| **180-day one-time extension request granted. Project must be completed by 3/4/2027.** Finish 975 sq ft of a currently unfinished basement - | 760 S 42ND ST, BOULDER |
Major renovation | Jan 16, 2026 | 1 | Under $250,000 |
| Single-story single family home with walk-out basement with a finished basement. The home is 2016/sf and our work will take place in the exi | 605 ALPINE AVE, BOULDER |
Other | Jan 16, 2026 | 1 | Under $250,000 |
| Remove and replace 7' section of sidewalk **contractor must notify impacted residents as soon as possible** | 4686 INGRAM CT, BOULDER |
Other | Jan 16, 2026 | 1 | Under $250,000 |
| Install: (1) 30' Class 5 Pole (1) UGuard Remove (1) 30' Class 5 Wood Pole **contractor must notify impacted residents and non-emergency poli | 3190 14TH ST, BOULDER |
Other | Jan 16, 2026 | 1 | Under $250,000 |
| Total tear-off & reroof of SFD, 33 squares of dimensional shingles on a pitch represented as 7/12. All roof materials shall be installed per | 2970 JUILLIARD ST, BOULDER |
Roofing and exterior | Jan 16, 2026 | 1 | Under $250,000 |
| Replace furnace - new 80K BTU 80% furnace , like for like. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new p | 240 SEMINOLE DR, BOULDER |
Mechanical | Jan 16, 2026 | 1 | Under $250,000 |
| **3/3/26-Revision to layout and equipment** Install 9.24kW roof mounted solar PV system with 27kWh Tesla Powerwall Energy Storage System | 3941 PROMONTORY CT, BOULDER |
Electrical | Jan 16, 2026 | 1 | Under $250,000 |
| Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For | 70 S 32ND ST, BOULDER |
Roofing and exterior | Jan 16, 2026 | 1 | Under $250,000 |
| 40g 40k water heater replacement **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical p | 50 SOUTH BOULDER CIR 5034, BOULDER |
Mechanical | Jan 16, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 17 squares of dimensional shingles on a pitch represented as | 780 39TH ST, BOULDER |
Roofing and exterior | Jan 16, 2026 | 1 | Under $250,000 |
| Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For | 966 GRANDVIEW AVE, BOULDER |
Roofing and exterior | Jan 16, 2026 | 1 | Under $250,000 |
| Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For | 1056 N TERRACE CIR, BOULDER |
Roofing and exterior | Jan 16, 2026 | 1 | Under $250,000 |
| 1-20-2026 scope update - added two additional transformer demo/replace | TCP added on Broadway** 108519336 | Install: (2) 50KVA XFMRs (1) 40 | 945 GRAPE AVE, BOULDER |
Demolition | Jan 16, 2026 | 1 | Under $250,000 |
| 50' long repair on sewer service repair (pipeburst) from house to tap in street 10' deep install dual sweep clean outs | 4350 BUTLER CIR, BOULDER |
Plumbing | Jan 16, 2026 | 1 | Under $250,000 |
| Replacing 2 ton 19 seer ac and coil / 80% 70 MBTUH gas furnace **Any electrical work required beyond a like-for-like replacement of equipmen | 4844 BRANDON CREEK DR, BOULDER |
Mechanical | Jan 16, 2026 | 1 | Under $250,000 |
| Replace existing furnace with a new 98% AFUE, 60,000 btu/hr furnace. Install new 1.5 ton, 16 SEER a/c system. Replace existing tanked water | 1097 ORANGE PL, BOULDER |
Mechanical | Jan 16, 2026 | 2 | Under $250,000 |
| ADR2025-00162 - Proposed Standalone small cell to be installed northeast of Sumac ave and 15th st. Underground power to be installed from ex | 1503 SUMAC AVE, BOULDER |
Other | Jan 15, 2026 | 1 | Under $250,000 |
| 1 Non-illuminated dimensional letter wall sign *See HIS2025-00385* | 1223 PEARL ST, BOULDER |
Other | Jan 15, 2026 | 1 | Under $250,000 |
| Central Ave Bridge Replacement - Conduit installation. Remove and replace existing light install conduit into new bridge | 5660 CENTRAL AVE, BOULDER |
Electrical | Jan 15, 2026 | 1 | Under $250,000 |
| Roof-mounted solar installation with inverter-battery 9.66 kW DC 11.5 kW AC. | 4685 LUDLOW ST, BOULDER |
Electrical | Jan 15, 2026 | 1 | Under $250,000 |
| Installation of a flush mount, grid-tied, 9.135 kW solar PV system and one Tesla Powerwall 3 battery. | 5543 STONEWALL PL, BOULDER |
Electrical | Jan 15, 2026 | 1 | Under $250,000 |
| ANODE INSTALL 2 POTHOLES TO INSTALL 2 ANODES | 3190 8TH ST, BOULDER |
Other | Jan 15, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspections for 180 days** Remove old furnace and air conditioner. Install new 60,000btu 2 stage up flow furnac | 3515 ARTHUR CT 6, BOULDER |
Mechanical | Jan 15, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspections for 180 days** Remove old furnace and air conditioner. Install new 60,000btu 2 stage up flow furnac | 3515 ARTHUR CT 5, BOULDER |
Mechanical | Jan 15, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspections for 180 days** Remove old furnace and air conditioner. Install new 60,000btu 2 stage up flow furnac | 3515 ARTHUR CT 4, BOULDER |
Mechanical | Jan 15, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspections for 180 days** Remove old furnace and air conditioner. Install new 60,000btu 2 stage up flow furnac | 3515 ARTHUR CT 3, BOULDER |
Mechanical | Jan 15, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspections for 180 days** Remove old furnace and air conditioner. Install new 60,000btu 2 stage up flow furnac | 3515 ARTHUR CT 2, BOULDER |
Mechanical | Jan 15, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspections for 180 days** Remove old furnace and air conditioner. Install new 60,000btu 2 stage up flow furnac | 3515 ARTHUR CT 1, BOULDER |
Mechanical | Jan 15, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspections for 180 days** Remove old furnace and air conditioner. Install new 60,000btu 2 stage up flow furnac | 3510 ARTHUR CT 6, BOULDER |
Mechanical | Jan 15, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspections for 180 days** Remove old furnace and air conditioner. Install new 60,000btu 2 stage up flow furnac | 3510 ARTHUR CT 5, BOULDER |
Mechanical | Jan 15, 2026 | 1 | Under $250,000 |