| Like for like - change out - 2ton gas pkg system. | 921 S 6TH ST, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| Replacing a 3.5 ton heat pump split system with 10 KW heat strips | 6322 GREENVILLE LOOP RD, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| Daikin 2 Ton Split System 14 SEER. 4.5 Kw | 329 LOCKERBY LN, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| HVAC change out of a 4 ton split system, 10 KW's, 48,000 BTU | 149 OVERLOOK DR, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| FLOODPLAIN_REPLACE HEAT PUMP AND AIR HANDLER 10KW, SAME FOR SAME | 2812 COLONEL LAMB DR, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| BURY 250 UG LP TANK AND HOOK TO EXISTING SYSTEM | 236 SPRUCE DR, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| Michael and son HVAC - Install a 3 ton split heat pump system with 10KW electrical disconnect and reconnect needed - ODU -outside AHU - atti | 1602 ANN ST, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| change out / replace 3.5 ton split w/ 8 kw | 3036 WEATHERBY CT, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| Service and panel replacement. | 112 BRIER RD, CH |
Electrical | Jul 17, 2026 | 1 | Subscribers |
| Fulford Heating and Cooling- Change Out - 3 Ton SHP w/10KW | 6015 CEDAR RIDGE DR, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| Michael and son electrical - install a 120V 20amp circuit for washer - 50ft from panel to washer - | 1109 ORANGE ST, WM |
Electrical | Jul 17, 2026 | 1 | Subscribers |
| Obrien/Meade to change out 3 ton HP w/ variable AHU s/s w/ 10 kw BTU heater. | 2545 SLOOP LANDING, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| HVAC change out of a 2 ton split system, 5 KW's, 24,000 BTU | 2000 GRAYWALSH DR, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| Upstairs: Obrien/Meade to change out 2 ton HP w/ variable AHU s/s 5 kw BTU heater. Downstairs: Change from 2.5 ton Pack unit to 3 ton Pack u | 4525 W CASCADE RD, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| 2.5 ton heat pump system | 4929 NEW CENTRE DR, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| Changeout lower system 2.5 ton split system heat pump with 10 KW heat strip | 402 CARL ST, WM |
Mechanical | Jul 17, 2026 | 1 | Subscribers |
| Installing an inground fiberglass swimming pool (15'5x40') with approx. 975 sq ft of concrete decking. *Homeowner responsible for pool code | 1108 BALDWIN PARK DR, WM |
Other | Jul 17, 2026 | 1 | Under $250,000 |
| New Construction - Accessory Dwelling Unit | 4706 WALTMOOR RD, WM |
Other | Jul 17, 2026 | 1 | Under $250,000 |
| FLOODPLAIN/new sfr ***REVISED TO ADD GAS PIPING AND APPLIANCES TO PERMIT*** | 1276 PANDION DR, WM |
Plumbing | Jul 17, 2026 | 1 | $250,000 to $1 million |
| new single family dwelling | 1406 MIDPARK PL, WM |
Other | Jul 17, 2026 | 1 | $250,000 to $1 million |
| new SF dwelling | 1408 MIDPARK PL, WM |
Other | Jul 17, 2026 | 1 | $250,000 to $1 million |
| demo, haul and dispose of office structure | 710 SUNNYVALE DR, WM |
Demolition | Jul 17, 2026 | 1 | Subscribers |
| Demo, haul and dispose of entire structure | 1756 CAROLINA BEACH RD, WM |
Demolition | Jul 17, 2026 | 1 | Subscribers |
| This is a light industrial building. It has been vacant. My company, Tideline Boats, just recently leased the building and is a new tenant. | 2020 CAPITAL DR, WM |
Other | Jul 17, 2026 | 1 | Subscribers |
| Upfit of a 10k sf dental surgery center | 1709 S 16TH ST, WM |
Major renovation | Jul 17, 2026 | 1 | $1 to $5 million |
| Interior office space renovation only. No change of use, no increase in building footprint. Interior alteration only. | 3107 KITTY HAWK RD, WM |
Major renovation | Jul 17, 2026 | 1 | $250,000 to $1 million |
| **EMERGENCY PERMIT** We will run water lines to new tankless water heater. | 2017 MACCUMBER LN, WM |
Plumbing | Jul 17, 2026 | 4 | Subscribers |
| BFPE International to Design FUrnish and Install a Fire Alarm System to code in the ILM MegaCorp Hangar... Private hangar storage building w | 2215 CONTROL TOWER DR, WM |
Major renovation | Jul 17, 2026 | 1 | $1 to $5 million |
| Pre-engineered metal building | 2215 CONTROL TOWER DR, WM |
New commercial construction | Jul 17, 2026 | 1 | Under $250,000 |
| REPLACE 3.5 TON SPLIT HEAT PUMP - NO DUCTWORK - SAME SIZE - SAME LOCATION | 4139 CAPE LANDING RD, CH |
Mechanical | Jul 17, 2026 | 2 | Subscribers |