| Master Bathroom remodel to include new cabinetry, countertops, and tile shower. Install Gas fireplace in the living room | 5712 RUXTON WAY, WM |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| Foundation repair using the installation of 6 helical piers. | 802 ANTLER DR, WM |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| Installation of 14 440W rooftop PV solar panels and 1 tesla powerwall 3 battery | 11 N 25TH ST, WM |
Roofing and exterior | Aug 31, 2026 | 1 | Subscribers |
| Install (1) 18000btu Daikin Ductless Heat Pump | 1001 S KERR AV, WM |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| OBRIEN/MEADE - Change out 2 ton s/s HP and AHU w/ 5 kw heaters. | 9111 MARKET ST, WM |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| Replace existing system upstairs with a 1.5 Ton 5kw, 15-SEER2; Trane- heat pump split system | 148 SEAWATCH WAY, KB |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| replacement of existing 2 ton split system heat pump to tie into existing ductwork,line set and condensate | 4189 SPIREA DR, WM |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| **WITHDRAWN BY APPLICANT**Michael and son HVAC - Install a 3 ton package heat pump system with 5KW electrical disconnect and reconnect neede | 104 RONALD AV, CH |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| tub to shower (same location) | 113 COLCHESTER PL, WM |
Plumbing | Aug 31, 2026 | 1 | Subscribers |
| SET 250 ABOVE GROUND PROAPANE TANK. RUN GAS LINE TO GENERATOR AND POSSIBLY TIEING INTO EXISTING LINE | 7201 POMPANO LN, WM |
Mechanical | Aug 31, 2026 | 3 | Subscribers |
| Change out 100 # CLY for a 57 gallon above ground propane tank | 6304 STRAWFIELD DR, WM |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| FLOODPLAIN / Adding Water and pressurized sewer system to property for future structures. | 2535 MIDDLE SOUND LOOP RD, WM |
Plumbing | Aug 31, 2026 | 1 | Subscribers |
| FLOODPLAIN_Remove both condenser so a new stand can be built. And changing one of the split systems at the same time. | 11 STONE ST, WB |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| KB 260042//House to be completely rewired. Has been gutted down to the studs. | 414 S FORT FISHER BLVD, KB |
Electrical | Aug 31, 2026 | 1 | Subscribers |
| FLOODPLAIN/ Top Floor: Obrien/Meade to change out 3-ton HP w/ variable AHU s/s w/ 8 kw BTU heater WITH BREAKER. Electric to add new circuit | 2507 N LUMINA AV, WB |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| **WITHDRAWN BY APPLICANT**Michael and son HVAC - Install a 2 ton mini split with 3 heads - ** 12K living room ** 6K Kitchen **6K MBR | 420 LODER AV, WM |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| GENERATOR SUPERCENTER - Installing whole home generator and setting (2) 120 gallon tanks. Completing gas piping from generator to gas source | 117 ROBERT STEPHENSON DR, WM |
Mechanical | Aug 31, 2026 | 2 | Subscribers |
| Replacement of exterior 200amp main panel w/ new breakers and grounding system ~ replacement of service meter cabinet | 501 PENINSULA DR, CB |
Electrical | Aug 31, 2026 | 1 | Subscribers |
| Remove gas furnace, case coil, and AC condenser and installing 3 ton Heat Pump with 0 kw heat strips. | 916 STRIKING ISLAND DR, WM |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| installing a 200-amp outdoor panel and meter base on this property for service receptacles for future equipment. Duke Energy is going to com | 6508 CAROLINA BEACH RD, WM |
Electrical | Aug 31, 2026 | 1 | Subscribers |
| FLOODPLAIN/change out / replace 2 ton split w/ 5 kw | 722 ARJEAN DR, WM |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| change out / replace 3 ton split system w/ 8kw | 811 SHELTON CT, WM |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| Change out / replace 2 ton Split w/ 3 kw | 201 SUNN AIRE CT, WM |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| FLOODPLAIN_Installing raised terrace and pool patio Pool to be done by others **SEE POOL PERMIT 26-007736** | 6602 W AIRLIE RD, WM |
Major renovation | Aug 31, 2026 | 1 | Under $250,000 |
| LOT 3/NEW TOWNHOUSE | 213 PELICAN FLIGHT LOOP, WM |
Other | Aug 31, 2026 | 1 | $250,000 to $1 million |
| We will be changing out the 3 existing 5 ton Heat pumps and the 1- 3.5 ton Heat pump with 3-5 ton trane Heat Pumps and 1- 3.5 ton Heat Pumps | 108 GRACE ST, WM |
Mechanical | Aug 31, 2026 | 1 | Subscribers |
| Dumpster Enclosure | 945 MEDICAL CENTER DR, WM |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| FLOODPLAIN Build new, single family 4 bedroom, 3-1/2 bath home on pilings with 2 stories above the piling level. Home will be 1 of 2 on a de | 1009 S SECOND ST, CB |
Other | Aug 31, 2026 | 1 | $250,000 to $1 million |
| 59x99 with walls 30x120 | 1305 MIDDLE SOUND LOOP RD, WM |
Other | Aug 31, 2026 | 1 | Subscribers |
| TENANT IMPROVEMENT OF AN EXISTING BUILDING TO SUPPORT NEW TENANT. WORK INCLUDES DEMOLITION AS REQUIRED, CONSTRUCTION OF NEW INTERIOR PARTITI | 5619 CAROLINA BEACH RD, WM |
Major renovation | Aug 31, 2026 | 1 | Under $250,000 |