| Remove existing wood clapboard, install of housewrap/tyvek. Trim Windows & Doors in aluminum. Install of New vinyl siding | 304 NORTH PARK, BUFFALO |
Roofing and exterior | Mar 18, 2026 | 1 | Under $250,000 |
| REPLACE HOT WATER TANK 716-218-6379 BARBARA ZEIGLER | 51 LANG, BUFFALO |
Plumbing | Mar 18, 2026 | 1 | Under $250,000 |
| To an existing 2 story 2 family dwelling remove and replace driveway from porch to sidewalk. Not in ROW | 682 HUMBOLDT, BUFFALO |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| To an existing 2 story 2 family dwelling tear off porch roof to deck and install new shingles. Install replacement windows, paint.<div><br>< | 113 LIDDELL, BUFFALO |
Roofing and exterior | Mar 18, 2026 | 1 | Under $250,000 |
| AIR HANDLER INSTALL x2 | 9 MAYFAIR, BUFFALO |
Mechanical | Mar 18, 2026 | 2 | Under $250,000 |
| 416 Dartmouth 150 Amp Single | 416 DARTMOUTH, BUFFALO |
Electrical | Mar 18, 2026 | 2 | Under $250,000 |
| Install new water and sewer and stub out of house to sidewalk. Hook up modular home plumbing system to new water service and sanitary sewer. | 447 BERKSHIRE, BUFFALO |
Plumbing | Mar 18, 2026 | 3 | Under $250,000 |
| Install new water and sewer and stub out of house to sidewalk. Hook up modular home plumbing system to new water service and sanitary sewer. | 449 BERKSHIRE, BUFFALO |
Plumbing | Mar 18, 2026 | 3 | Under $250,000 |
| Installation of a 40 gallon gas water heater | 81 SUSSEX, BUFFALO |
Plumbing | Mar 17, 2026 | 1 | Under $250,000 |
| drywall patching, replacing interior doors, changing kitchen cabinets, priming, and painting. | 274 SOBIESKI, BUFFALO |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| REMOVE AND REPLACE 11 WINDOWS, LIKE FOR LIKE, SAME SIZE, NO STRUCTURAL CHANGES<div><br></div><div>*** A separate DPW permit is required for | 2024 CLINTON, BUFFALO |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| Install 120' waterguard, sump pump | 65 ALLENHURST, BUFFALO |
Plumbing | Mar 17, 2026 | 1 | Under $250,000 |
| work onwiring to pass inspection and installcombos,gfis',pullchains | 71 DUERSTEIN, BUFFALO |
Electrical | Mar 17, 2026 | 1 | Under $250,000 |
| dig in drive repair sewer | 91 PLYMOUTH, BUFFALO |
Plumbing | Mar 17, 2026 | 1 | Under $250,000 |
| Layover of (1) layer of asphalt roofing over (1) existing layer of asphalt roofing on the left side of main roof and porch roof. Repair or r | 72 WEAVER, BUFFALO |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| turn power on acc't #7910106274 | 47 HERMAN, BUFFALO |
Electrical | Mar 17, 2026 | 1 | Under $250,000 |
| Exterior sanitary repair | 53 HAGER, BUFFALO |
Plumbing | Mar 17, 2026 | 1 | Under $250,000 |
| Furnace Replacement | 112 OGDEN NORTH, BUFFALO |
Mechanical | Mar 17, 2026 | 1 | Under $250,000 |
| removing old siding and replacing with new siding | 19 BURKE, BUFFALO |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| SEWER REPAIR | 308 NORFOLK, BUFFALO |
Plumbing | Mar 17, 2026 | 1 | Under $250,000 |
| Exterior sanitary repair | 140 CHAPIN, BUFFALO |
Plumbing | Mar 17, 2026 | 1 | Under $250,000 |
| Our work consists of repairing existing structures framing some perimeter walls , drywall ,acoustic ceilings ,painting and flooring owner di | 2496 MAIN, BUFFALO |
Other | Mar 17, 2026 | 1 | Under $250,000 |
| Excavate to repair sewer line | 298 LEXINGTON, BUFFALO |
Plumbing | Mar 17, 2026 | 1 | Under $250,000 |
| Install new .060 TPO Adhered roof system with 20 year 90 mph warranty. Add additional insulation. No tear off. | 1106 MAIN, BUFFALO |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| Install new .060 TPO Adhered roof system with 20 year 90 mph warranty. Add additional insulation. No tear off. | 1106 MAIN, BUFFALO |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| To an existing 2 story 1 family dwelling tear off roof to deck install new shingles, install new gutters and downspouts. | 328 BARNARD, BUFFALO |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| Remove indoor house trap, excavate from foundation to 7-10ft off the house & install new trap | 19 BENNETT VILL, BUFFALO |
Plumbing | Mar 17, 2026 | 1 | Under $250,000 |
| Furnace Replacement | 55 OTIS, BUFFALO |
Mechanical | Mar 17, 2026 | 1 | Under $250,000 |
| Install 3 CMU piers and new beam, as per the engineer drawing.<div><br></div><div>*** digeplan *** </div> | 39 COLUMBUS, BUFFALO |
Major renovation | Mar 17, 2026 | 1 | Under $250,000 |
| Utilizing a LIFT to reach the top of the chimney for clearing collapsed debris blockage in chimney that once vented a wood burning fireplace | 15 GREENWOOD, BUFFALO |
Plumbing | Mar 17, 2026 | 1 | Under $250,000 |