| Alteration and addition to a one-story home that includes the addition of a garage and mudroom, a remodel of the first floor and finished ba | 615 S 42ND ST, BOULDER |
Major renovation | Jan 22, 2026 | 1 | Under $250,000 |
| Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For | 530 22ND ST, BOULDER |
Roofing and exterior | Jan 22, 2026 | 1 | Under $250,000 |
| Modify the fire alarm notification on the 1st floor. All the existing notification devices will be replaced with the new LED devices (FATI) | 6285 LOOKOUT RD, BOULDER |
Other | Jan 22, 2026 | 1 | Under $250,000 |
| **VOID-Inspections not completed within 180 days** Site Lighting on Balsam Ave. South Entry Points- In conjunction with project and permit E | 1198 BALSAM AVE, BOULDER |
Electrical | Jan 22, 2026 | 1 | Under $250,000 |
| Saw cut and remove a portion of the concrete driveway. After excavation, we will install new sewer pipe with proper bedding material and set | 715 GILPIN DR, BOULDER |
Plumbing | Jan 22, 2026 | 1 | Subscribers |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 22 squares of dimensional shingles on a pitch represented as | 1145 PENNSYLVANIA AVE, BOULDER |
Roofing and exterior | Jan 22, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 14 squares of EPDMshingles on a pitch represented as <2/12. | 3307 STANFORD AVE, BOULDER |
Roofing and exterior | Jan 22, 2026 | 1 | Under $250,000 |
| Emergency replacement of water heater with a 40k gallon regular atmospheric vent water heater. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WIT | 180 S 35TH ST, BOULDER |
Mechanical | Jan 22, 2026 | 1 | Under $250,000 |
| Like for like replacement with Quadra-Fire 2100 Millennium Wood Stove. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCE | 3865 NEWPORT LN, BOULDER |
Mechanical | Jan 22, 2026 | 1 | Under $250,000 |
| **VOID-Inspections not completed within 180 days** Main panel upgrade 125A to 200A | 11 GOLDENROD DR, BOULDER |
Electrical | Jan 22, 2026 | 1 | Under $250,000 |
| 200 Amp service replacement | 1457 LODGE LN, BOULDER |
Electrical | Jan 22, 2026 | 1 | Under $250,000 |
| In-property ADU water and wastewater connections **wastewater fees paid on UTL2025-00363** at 968 13th Street. | 970 13TH ST B, BOULDER |
Other | Jan 22, 2026 | 1 | Subscribers |
| Replace furnace - new 100K 96% furnace *Replacement of similar unit in the existing location* **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH | 1159 JUNIPER AVE, BOULDER |
Mechanical | Jan 22, 2026 | 1 | Under $250,000 |
| **VOID-Inspections not completed within 180 days** Navien Boiler Install to replace existing. **Any electrical work required beyond a like-f | 740 JUNIPER AVE, BOULDER |
Mechanical | Jan 22, 2026 | 1 | Under $250,000 |
| Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For | 2185 KOHLER DR, BOULDER |
Roofing and exterior | Jan 22, 2026 | 1 | Under $250,000 |
| Replace WH like for like **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burnin | 2610 IRIS AVE 202, BOULDER |
Mechanical | Jan 22, 2026 | 1 | Under $250,000 |
| water service repair in the private lot of the property. | 6988 INDIAN PEAKS TRL, BOULDER |
Other | Jan 22, 2026 | 1 | Subscribers |
| WILLIAMS 30K BTU WALL FURNACE *No exterior street facing work allowed or requested* **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURN | 505 MOUNTAIN VIEW RD, BOULDER |
Mechanical | Jan 22, 2026 | 1 | Under $250,000 |
| REMOVE & REPLACE (11) WINDOWS AND (1) DOOR LIKE FOR LIKE - NO ALTERATIONS TO FRAMED OPENINGS -U-FACTOR .25 OR BETTER | 1290 JUDSON DR, BOULDER |
Other | Jan 22, 2026 | 1 | Under $250,000 |
| Replace WH like for like **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burnin | 4875 DAKOTA BLVD, BOULDER |
Mechanical | Jan 22, 2026 | 1 | Under $250,000 |
| replace WH like for like **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burnin | 1100 S LASHLEY LN, BOULDER |
Mechanical | Jan 22, 2026 | 1 | Under $250,000 |
| After the fact full structure demolition (removal) of mobile home Unit #24 (4475 Broadway) from the former Ponderosa Mobile Home Park. Unit | 1001 PONDEROSA PL, BOULDER |
Demolition | Jan 22, 2026 | 1 | Subscribers |
| After the fact full structure demolition (removal) of mobile home Unit #63 (4475 Broadway) from the former Ponderosa Mobile Home Park. Unit | 1001 PONDEROSA PL, BOULDER |
Demolition | Jan 22, 2026 | 1 | Subscribers |
| After the fact full structure demolition (removal) of mobile home Unit #31 (4475 Broadway) from the former Ponderosa Mobile Home Park. Unit | 1001 PONDEROSA PL, BOULDER |
Demolition | Jan 22, 2026 | 1 | Subscribers |
| After the fact full structure demolition (removal) of mobile home Unit #41 (4475 Broadway) from the former Ponderosa Mobile Home Park. Unit | 1001 PONDEROSA PL, BOULDER |
Demolition | Jan 22, 2026 | 1 | Subscribers |
| After the fact full structure demolition (removal) of mobile home Unit #27 (4475 Broadway) from the former Ponderosa Mobile Home Park. Unit | 1001 PONDEROSA PL, BOULDER |
Demolition | Jan 22, 2026 | 1 | Subscribers |
| After the fact full structure demolition (removal) of mobile home Unit #22 (4475 Broadway) from the former Ponderosa Mobile Home Park. Unit | 1001 PONDEROSA PL, BOULDER |
Demolition | Jan 22, 2026 | 1 | Subscribers |
| After the fact full structure demolition (removal) of mobile home Unit #17 (4475 Broadway) from the former Ponderosa Mobile Home Park. Unit | 1001 PONDEROSA PL, BOULDER |
Demolition | Jan 22, 2026 | 1 | Subscribers |
| Replace gas water heater with electric heat pump water heater - 80-gallon **Any electrical work required beyond a like-for-like replacement | 2000 IRIS AVE, BOULDER |
Mechanical | Jan 22, 2026 | 2 | Under $250,000 |
| TENANT IMPROVEMENT OF A RESTAURANT INTO ANOTHER RESTAURANT. ALL BATHROOMS ARE EXISTNG AND ACCESSIBLE. NEW LIGHTING, EQUIPMENT, SEATING, BAR | 627 S BROADWAY A, BOULDER |
Major renovation | Jan 21, 2026 | 1 | $250,000 to $1 million |