| Remove existing door and OH door and replace with new. Remove and replace damaged brick. to correct violation BLDG-CASE-26-000410 | 316 FARMINGTON AV, HARTFORD, CT 06105, HARTFORD |
Roofing and exterior | Aug 16, 2026 | 1 | Under $250,000 |
| Permitable Work will consist of: Entry Way: 1/2" - drywall per LF - up to 2' tall 14.33 LF Batt insulation - 4" - R13 - paper / foil faced 6 | 141 WOODLAND ST, #816, HARTFORD, CT 06105, HARTFORD |
Major renovation | Aug 16, 2026 | 1 | Under $250,000 |
| Install low voltage access button wires in flex conduit under new deck Doonsbury Hall deck | 90 VERNON ST, #DOONSBURY, HARTFORD, CT 06106, HARTFORD |
Other | Aug 16, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. MISC-PLM-26-000380 | 263 BRANFORD ST, HARTFORD, CT 06112, HARTFORD |
Other | Aug 16, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. REF: MISC-PLM-26-000070 | 74 YALE ST, HARTFORD, CT 06114, HARTFORD |
Other | Aug 16, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. REF: MISC-PLM-25-000673 | 203 SHERBROOKE AV, HARTFORD, CT 06106, HARTFORD |
Other | Aug 16, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. REF: MISC-PLM-26-000038 | 199 BRANFORD ST, HARTFORD, CT 06112, HARTFORD |
Other | Aug 16, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. REF: MISC-PLM-26-000290 | 70 SOUTH ST, HARTFORD, CT 06114, HARTFORD |
Other | Aug 16, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. REF: MISC-PLM-26-000046 | 407 GRANBY ST, HARTFORD, CT 06112, HARTFORD |
Other | Aug 16, 2026 | 1 | Under $250,000 |
| Renovation to existing buildings (Brainard, Cooley-Williams, Goodwin) - Install light fixtures and controls, new branch wiring devices, call | 1680 ALBANY AV, HARTFORD, CT 06105, HARTFORD |
New commercial construction | Aug 16, 2026 | 1 | Under $250,000 |
| replace 200 AMPS service cable from weatherhead to meter box. Damaged. CRS# 285 29 314 | 10 BALTIC ST, HARTFORD, CT 06112, HARTFORD |
Other | Aug 16, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. MISC-PLM-25-000871 | 126 BABCOCK ST, HARTFORD, CT 06106, HARTFORD |
Other | Aug 16, 2026 | 1 | Under $250,000 |
| Run low voltage cables:, 14 Cat6, 40 RG6, 80 HDMI. REF:COM-ALT-26-000240 | 185 ASYLUM ST, #28FL, HARTFORD, CT 06103, HARTFORD |
Other | Aug 16, 2026 | 1 | Under $250,000 |
| The Open Hearth is undertaking renovations to the main bathrooms located on the third and fourth floors. The scope of work includes the demo | 150 CHARTER OAK AV, HARTFORD, CT 06106, HARTFORD |
Demolition | Aug 16, 2026 | 3 | $250,000 to $1 million |
| Strip and re roof 15 squares to code. Inspect wood decking and repair if needed. Ice and water entire roof . Felt, synthetic underlayment, 4 | 221 THOMASTON ST, HARTFORD, CT 06112, HARTFORD |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| Install roof mounted solar/PV system, 26 panels (10.66 kW DC). | 120 WHITNEY ST, HARTFORD, CT 06105, HARTFORD |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| Install roof mounted solar/PV system, 12 panels (4.92 kW DC). | 18 MC LEAN ST, HARTFORD, CT 06114, HARTFORD |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| Remove and replace (4) bedroom windows. No structural changes. | 53 HEBRON ST, HARTFORD, CT 06112, HARTFORD |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| Full Roof Replacement of approximately 14 sq using GAF shingle as well as new Ice & Water, deck tape and synthetic felt. | 20 SIMPSON ST, HARTFORD, CT 06112, HARTFORD |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| Replacing roof with new roof and siding 25sq | 235 BRANFORD ST, HARTFORD, CT 06112, HARTFORD |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| Remove and dispose of the existing roofing system. Inspect and replace damaged roof decking as needed (additional cost if required). Install | 11 SARGEANT ST, HARTFORD, CT 06105, HARTFORD |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| We are having a wellness Fair. We are going to have 1 bouncy house , 1 stage and 3 generators. Two-12 x 16 tents (stage) and one-bouncy hous | 21 GRAND ST, HARTFORD, CT 06106, HARTFORD |
Other | Aug 14, 2026 | 2 | Under $250,000 |
| Full Residential Re-Roof, 1 Layer Comp Shingle, No Structral Work Required | 153 KENYON ST, HARTFORD, CT 06105, HARTFORD |
Roofing and exterior | Aug 13, 2026 | 1 | Under $250,000 |
| Patching of three damaged roof areas with same EPDM membrane. | 59 SUMNER ST, #PH, HARTFORD, CT 06105, HARTFORD |
Roofing and exterior | Aug 13, 2026 | 1 | Under $250,000 |
| REVIEW ELECTRICAL EQUIPMENT PER NOTICE OF VIOLATION | 59 SUMNER ST, #101, HARTFORD, CT 06105, HARTFORD |
Electrical | Aug 13, 2026 | 1 | Under $250,000 |
| Remove BWV and Install Sump Pump | 173 BARBOUR ST, HARTFORD, CT 06120, HARTFORD |
Other | Aug 12, 2026 | 1 | Under $250,000 |
| BWV and Sump Pump Installation | 65 OAKLAND TER, HARTFORD, CT 06112, HARTFORD |
Other | Aug 12, 2026 | 1 | Under $250,000 |
| BWV and Sump Pump Installation | 498 PROSPECT AV, HARTFORD, CT 06105, HARTFORD |
Other | Aug 12, 2026 | 1 | Under $250,000 |
| "A9.i - re-reoute main sewer line in basement from leaving out of the south wall near the SW corner to along the south wall and out the SE c | 37 VIOLET ST, HARTFORD, CT 06095, HARTFORD |
Plumbing | Aug 12, 2026 | 1 | Under $250,000 |
| BWV and Sump Pump Installation | 50 OLIVER ST, HARTFORD, CT 06106, HARTFORD |
Other | Aug 12, 2026 | 1 | Under $250,000 |