Start free trial
County permits

New Hanover County building permits

Recent permit activity in New Hanover County, North Carolina. Projects here are at least 30 days old; subscribers see new permits the day they are issued.

12,955projects
18,720permits
Oct 28, 2026latest in the free view

Partial coverage County-wide layer that also holds the City of Wilmington's permits (DISTRICT column). Verified 2026-11-22: 1000+ permits issued in the last 30 days, newest 2026-11-19. Limits: declared value on only 34% of rows.

Top project types

Mechanical4,754 projects
Other4,581 projects
Electrical1,809 projects
Major renovation630 projects
Plumbing630 projects
Roofing and exterior217 projects

Recent permit activity

ProjectWhereTypeIssuedPermitsValue
4 SEASONS DEMO - Demo, haul and dispose of entire structure8253 E BLUE HERON DR, WM DemolitionJan 7, 20261Subscribers
General repairs to home including kitchen and bathroom renovations plus rear wooden deck replacement. Connecting to new exhaust fans, adding8328 BALD EAGLE LN, WM MechanicalJan 7, 20262$250,000 to $1 million
Installing One (1) D/F Pylon Sign with EMC & Installing Two (2) illuminated wall signs2401 S 17TH ST, WM OtherJan 7, 20262$250,000 to $1 million
Install new tank less water heater612 S 6TH ST, WM PlumbingJan 7, 20262Subscribers
HVAC CHANGE OUT, REMOVE & REPLACE EXISTING SYSTEM. 2.5 TON HP SPLIT,CHANGE BREAKER SIZE, DUCT MODS-INSTALL NEW SUPPLY & RETURN PLENUM, SCUTT7209 CLOVERFIELD CT, WM MechanicalJan 7, 20262Subscribers
100,000 SF upfit to an existing building Milam Plumbing permit install new plumbing system to code3601 CONVERSE RD, WM PlumbingJan 7, 20263$25 to $100 million
McDonald’s #31482543 CAROLINA BEACH RD, WM OtherJan 6, 20261Subscribers
Construction of a 29,925 SF self storage facility. Install new wet fire sprinkler system per NFPA #13.2700 OLD WRIGHTSBORO RD, WM OtherJan 6, 20261$1 to $5 million
Running 24 feet of gas pipe from tank to new meter set521 TANBRIDGE RD, WM MechanicalJan 6, 20261Subscribers
replace 2.5 ton split system like for like no changes to duct4510 DULLAGE DR, WM MechanicalJan 6, 20261Subscribers
ductwork replacement6039 INLAND GREENS DR, WM MechanicalJan 6, 20261Subscribers
Temporary Power Pole for Construction6200 MYRTLE GROVE RD, WM ElectricalJan 6, 20261Subscribers
Bury 250 gallon tank and pipe to house stub.6945 RUNNINGBROOK TER, WM MechanicalJan 6, 20261Subscribers
STANDARD POWER INC - Wire new sauna in backyard.117 YORKSHIRE LN, WM ElectricalJan 6, 20261Subscribers
Replace existing 5 Ton heat pump split system.7213 SAVANNA RUN LOOP, WM MechanicalJan 6, 20261Subscribers
Change out 2 ton gas package unit with duct work associated with HVAC619 GRACE ST, WM MechanicalJan 6, 20261Subscribers
Replacing ductwork1225 S MOORINGS DR, WM MechanicalJan 6, 20261Subscribers
HVAC change out of a 3 ton split system - 10 KW's - 36,000 BTU814 SAGO BAY DR, WM MechanicalJan 6, 20261Subscribers
WITHDRAWN PER COMPANY EMAIL - PROJECT NOT TAKING PLACE ANYMORE/GAS LINE FROM EXISTING STUBOUT ON LEFT SIDE OF HOME TO TANKS3224 MARATHON AV, CH MechanicalJan 6, 20261Subscribers
Unit 301,302,303,304,305,306,307,308,309,310,311,3123939 CAROLINA BEACH RD, WM ElectricalJan 6, 20263$5 to $25 million
replace ATS7408 NAUTICA YACHT CLUB DR, WM ElectricalJan 6, 20261Subscribers
Installing gas line for future stove and out door grill.2409 OLEANDER DR, WM MechanicalJan 6, 20261Subscribers
Install Direct vent gas fireplace and venting. Install gas line to fireplace to existing LP tank.6075 CHANCELLORSVILLE DR, WM MechanicalJan 6, 20261Subscribers
Fulford Heating and Cooling - Change out - Change from 3 Ton package unit to 3 Ton SHP w/5kw and relocating ductwork to attic instead of cra3957 SWEETBRIAR RD, WM MechanicalJan 6, 20261Subscribers
Replace 3.5 Ton Heat Pump Package Unit incl. 7.5KW heat strips.505 HAMLET AV, CB MechanicalJan 6, 20261Subscribers
We will run gas line off existing main to outdoor bbq.1716 AZALEA DR, WM MechanicalJan 6, 20261Subscribers
like for like 3 ton split heat pump system 10kw3628 CALABASH CT, WM MechanicalJan 6, 20261Subscribers
GROUND WORK FOR FUTURE USE EV CHARGING STATION. CONDUIT ONLY2405 PIPKIN LN, WM ElectricalJan 6, 20262Subscribers
BURY 120 UG LP TANK AND RUN OUTSIDE G/P TO EXISTING STUBBOUT8336 VINTAGE CLUB CIR, WM MechanicalJan 6, 20261Subscribers
Replacing current systems like for like for 2.5 ton split system with 8 kw heat strips600 SILVER GRASS CT, WM MechanicalJan 6, 20261Subscribers

Free to browse: permits older than 30 days. New permits, the general contractor, the owner and the exact value are for subscribers.

Arkon Leads
$99 per month per area
  • Drop a pin and choose a radius of up to 15 km (about 9 miles) around it (for example around New Hanover County)
  • See new permits the day they are issued, with the general contractor, the owner and the exact value
  • A daily alert for your area, by email or in the app
  • No exclusivity: every subscriber sees the same permits
Subscribe to an area Log in

Permit data comes from official county and city sources. Dates and values are as the source reports them.

New Hanover: Source: New Hanover County, NC (includes the City of Wilmington), building permits (public open data). Licence: none. Terms