| Demo gas service - potholes on 10/2, demo on 10/5. (1) 5x5 dig pit (3) potholes Supervisor: Fred Safi 303-919-1838 CONDITIONS OF APPROVAL: * | 334 ARAPAHOE AVE, BOULDER |
Demolition | Sep 23, 2026 | 1 | Under $250,000 |
| Installation of Trane 96% 2-Stage Furnace **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vent | 3505 EASTMAN AVE, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| 13th & Mapleton | 6 utility pole replacements and 1 hardware replacement CONDITIONS OF APPROVAL: **contractor must notify impacted residents | 2243 13TH ST, BOULDER |
Other | Sep 23, 2026 | 1 | Under $250,000 |
| Replacing AC with new AC **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burnin | 5686 CASCADE PL, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| Working rear lots of 803 & 801 Brooklawn Dr & 101 Hickory Ave to install new 40' CL3 pole and upgrade 25KVA overhead transformer to new 50KV | 101 HICKORY AVE, BOULDER |
Other | Sep 23, 2026 | 1 | Under $250,000 |
| Traffic control for Aerial Fiber work. **NO CUTS** Restoration and Activation to follow. JB0002592624 CONDITIONS OF APPROVAL: **contractor m | 2250 18TH AVE, BOULDER |
Other | Sep 23, 2026 | 1 | Under $250,000 |
| remove existing framing from ple and replace with horizontal double circuit double deadend near 490 Marine Street CONDITIONS OF APPROVAL: ** | 490 MARINE ST, BOULDER |
Other | Sep 23, 2026 | 1 | Under $250,000 |
| wastewater tap relocation, abandonment of existing tap CONDITIONS OF APPROVAL: **contractor must coordinate any restoration and TCP with Bou | 4842 EARLE CIR, BOULDER |
Other | Sep 23, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 17.16 squares of dimensional shingles on a pitch represented | 835 YELLOW PINE AVE, BOULDER |
Roofing and exterior | Sep 23, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 29 squares of dimensional shingles on a pitch represented as | 525 ITHACA DR, BOULDER |
Roofing and exterior | Sep 23, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 20 squares of dimensional shingles on a pitch represented as | 530 HARTFORD DR, BOULDER |
Roofing and exterior | Sep 23, 2026 | 1 | Under $250,000 |
| Replacement of 100,000 BTU 92% Gas Furnace with 100,000 BTU 98% Gas Furnace AC: Replacement of 3.5 Ton 17 SEER AC with 3 Ton 20 SEER HP **An | 525 AURORA AVE, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| Replace furnace with new ducted heat pump system Replace water heater with new tankless water heater **Any electrical work required beyond a | 1597 GILLASPIE DR, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| replacement furnace and air conditioner with associated electrical **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: A | 835 11TH ST, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| 3 TON ELECTRIC HEAT PUMP INSTALLATION REPLACING AN EXISTING GAS FURNACE. THE GAS LINE WILL BE CAPPED AT THE REMOVED FURNACE LOCATION. NEED T | 925 ITHACA DR, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| Like for like 50 gal water heater replacement **Any electrical work required beyond a like-for-like replacement of equipment will require an | 16 KINNIKINNICK RD, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| replacing furnace and AC. 60K BTU 80% eff furnace. 3 ton 16 seer heat pump existing electrical. replacing water heater 50K BTU 67% **Any ele | 4776 FRANKLIN DR, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| Install replacement swamp cooler **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fue | 1450 PATTON DR, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| Sewer repair in the backyard | 610 STREAMSIDE LN, BOULDER |
Plumbing | Sep 23, 2026 | 1 | Subscribers |
| Sewer service line spot repair under the drive way in front of the property address. Total length of replacement will be 8' long and up to 6 | 1285 MEADOW PL, BOULDER |
Plumbing | Sep 23, 2026 | 1 | Subscribers |
| Replace AC condenser with Heat Pump Condenser. No electrical upgrades. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCE | 902 GRANT PL, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| Pipe burst from building drain up to plastic transition all in yard. Going around a tree is why we are requesting Pipe burst. | 280 CACTUS CT, BOULDER |
Other | Sep 23, 2026 | 1 | Subscribers |
| Install 40 gallon natural gas water heater. Installation will Include the following items: Emergency Shut-off Valve Supply Lines Thermal Exp | 1850 22ND ST 2, BOULDER |
Mechanical | Sep 23, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 13 squares of dimensional shingles on a pitch represented as | 850 INCA PKWY, BOULDER |
Roofing and exterior | Sep 23, 2026 | 1 | Under $250,000 |
| Alteration of an existing 2 story wood framed building for a medical office TI (B-occupancy), approx. 4578sf. Site work will include securit | 5360 MANHATTAN CIR, BOULDER |
Major renovation | Sep 23, 2026 | 1 | $1 to $5 million |
| Remove and Replace 1 set French Doors Like for Like - no opening mod | 2513 BRIARWOOD DR, BOULDER |
Other | Sep 23, 2026 | 3 | Under $250,000 |
| Detach and reset existing PV as permitted by PMT2007-02529-ELE. **All Structures must be permitted separately** Total tear-off & reroof of S | 2881 21ST ST, BOULDER |
Roofing and exterior | Sep 23, 2026 | 2 | Under $250,000 |
| 3 ton electric heat pump installation replacing an existing gas furnace. The gas line will be capped at the removed furnace location. Need t | 720 GILLASPIE DR, BOULDER |
Mechanical | Sep 23, 2026 | 3 | Under $250,000 |
| **Voided for inactivity - no inspections for 180 days** 2 RTU replacement like for like **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL | 1709 33RD ST, BOULDER |
Mechanical | Sep 23, 2026 | 2 | Under $250,000 |
| LEVEL 1 ALTERATION OF 67 SF INTERIOR SPACE, INCLUDING REPLACING FIXTURES AND FINISHES IN 1 BATHROOM, AND REPAIR/REPLACE WALL FINISHES AND DE | 1270 JUDSON DR, BOULDER |
Other | Sep 22, 2026 | 1 | Under $250,000 |