| Additions/ Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this applicati | 750 SEVENTH AVENUE, Manhattan |
Major renovation | Sep 24, 2026 | 2 | Under $250,000 |
| PROPOSED NEW CONSTRUCTION FENCE | 85-24 ETON STREET, Queens |
Other | Sep 24, 2026 | 2 | Under $250,000 |
| Moderate interior and exterior renovation of existing 3-story building as shown on plans. Work to include roof repair and window replacement | 145 ROCKAWAY PARKWAY, Brooklyn |
Roofing and exterior | Sep 24, 2026 | 2 | $250,000 to $1 million |
| PROPOSED VERTICAL AND HORIZONTAL ADDITION. | 116-19 SUTTER AVENUE, Queens |
Major renovation | Sep 24, 2026 | 2 | $250,000 to $1 million |
| SUBSEQUENT FILING FOR SUPPORT OF EXCAVATION (SOE) WORK IN-CONJUNCTION TO NB FILING #X01202536-I1 | 220 KIMBERLY PLACE, Bronx |
Other | Sep 24, 2026 | 4 | Under $250,000 |
| Job is in a Coop apartment on the 6th Floor of a multiple dwelling. The scope includes interior renovations. No change in use egress or occu | 380 WEST 12 STREET, Manhattan |
Major renovation | Sep 24, 2026 | 2 | $250,000 to $1 million |
| RESIDENTIAL CONVERSION ON MEZ, 2ND AND 3RD FLOORS AS PER PLANS SUBMITTED HEREWITH., WORK INCLUDE REMOVE AND CONSTRUCT NON BEARING PARTITIONS | 26 EAST 13 STREET, Manhattan |
Roofing and exterior | Sep 24, 2026 | 2 | $1 to $5 million |
| PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION INCONJUNCTION WITH EXISTNG DUPLEX APT#2/3B RENOVATION. UPGRADE KITCHEN & BATHROOM | 184 COLUMBIA HEIGHTS, Brooklyn |
Demolition | Sep 24, 2026 | 2 | Under $250,000 |
| Bremond King Davis Cluster: Existing 5-Story Old Law Tenement Building; proposed window/roof replacement; and ordinary repair of existing ex | 171 WEST 133 STREET, Manhattan |
Roofing and exterior | Sep 24, 2026 | 3 | $250,000 to $1 million |
| MODIFICATION TO SPRINKLERS SYSTEM AT VORHEES HALL AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | 186 JAY STREET, Brooklyn |
Major renovation | Sep 24, 2026 | 3 | $250,000 to $1 million |
| interior renovation sprinkler work type, modification of existing wet sprinkler system, relocation of 29 heads and associated SP. piping, (t | 1611 SURF AVENUE, Brooklyn |
Major renovation | Sep 24, 2026 | 2 | Under $250,000 |
| APPLICATION FILED TO REMOVE PARTITIONS, THREE PIECE BATH AND HOT TUB FROM CELLAR TO RESOLVE ECB VIOLATIONS 35236130R AND 35236131Z. ALL AS P | 595 NEW LOTS AVENUE, Brooklyn |
Other | Sep 24, 2026 | 2 | Under $250,000 |
| (9TH FL- GENERAL CATALYST) FILING HEREWITH DRAWINGS INDICATING NON-STRUCTURAL - REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS | 148 LAFAYETTE STREET, Manhattan |
Major renovation | Sep 24, 2026 | 4 | $250,000 to $1 million |
| COMBINING EXISTING APTS. 3R AND 3S AS PER TPPN #3/97. PARTITION WORK, NEW DOORS, FINISHES, LIGHTING, CABINETRY. PL WORK UNDER SUBSEQUENT APP | 11 FIFTH AVENUE, Manhattan |
Roofing and exterior | Sep 24, 2026 | 3 | $250,000 to $1 million |
| Renovation of an existing apartment#9F of the ninth floor. Work includes non-structural demolition, general construction and modification of | 1060 PARK AVENUE, Manhattan |
Demolition | Sep 24, 2026 | 5 | Under $250,000 |
| Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy. | 2520 BATCHELDER STREET, Brooklyn |
Roofing and exterior | Sep 24, 2026 | 2 | $250,000 to $1 million |
| Erect projecting sign structure for D/F advertising signs on wall. (Signs filed undef M01351847 and M01351850). No change of use, egress or | 145 WEST 44 STREET, Manhattan |
Major renovation | Sep 24, 2026 | 3 | $1 to $5 million |
| FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Si | 1175 EAST 229 STREET, Bronx |
Roofing and exterior | Sep 24, 2026 | 2 | $250,000 to $1 million |
| Modifications to an existing sprinkler/standpipe system. | 122 5 AVENUE, Manhattan |
Other | Sep 24, 2026 | 6 | $1 to $5 million |
| General construction alterations on the 5th floor for proposed commercial tenant fit-out; related work as per plans. No proposed change in b | 415 WEST BROADWAY, Manhattan |
Major renovation | Sep 24, 2026 | 5 | $250,000 to $1 million |
| Support of excavation for proposed lowered cellar & rear addition. | 161 WEST 13 STREET, Manhattan |
Major renovation | Sep 24, 2026 | 2 | Under $250,000 |
| PROPOSED INTERIOR RENOVATION OF EXISTING APT UNIT#3. PARTITIONWORKS AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. | 24 GREENWICH AVENUE, Manhattan |
Major renovation | Sep 24, 2026 | 3 | Under $250,000 |
| This application is filed to supersede an expired BIS Alt-2 job (102788583) in 02/12/2001. All work completed and no new work to be done und | 500 WEST END AVENUE, Manhattan |
Major renovation | Sep 24, 2026 | 6 | $250,000 to $1 million |
| CONVERSION OF PART OF EXISTING COMMERCIAL INTO RESIDENTIAL - 1 NEW DWELLING UNIT; RENOVATION OF THIRD FLOOR. | 66-83 FOREST AVENUE, Queens |
New commercial construction | Sep 24, 2026 | 2 | $250,000 to $1 million |
| INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP | 851 8 AVENUE, Manhattan |
Other | Sep 24, 2026 | 2 | $250,000 to $1 million |
| Phase 2 demolition of interior finishes/partitions within an unoccupied college dormitory. Related work filed under ST# M01310628 and ALT CO | 1120 AMSTERDAM AVENUE, Manhattan |
Demolition | Sep 24, 2026 | 5 | $5 to $25 million |
| Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy. | 1138 229 DRIVE SOUTH, Bronx |
Other | Sep 24, 2026 | 4 | $1 to $5 million |
| APPLICATION FILED FOR 204 SF TOTAL 2-STORY REAR ENLARGEMENT & INTERIOR RENOVATION OF EXISTING 2 FAMILY RESIDENCE. WORK TO INCLUDE LOWERING O | 2715 HUMPHREYS STREET, Queens |
Major renovation | Sep 24, 2026 | 2 | $250,000 to $1 million |
| NEW SPRINKLER SYSTEM WITH COMPLETE COVERAGE TO ALL FLOORS OF THE BUILDING IN COMPLIANCE WITH THE 2022 NYC BUILDING CODES AND NFPA 13D. | 136 KANE STREET, Brooklyn |
New commercial construction | Sep 24, 2026 | 2 | Under $250,000 |
| HP6 Exam Rooms: Modification to interior finishes and ceilings to accommodate the renovation on partial 6th floor, Harkness Pavilion in the | 180 FORT WASHINGTON AVENUE, Manhattan |
Major renovation | Sep 24, 2026 | 3 | Under $250,000 |