| New 3 zone mini split heat pump and associated electrical HYPER-MXZ-3D30NLHZ Mitsubishi Hyper Heat MXZ-3D 30,000 BTU Outdoor Unit Heat Pump | 2290 HILLSDALE CIR, BOULDER |
Mechanical | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 51.28 squares of dimensional shingles on a pitch represented | 3671 HAZELWOOD CT, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 51.86 squares of dimensional shingles on a pitch represented | 3653 HAZELWOOD CT, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 55 squares of dimensional shingles on a pitch represented as | 3633 HAZELWOOD CT, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 50.69 squares of dimensional shingles on a pitch represented | 3605 HAZELWOOD CT, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Garage Total tear-off & reroof of SFD, 5.94 squares of dimensional shingles on a pitch repre | 3642 HAZELWOOD CT, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 12.59 squares of dimensional shingles on a pitch represented | 3642 HAZELWOOD CT, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Garage Total tear-off & reroof of SFD, 5.94 squares of dimensional shingles on a pitch repre | 3644 HAZELWOOD CT, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 12.59 squares of dimensional shingles on a pitch represented | 3644 HAZELWOOD CT, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 17.95 squares of dimensional shingles on a pitch represented | 3646 HAZELWOOD CT, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 24.56 squares of dimensional shingles on a pitch represented | 3648 HAZELWOOD CT, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 37.66 squares of dimensional shingles on a pitch represented | 2980 WASHINGTON ST, BOULDER |
Roofing and exterior | Sep 11, 2026 | 1 | Under $250,000 |
| Furnace and WH Install. Reconnect. Water Heater: Bradford White RG2PDV50H6N Furnace: Bryant 926TC48060V17 **PLEASE NOTE: APPLICABLE ONLY TO | 4598 SPRUCEDALE PL, BOULDER |
Mechanical | Sep 11, 2026 | 1 | Under $250,000 |
| in-property water and wastewater connections to ADU - fees paid on utility sub-permit UTL2026-00302 | 865 34TH ST, BOULDER |
Other | Sep 11, 2026 | 1 | Subscribers |
| in-property wastewater service repair | 736 MOHAWK DR, BOULDER |
Other | Sep 11, 2026 | 1 | Subscribers |
| in-property water and wastewater service repairs | 603 SPRUCE ST, BOULDER |
Other | Sep 11, 2026 | 1 | Subscribers |
| Demo gas service (1) 5x5 dig pit (3) potholes Supervisor: Fred Safi 303-919-1838 CONDITIONS OF APPROVAL: **impacted residents/businesses mus | 1125 HARTFORD DR, BOULDER |
Demolition | Sep 11, 2026 | 1 | Under $250,000 |
| Small Cell Facility Due to system limitations, wireless facility permits have two permits that require review, approval and inspection toget | 1032 55TH ST, BOULDER |
Electrical | Sep 11, 2026 | 3 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* ADR2025-00299 | Proposed Streetlight small cell to be installed southe | 498 15TH ST, BOULDER |
Other | Sep 11, 2026 | 3 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* ADR2025-00110 | Proposed Streetlight small cell to be installed north | 3050 8TH ST, BOULDER |
Other | Sep 11, 2026 | 3 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* ADR2025-00249 | Proposed Streetlight small cell to be installed along | 804 IRIS AVE, BOULDER |
Other | Sep 11, 2026 | 2 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* Proposed Streetlight small cell to be installed northwest of Forest Av | 3201 4TH ST, BOULDER |
Other | Sep 11, 2026 | 2 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* ADR2025-00271 | Proposed Streetlight small cell to be installed west o | 1501 GREENBRIAR BLVD, BOULDER |
Other | Sep 11, 2026 | 3 | Under $250,000 |
| INSTALL MULTI-ZONE DUCTLESS HEAT PUMP 1.5-TON OUTDOOR + 2 INDOOR HEADS. Install GFCI -Run line set under patio through shed as much as possi | 850 INCA PKWY, BOULDER |
Mechanical | Sep 11, 2026 | 2 | Under $250,000 |
| ADR2025-00109 | Comcast proposes to place directional bore 4,736, aerial overlash 972' and riser up and down 50' to install fiber optic cabl | 2299 FOREST AVE, BOULDER |
Other | Sep 11, 2026 | 2 | Under $250,000 |
| WO 116031747 - Bore 25' of 4" secondary line and conduit, install new equipment for Xcel **contractor must notify impacted residents, busine | 970 13TH ST A, BOULDER |
Other | Sep 11, 2026 | 2 | Under $250,000 |
| JB 1900353 | Small Cell ADR2025-00163 | bore 1400' feet to install fiber optic cable **contractor must schedule pre-con with inspector Joe B | 2991 19TH ST, BOULDER |
Other | Sep 11, 2026 | 2 | Under $250,000 |
| Installation of new NFPA 13D fire sprinkler system with pump and tank supply (FSN 13D) | 1951 VISTA DR, BOULDER |
Other | Sep 11, 2026 | 4 | Under $250,000 |
| **REVISION 10/6/2026- Slot drain and associated drainage and venting added to drawing. Ancillary dog wash drains removed. Additional floor s | 1225 ALPINE AVE, BOULDER |
Other | Sep 10, 2026 | 1 | Under $250,000 |
| Main level: remodel the powder bath, paint and add wallcovering in the dining room, add storage in foyer and replace a few light fixtures. L | 1430 LODGE LN, BOULDER |
Major renovation | Sep 10, 2026 | 1 | $250,000 to $1 million |