| Remove old and replace rear basement door and screen door with new steel door with wire embedded glass and wood screen door, repair and repo | 7 COLUMBIA ST, HARTFORD, CT 06106, HARTFORD |
Roofing and exterior | Aug 4, 2026 | 1 | Under $250,000 |
| Remove and replace roofing. 29 squares architectural shingle, ice & water and 3/4" plywood if needed | 236 GIRARD AV, HARTFORD, CT 06105, HARTFORD |
Roofing and exterior | Aug 4, 2026 | 1 | Under $250,000 |
| Remove and replace (2) kitchen entry door with storm (4) windows Location (Bedroom, Living room). No structural changes. | 58 PERSHING ST, HARTFORD, CT 06112, HARTFORD |
Roofing and exterior | Aug 4, 2026 | 1 | Under $250,000 |
| UPGRADE BATHROOM AND ADDING 1 BATHROOM, FRAMING AN EXISTING ROOM | 699 BROADVIEW TER, HARTFORD, CT 06106, HARTFORD |
Other | Aug 4, 2026 | 2 | Under $250,000 |
| i need an inspection for the service for eversource to turn the power on. CRS# 242 93 943 | 254 SOUTH WHITNEY ST, HARTFORD, CT 06105, HARTFORD |
Other | Aug 4, 2026 | 2 | Under $250,000 |
| SHEETROCK OUT DUE TO FLOOD | 235 SAYBROOKE ST, HARTFORD, CT 06106, HARTFORD |
Other | Aug 1, 2026 | 1 | Under $250,000 |
| EMERGENCY Install Rheem 50-Gallon Standard Gas Tall 12-Year Warranty, Store SKU #1000034941, Model # XG50T12HE40U0 | 10 RODNEY ST, HARTFORD, CT 06105, HARTFORD |
Plumbing | Aug 1, 2026 | 1 | Under $250,000 |
| BWV and Sump Pump Installation. ORIENT THE DISCHARGE SUCH THAT IT WILL NOT CREATE A PUBLIC NUISANCE. | 219 LYME ST, HARTFORD, CT 06112, HARTFORD |
Other | Aug 1, 2026 | 1 | Under $250,000 |
| Remove and replace the existing mini split equipment in the exact same location and footprint as original with new Daikin brand RXF18AXVJU c | 105 KENYON ST, HARTFORD, CT 06105, HARTFORD |
Other | Jul 31, 2026 | 1 | Under $250,000 |
| 200A overhead service. Meters located on right side, Location to remain New 2 gang meter (2) , New riser, New main x2, new feeders x2, new p | 20 MC LEAN ST, HARTFORD, CT 06114, HARTFORD |
Other | Jul 31, 2026 | 1 | Under $250,000 |
| 11th Floor: Installation of 11 Access Control Readers 11 Motion Detectors 2 Exit Buttons 11 Locks 1 Alpha Touch Intercom. FIRE MARSHAL REQUI | 755 MAIN ST, #11TH, HARTFORD, CT 06103, HARTFORD |
Other | Jul 31, 2026 | 1 | Under $250,000 |
| 200A overhead service Meter located left side of home , Location to remain (POA MOVING TO THE FRONT PER UTILTIY AND TOWN SITE VISIT) New 3 g | 437 EDGEWOOD ST, HARTFORD, CT 06112, HARTFORD |
Other | Jul 31, 2026 | 1 | Under $250,000 |
| repair framing as per drawings described add insulation where exterior walls were exposed overlay sheetrock throughout all three floors and | 101 ENFIELD ST, HARTFORD, CT 06112, HARTFORD |
Roofing and exterior | Jul 31, 2026 | 3 | Under $250,000 |
| REPLACE REAR PORCH EGRESS | 36 BEDFORD ST, HARTFORD, CT 06120, HARTFORD |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| REMOVE CONCRETE STEP AND BUILD FRONT PORCH WITH NEW STEPS | 214 MATHER ST, HARTFORD, CT 06112, HARTFORD |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| Remove and replace shingle roof | 71 VERNON ST, HARTFORD, CT 06106, HARTFORD |
Roofing and exterior | Jul 30, 2026 | 1 | Under $250,000 |
| Temp Installation of two 5kw Generators and a stage.(8 x 16). No heating. No Cooking. No seating. Setup -7-24-26 | 2 MAHL AV, HARTFORD, CT 06120, HARTFORD |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| KINGS CHAPEL TENT MEETINGS. 50 X 100, NO HEATING. SEATING. NO COOKING. GENERATOR. SETUP 08-02-26. REQUIRES FIRE MARSHAL INSPECTION PRIOR TO | 425 WOODLAND ST, HARTFORD, CT 06112, HARTFORD |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| Install new sump pump (1) check valve on utility sink. ORIENT THE DISCHARGE SUCH THAT IT WILL NOT CREATE A PUBLIC NUISANCE. | 176 MANCHESTER ST, HARTFORD, CT 06112, HARTFORD |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| Removal and Disposal of Existing Basement Oil Tank and Installation of (1) 275 Gallon ROTH Double Wall Basement Oil Tank | 209 HARVARD ST, HARTFORD, CT 06106, HARTFORD |
Other | Jul 30, 2026 | 1 | Under $250,000 |
| Installing rooftop railed solar PV 4.92KW and 12 modules. | 120 CHATHAM ST, HARTFORD, CT 06112, HARTFORD |
Roofing and exterior | Jul 30, 2026 | 1 | Under $250,000 |
| Complete removal of the existing roofing (25 SQ) system and installation of a new GAF architectural asphalt shingle roof. Work includes inst | 178 BARKER ST, HARTFORD, CT 06114, HARTFORD |
Roofing and exterior | Jul 30, 2026 | 1 | Under $250,000 |
| Renovation to an cafe space to accommodate a new Starbucks fit-out. REF: COM-ALT-26-000156 | 200 BLOOMFIELD AV, #10, HARTFORD, CT 06117, HARTFORD |
Major renovation | Jul 30, 2026 | 1 | Under $250,000 |
| Re-model and upgrades to an existing cafe space, into a new updated cafe space. | 200 BLOOMFIELD AV, #KONOVER, HARTFORD, CT 06117, HARTFORD |
Other | Jul 30, 2026 | 1 | $250,000 to $1 million |
| Fire Alarm system, low frequency horn strobes in residential units, 110v ac smokes in residential units done by others | 1468 ALBANY AV, HARTFORD, CT 06112, HARTFORD |
Other | Jul 30, 2026 | 2 | Under $250,000 |
| roof replacement, 26 sq, GAF HDZ Timberline, Re-Shingle, 6 ft shield, ice and water, tape plywood seams as needed. | 157 MONROE ST, HARTFORD, CT 06114, HARTFORD |
Roofing and exterior | Jul 29, 2026 | 1 | Under $250,000 |
| Remove and replace roofing. 15 squares architectural shingle, ice & water and 3/4" plywood if needed | 281 BROWN ST, HARTFORD, CT 06114, HARTFORD |
Roofing and exterior | Jul 29, 2026 | 1 | Under $250,000 |
| WE REMOVED EXISTING SHINGLES AND ADD A NEW PRODUCT OC OR GAF ALSO WE PUT 6 FT OF ICE WATER SAME TAPE ON THE OPENING OF PLYWOOD AND UNDERLYME | 158 BENTON ST, HARTFORD, CT 06114, HARTFORD |
Mechanical | Jul 29, 2026 | 1 | Under $250,000 |
| REPAIR WORK TO ROOF AND ATTIC COMPLETE OF INSULATION ONLY ATTIC LESS THAN 3SQ | 160 WOODLAND DR, HARTFORD, CT 06105, HARTFORD |
Roofing and exterior | Jul 29, 2026 | 1 | Under $250,000 |
| REPLACE ROOF IN 3 FAM HOUSE AND GARAGE 40 SQUARES. REMOVE ALUMMINUM SIDING AND INSTALL 3/8 FOAM INSULATION AND VINYL SIDING 60 SQUARES REPAI | 30 MONROE ST, HARTFORD, CT 06114, HARTFORD |
Roofing and exterior | Jul 29, 2026 | 1 | Under $250,000 |