27 or better *Window replacements require rough and fi | 5762 ORCHARD CREEK CIR, BOULDER |
Other | Oct 1, 2026 | 1 | Under $250,000 |
| New 5 zone mini split heat pump and associated electrical. All new equipment to be installed at the SW and NE sides of the building to be el | 245 ECHO PL, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| COMCAST PROPOSES TO TIE IN TO MULTIPLE SPLICE LOCATIONS INSIDE THE ROW OF THE CITY OF BOULDER, CO 80302 | CONDITIONS OF APPROVAL: **impacted | 1938 PEARL ST, BOULDER |
Other | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and replace Furnace. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel bur | 1730 COLUMBINE AVE, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| 2 ton electric heat pump installation replacing an existing gas furnace. The gas line will be capped at the removed furnace location. Need t | 4955 TWIN LAKES RD 52, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Installing 10 Zone Mitsubishi Mini Split 1-MXZ-SM60NLHZ-U1 62K BTU COOLING, 58K BTU HEATING HEAT PUMP 1-MXZ-3D30NLHZ 31K BTU COOLING, 21K BT | 865 CIRCLE DR, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| 11/2/2026 - new installation route and scope change from boring to trenching COMCAST PROPOSES TO PLACE DIRECTIONAL BORE 145 FT, AERIAL OVERL | 1500 PEARL ST, BOULDER |
Other | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3267 30TH ST 6, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3267 30TH ST 5, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3267 30TH ST 4, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3267 30TH ST 3, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3267 30TH ST 2, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3267 30TH ST 1, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3265 30TH ST 6, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3265 30TH ST 5, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3265 30TH ST 4, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3265 30TH ST 3, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and recycle the existing 80% furnace. Furnish and install a new 3-ton, two-stage Trane furnace rated at 97% efficiency. Remove and re | 3265 30TH ST 2, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Replace boiler **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burning applianc | 3674 CHASE CT, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| install 30k btu 3 zone cold climate mini split system. Proposal includes new outdoor condenser, condenser wall bracket, 18kbtu indoor head u | 1093 ALBION WAY, BOULDER |
Mechanical | Oct 1, 2026 | 1 | Under $250,000 |
| Remove and replace 15 LF of city sidewalk | CONDITIONS OF APPROVAL: **impacted residents/businesses must be notified a minimum of 72 hours i | 969 10TH ST, BOULDER |
Other | Oct 1, 2026 | 1 | Under $250,000 |
| Emergency Call 09/28 to repair damaged fiber. Emergency repair complete. Pends hard surface restoration sidewalk panel (5x5) | CONDITIONS OF | 2807 SUNDOWN LN, BOULDER |
Other | Oct 1, 2026 | 1 | Under $250,000 |
| **After-the-fact permit** Emergency work: Relocate handhole | 422 PLEASANT ST, BOULDER |
Other | Oct 1, 2026 | 1 | Under $250,000 |