| Repair the trap and vent on the sanitary sewer | 39 GRANGER, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| remove old railings, install new wood railings on front upper porch | 402 HINMAN, BUFFALO |
Other | Dec 3, 2025 | 1 | Under $250,000 |
| 2006 Fillmore Upper acc # 2412495288 | 2006 FILLMORE, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |
| Install new water and sewer and stub out of house to sidewalk. Hook up modular home plumbing system to new water service and sanitary sewer. | 242 RHODE ISLAND, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| Meter inspection Acct# 0695110260 | 202 KEYSTONE, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |
| SERVICE UPGRADE ESR# 31242372 | 2493 NIAGARA, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |
| Installing smoke/co system, updating grounding, installing panel outlet & light, labeling main panel. | 44 HIGHGATE, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |
| Install new water and sewer and stub out of house to sidewalk. Hook up modular home plumbing system to new water service and sanitary sewer. | 226 MARYLAND, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| INSTALL A NEW 5 STOP PASSENGER ELEVATOR. FINAL ACCEPTANCE REQUIRED. | 140 SENECA, BUFFALO |
Mechanical | Dec 3, 2025 | 1 | Under $250,000 |
| Meter inspection Acct# 3332499147 | 43 ELMER, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |
| To an existing 2 story multiple replace@ 12 Windows and roof repairs to include flashing and replace missing shingles no tear off.<div><br>< | 29 UTICA EAST, BUFFALO |
Roofing and exterior | Dec 3, 2025 | 1 | Under $250,000 |
| Install new water and sewer and stub out of house to sidewalk. Hook up modular home plumbing system to new water service and sanitary sewer. | 383 FOURTEENTH, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| 150 amp service replacement ESR - 31059521 | 150 KEYSTONE, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |
| Install 123 feet waterguard | 203 COLUMBUS, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| Upper main and front lower - Tear off existing layers, install 1/2 plywood to cedar shake layer, 6ft ice shield, synthetic underlayment, dri | 52 MERRIMAC, BUFFALO |
Other | Dec 3, 2025 | 1 | Under $250,000 |
| Meter inspection, upper unit Acct# 2335097322 | 406 FERRY EAST, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |
| Install new water and sewer and stub out of house to sidewalk. Hook up modular home plumbing system to new water service and sanitary sewer. | 144 JERSEY, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| Install new water and sewer and stub out of house to sidewalk. Hook up modular home plumbing system to new water service and sanitary sewer. | 198 FOURTEENTH, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| 150 amp service replacement ESR - 31211946 | 14 HUMBER, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |
| Regrade with subbase entire area. Pave with 3” blacktop | 213 SMITH, BUFFALO |
Other | Dec 3, 2025 | 1 | Under $250,000 |
| To an existing 2 story 1 family dwelling tear off roof to deck an install new shingles, remove and rebuild chimney. | 126 PEABODY, BUFFALO |
Roofing and exterior | Dec 3, 2025 | 1 | Under $250,000 |
| repair drain for toilet and tub | 24 NORWOOD, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| 150 amp service replacement ESR - 31208073 | 250 HASTINGS, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |
| Complete 100 amp service and all grounding per NEC | 605 FARGO, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |
| Install new water and sewer and stub out of house to sidewalk. Hook up modular home plumbing system to new water service and sanitary sewer. | 138 JERSEY, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| Install new water and sewer and stub out of house to sidewalk. Hook up modular home plumbing system to new water service and sanitary sewer. | 238 RHODE ISLAND, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| Install new water and sewer and stub out of house to sidewalk. Hook up modular home plumbing system to new water service and sanitary sewer. | 766 AMHERST EAST, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| Replace 6.5' foundation top course of block wall as per the engineer drawing ***DIGEPLAN *** | 1087 TIFFT, BUFFALO |
Major renovation | Dec 3, 2025 | 1 | Under $250,000 |
| Install 124' interior drain tile, sump pump and pit | 240 POTOMAC, BUFFALO |
Plumbing | Dec 3, 2025 | 1 | Under $250,000 |
| 150 amp service replacement ESR - 31211941 Run 220 line for A/C | 95 PECKHAM, BUFFALO |
Electrical | Dec 3, 2025 | 1 | Under $250,000 |