| New central heat pump and associated electrical. New 2 zone mini split heat pump system X 2 and associated electrical. **PLEASE NOTE: APPLIC | 1002 ROSEHILL DR, BOULDER |
Mechanical | Jul 30, 2026 | 1 | Under $250,000 |
| Install replacement 97% 80k btu furnace and new 2.5-ton heat pump w/Heat Pump Circuit 15'-75'. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WIT | 3795 BRITTING AVE, BOULDER |
Mechanical | Jul 30, 2026 | 1 | Under $250,000 |
| SYSTEM SIZE: 6.88KWDC, 5.58KWAC · 16 Q.CELLS Q.TRON BLK M-G2+/AC 430W MODULES · 16 Q CELL Q.MI.349B-G1 INVERTER | 5025 3RD ST, BOULDER |
Electrical | Jul 30, 2026 | 1 | Under $250,000 |
| Place a 6 yard roll off curbside in front of the home for construction debris. To the right of the driveway | 1205 MARIPOSA AVE, BOULDER |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| Gas demo (1) 5x5 street cut (3) potholes **contractor must notify impacted residents 72 hrs in advance; no-parks must be placed 72 hrs in ad | 1084 GRANT PL, BOULDER |
Demolition | Jul 30, 2026 | 1 | Under $250,000 |
| tree pruning **contractor must notify impacted residents and complexes 72 hrs in advance; no-parks must be placed 72 hrs in advance** | 1955 3RD ST, BOULDER |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| Gas demo (1) 5x5 street cut (3) potholes **contractor must notify impacted residents 72 hrs in advance; no-parks must be placed 72 hrs in ad | 1995 DARTMOUTH AVE, BOULDER |
Demolition | Jul 30, 2026 | 1 | Under $250,000 |
| 4 utility pole replacements on East side of 63rd, South of Spine in utility easements **sidewalk closure for no more than 3 consecutive days | 6304 SPINE RD, BOULDER |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| 4 utility pole replacements all on the east side of 63rd St. All in soft surface **contractor must notify impacted businesses and residents | 6350 GUNPARK DR, BOULDER |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| Installation of a new 3-ton Lennox heat pump and 90K BTU gas furnace system, including a bypass humidifier, whole-house media air cleaner, d | 5245 CENTENNIAL TRL, BOULDER |
Mechanical | Jul 30, 2026 | 1 | Under $250,000 |
| Standard Air Condition replacement. Replacing AC condenser, flushing line set, installing new coil. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEM | 485 OAKWOOD PL, BOULDER |
Mechanical | Jul 30, 2026 | 1 | Under $250,000 |
| 1680 Range St - WO#106317952 - Gas Service Renewal - Abandon 65' of 1 1/4" S.W. Gas Svc Pipe - Install - 70' of 1 1/4" PE Svc Pipe via 1-6'X | 1680 RANGE ST, BOULDER |
Plumbing | Jul 30, 2026 | 1 | Under $250,000 |
| Replacing existing AC and Furnace with new Heat Pump and Furnace for single family dwelling **Any electrical work required beyond a like-for | 2790 EMERSON AVE, BOULDER |
Mechanical | Jul 30, 2026 | 1 | Under $250,000 |
| Installation of a Lennox 110,000 BTU two-stage variable-speed 97% efficient gas furnace and Lennox 4-ton heat pump with matching evacuator c | 5381 OAK TREE CT, BOULDER |
Mechanical | Jul 30, 2026 | 1 | Under $250,000 |
| Replacement of existing AC with new Heat Pump **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued | 780 RACQUET LN, BOULDER |
Mechanical | Jul 30, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 23 squares of dimensional shingles on a pitch represented as | 2405 DARTMOUTH AVE, BOULDER |
Roofing and exterior | Jul 30, 2026 | 2 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 26 squares of dimensional shingles on a pitch represented as | 805 LINDEN AVE, BOULDER |
Roofing and exterior | Jul 30, 2026 | 1 | Under $250,000 |
| *Revision 7/30/26 to reduce size of sign* New Channel letter sign for Ever Sky, | 4730 BROADWAY, BOULDER |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| 6' SEWER SERVICE REPAIR IN THE FRONT YARD 5' IN DEPTH. PVC-40 AS PIPE, SQUEEGEE AS BEDDING, AND STRONGBACK COUPLING CONNECTIONS. | 2310 JASPER CT, BOULDER |
Plumbing | Jul 30, 2026 | 2 | Subscribers |
| Replace main electrical panel & upgrade service (100A->200A) | 3050 VASSAR DR, BOULDER |
Electrical | Jul 30, 2026 | 2 | Under $250,000 |
| Existing carport enclosure | 743 MARINE ST, BOULDER |
Other | Jul 29, 2026 | 1 | Under $250,000 |
| Install 2 new wall mounted internally illuminated signs. Elevate Nail Spa - Unit 3 | 2850 BASELINE RD 3, BOULDER |
Other | Jul 29, 2026 | 1 | Under $250,000 |
| INTERIOR REMODEL OF AN EXISTING 821 sf. SINGLE FAMILY RESIDENCE. A SINGLE STORY 546 sf. ADDITION (KITCHEN, BEDROOM AND LIVING ROOM) IS PROPO | 3134 10TH ST, BOULDER |
Major renovation | Jul 29, 2026 | 1 | Under $250,000 |
| Adjustable EV charger install: Hardwire, 50amps, Electrical Wiring (WIR), Private EV charging station (Residential) | 3124 EASTWOOD CT, BOULDER |
Electrical | Jul 29, 2026 | 1 | Under $250,000 |
| Remove existing furnace and AC, replace with the following: Furnace 60,000BTU 96% AFUE. Heat Pump: 3 TON 19 SEER. **PLEASE NOTE: APPLICABLE | 1440 LANDIS CT, BOULDER |
Mechanical | Jul 29, 2026 | 1 | Under $250,000 |
| COMCAST PROPOSES TO PROOF AND PULL 475 FT TO INSTALL FIBER OPTIC CABLE TO 6101 BEN PL INSIDE THE ROW OF THE CITY OF BOULDER, CO 80301 **cont | 6101 BEN PL, BOULDER |
Roofing and exterior | Jul 29, 2026 | 1 | Under $250,000 |
| heat pump replacing air conditioner with associated electrical | 2700 VALMONT RD 2, BOULDER |
Mechanical | Jul 29, 2026 | 1 | Under $250,000 |
| 2 utility pole replacements on the West side of N 71st & traffic control for third pole outside city limits **contractor must notify impacte | 7101 LA VISTA PL 100, BOULDER |
Other | Jul 29, 2026 | 1 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* ADR2025-00298 | Proposed Standalone small cell to be installed northwe | 3005 14TH ST, BOULDER |
Other | Jul 29, 2026 | 1 | Under $250,000 |
| Addition of a Mitsubishi single zone mini split system with 1 head. Electrical upgrades. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL | 1705 QUINCE AVE, BOULDER |
Mechanical | Jul 29, 2026 | 1 | Under $250,000 |