| Replacing 50 gallon power vent **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel | 4551 13TH ST D, BOULDER |
Mechanical | Sep 4, 2026 | 1 | Under $250,000 |
| Replacing 3 ton 16 seer heat pump (Main Level) Replacing 3 ton 16 seer heat pump (Attic System) **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WI | 727 EVERGREEN AVE, BOULDER |
Mechanical | Sep 4, 2026 | 1 | Under $250,000 |
| Install 3-Ton High-Efficiency Low-Ambient Heat Pump Air Conditioning System w/ 5KW Heat Strips 17.5" Wide. Installation of a new electrical | 4198 NEVIS ST, BOULDER |
Mechanical | Sep 4, 2026 | 2 | Under $250,000 |
| This is a resubmittal following the previous permit FEN2025-00019 getting voided due to no site inspection. The previous permit had already | 2940 18TH ST, BOULDER |
Other | Sep 4, 2026 | 1 | Under $250,000 |
| in-property wastewater service repair | 3600 BERKLEY AVE, BOULDER |
Other | Sep 4, 2026 | 1 | Subscribers |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 24 squares of dimensional shingles on a pitch represented as | 1564 NORTH ST, BOULDER |
Roofing and exterior | Sep 4, 2026 | 1 | Under $250,000 |
| No current AC in home Installing: 1-Amana ALXS4BA3010 30K BTU 15.2SEER2 R-32 Single Stage AC 1-Amana CAPTA3626B3 Cased Coil **PLEASE NOTE: A | 2705 JUILLIARD ST, BOULDER |
Mechanical | Sep 4, 2026 | 1 | Under $250,000 |
| 2614111 - Spec Suite C201 & Restrooms | 2511 55TH ST, BOULDER |
Other | Sep 4, 2026 | 1 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* ADR2025-00138 | Proposed Streetlight small cell to be installed northe | 794 GRANT PL, BOULDER |
Other | Sep 4, 2026 | 3 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 17 squares of dimensional shingles on a pitch represented as | 4814 W MOORHEAD CIR, BOULDER |
Roofing and exterior | Sep 4, 2026 | 3 | Under $250,000 |
| JB 1900579 | Small Cell ADR2025-00201 | bore 1325 ft. to install fiber optic cable near 1895 Lehigh **contractor must provide pedestrian det | 2090 LEHIGH ST, BOULDER |
Other | Sep 4, 2026 | 2 | Under $250,000 |
| Replace two poles. Pole 1 to 45' CL3 pole and install new 50 kva transformer. Pole 2 to 40' CL3 pole, with new 350 AL TPLX to existing pedes | 3147 8TH ST, BOULDER |
Other | Sep 4, 2026 | 2 | Under $250,000 |
| Deconstruction of home. | 2190 LINDEN AVE, BOULDER |
Demolition | Sep 4, 2026 | 2 | $1 to $5 million |
| Unenclosed pergola in the rear yard with < 50% coverage and electrical heating elements only. | 3355 VISTA DR, BOULDER |
Electrical | Sep 4, 2026 | 4 | Under $250,000 |
| ESS battery. Installation of one Tesla Powerwall 3 battery and two Tesla Powerwall 3 DC Expansion Packs. | 710 WILLOWBROOK RD, BOULDER |
Electrical | Sep 4, 2026 | 2 | Under $250,000 |
| Single Family Home remodel. Work was completed and permit is being obtained retroactively. Scope includes interior remodel, replacement of A | 1380 ITHACA DR, BOULDER |
Major renovation | Sep 3, 2026 | 1 | Under $250,000 |
| Supply and install like for like 125-amp service. | 4430 GRINNELL AVE, BOULDER |
Electrical | Sep 3, 2026 | 1 | Under $250,000 |
| New emergency generator | 2091 63RD ST, BOULDER |
Other | Sep 3, 2026 | 1 | Under $250,000 |
| Install two new non-illuminated wall signs for State Farm. | 1919 8TH ST, BOULDER |
Other | Sep 3, 2026 | 1 | Under $250,000 |
| Add conference room in second floor tenant suite. | 2045 BROADWAY, BOULDER |
Other | Sep 3, 2026 | 1 | Under $250,000 |
| The primary goal of the project is to stabilize headcutting and decrease erosion in a grassland intermediate stream. Originally observed sev | 0 HWY 128, BOULDER |
Other | Sep 3, 2026 | 1 | Subscribers |
| Replacing gas water heater with 120 volt heat pump water heater, no electrical needed. outlet present. **PLEASE NOTE: APPLICABLE ONLY TO SYS | 1125 TOEDTLI DR, BOULDER |
Mechanical | Sep 3, 2026 | 1 | Under $250,000 |
| Replace and install 13.2seer 3 ton ac with electrical disconnect and reconnect **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING A | 4868 10TH ST, BOULDER |
Mechanical | Sep 3, 2026 | 1 | Under $250,000 |
| Replace existing furnace and ac. No electrical upgrades. **Any electrical work required beyond a like-for-like replacement of equipment will | 2365 JUNIPER AVE, BOULDER |
Mechanical | Sep 3, 2026 | 1 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* ADR2025-00321 | Proposed Streetlight small cell to be installed Southe | 1902 MARIPOSA AVE, BOULDER |
Other | Sep 3, 2026 | 1 | Under $250,000 |
| Remove and Replace 785 sq Ft Concrete Sidewalk | 601 POPLAR AVE, BOULDER |
Other | Sep 3, 2026 | 1 | Subscribers |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 23 squares of dimensional shingles on a pitch represented as | 3540 CATALPA WAY, BOULDER |
Roofing and exterior | Sep 3, 2026 | 1 | Under $250,000 |
| New Auxillary Dwelling Unit installed with an NFPA 13D sprinkler system. The sprinkler system will be a wet system and will be required to b | 3161 7TH ST B, BOULDER |
Other | Sep 3, 2026 | 1 | Under $250,000 |
| in-property wastewater connection to ADU | 890 30TH ST, BOULDER |
Other | Sep 3, 2026 | 1 | Subscribers |
| ADR2025-00060 | Proposed Standalone small cell to be installed southwest of Violet Ave and 22nd St. Underground power to be installed from e | 2201 VIOLET AVE, BOULDER |
Other | Sep 3, 2026 | 1 | Under $250,000 |