| filing application to address wwp violations. replace existing partitions and relocate bathroom and kitchen on 1st floor. replace partition | 967 EAST 225 STREET, Bronx |
Other | Sep 21, 2026 | 1 | Under $250,000 |
| INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICAT | 242 WEST 72 STREET, Manhattan |
Other | Sep 21, 2026 | 1 | Under $250,000 |
| Foundation work for 9 story building. | 2110 CROTONA AVENUE, Bronx |
Other | Sep 21, 2026 | 1 | Subscribers |
| ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | 59 MILFORD STREET, Brooklyn |
Roofing and exterior | Sep 21, 2026 | 1 | Under $250,000 |
| TO CONVERT AN EXISTING TWO FAMILY DWELLING INTO A FIVE FAMILY DWELLING. TO ADDRESS VIOLATION 34101111R AND BRING CELLAR INTO COMPLIANCE BY R | 30-82 48 STREET, Queens |
Other | Sep 21, 2026 | 1 | $250,000 to $1 million |
| Installation of solar system on the roof as per plan. No change in use, egress or occupancy | 111-25 126 STREET, Queens |
Roofing and exterior | Sep 21, 2026 | 1 | Under $250,000 |
| INSTALLATION OF SPLIT SYSTEM HEAT PUMP; (3) INDOOR UNIT AND (10) OUTDOOR UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | 43 WEST 54 STREET, Manhattan |
Mechanical | Sep 21, 2026 | 1 | Under $250,000 |
| full demolition of four story structure using hand held with mechanical to assist. | 152 EAST 79 STREET, Manhattan |
Demolition | Sep 21, 2026 | 1 | $1 to $5 million |
| INTERIOR DEMOLITION ON EXISTING THREE(3) STORY WITH CELLAR,THREE(3) FAMILY RESIDENTIAL BUILDING.NO CHANGE OF BUILDING BULK,OCCUPANCY OR EGRE | 446 HARMAN STREET, Brooklyn |
Demolition | Sep 21, 2026 | 1 | Under $250,000 |
| 1. REPLACE THE CRACK BRICK AT EXPOSURE#1,EXPOSURE#2, AND EXPOSURE#4 AT PARAPET LEVEL APPROXIMATELY=50 PCS2. RE-POINTING BRICK JOINT AT EXPOS | 2455 MCDONALD AVENUE, Brooklyn |
Other | Sep 21, 2026 | 1 | Under $250,000 |
| Installation of solar panels, rooftop, grid tied, railed, 15 modules, 6.15 KW | 257-24 147 AVENUE, Queens |
Roofing and exterior | Sep 21, 2026 | 1 | Under $250,000 |
| CONCRETE WORK @ 1ST FLOOR AS PER PLAN TO ADDRESS ECB#39195719R. NO CHANGE IN USE, EGRESS AND OCCUPANCY. | 1101 METROPOLITAN AVENUE, Brooklyn |
Other | Sep 21, 2026 | 1 | Under $250,000 |
| APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 44TH FLOOR AS PER PLANS FILED HEREWITH. | 40 WALL STREET, Manhattan |
Major renovation | Sep 21, 2026 | 1 | Under $250,000 |
| HEREBY FILING FOR PARAPET REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 2116 DORCHESTER ROAD, Brooklyn |
Other | Sep 21, 2026 | 1 | Under $250,000 |
| GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 89-35 155 AVENUE, Queens |
Other | Sep 21, 2026 | 1 | Under $250,000 |
| SLB Bldg-ARCHITECTURAL WORK FOR PROPOSED ROOF REPLACEMENT FOR SLB BUILDING -- 3RD FLOOR AND 5TH FLOOR ROOF SETBACKS-- LOCATED AT RICHMOND UN | 355 BARD AVENUE, Staten Island |
Roofing and exterior | Sep 21, 2026 | 1 | $1 to $5 million |
| MINOR RENOVATION OF 1ST FLOOR COMMERCIAL SPACE. PROPOSED ICE CREAM SHOP. | 42-01 235 STREET, Queens |
Major renovation | Sep 21, 2026 | 1 | Under $250,000 |
| INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH. | 183-16 64 AVENUE, Queens |
Other | Sep 21, 2026 | 1 | Under $250,000 |
| Facade repairs on the front elevation as shown on the drawings filed herewith. No change in use, egress, or occupancy. | 243 EAST 94 STREET, Manhattan |
Roofing and exterior | Sep 21, 2026 | 1 | Under $250,000 |
| Exterior renovation of rear deck as per plans filed herewith, to resolve violations. | 1233 EAST 32 STREET, Brooklyn |
Roofing and exterior | Sep 21, 2026 | 1 | Under $250,000 |
| REMOVE AND REPLACE EXISTING ROOFING SHINGLES AND SHEATHING. TO BE REPLACED W/ NEW FIBERGLASS ASPHALT SHINGLES. NO CHANGE TO STRUCTURAL FRAME | 941 OCEAN AVENUE, Brooklyn |
Roofing and exterior | Sep 21, 2026 | 1 | Under $250,000 |
| interior renovation to existing automotive service station | 3723 AVENUE U, Brooklyn |
Major renovation | Sep 21, 2026 | 1 | Under $250,000 |
| Demolition and construction of non-load bearing partitions as per plans. No change in use, occupancy, or egress. | 152 EAST 94 STREET, Manhattan |
Demolition | Sep 21, 2026 | 1 | Under $250,000 |
| HEREWITH FILING FOR STRUCTURAL WORK IN CONJUCTION TO NB AS PER PLANS | 179-25 BRINKERHOFF AVENUE, Queens |
Other | Sep 21, 2026 | 1 | Subscribers |
| Horizontal extension: single family dwelling. New addition at first floor and second floor for family room, kitchen, 2 bedrooms and 2 bathro | 45-58 196 PLACE, Queens |
Major renovation | Sep 21, 2026 | 1 | $250,000 to $1 million |
| INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP | 119 ESSEX STREET, Manhattan |
Other | Sep 21, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE I | 119 ESSEX STREET, Manhattan |
Other | Sep 21, 2026 | 1 | Under $250,000 |
| ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | 163-31 85 STREET, Queens |
Roofing and exterior | Sep 21, 2026 | 1 | Under $250,000 |
| General construction work as per plans filed herewith. No change to use egress or occupancy. | 59-17 JUNCTION BOULEVARD, Queens |
Other | Sep 21, 2026 | 1 | Under $250,000 |
| General construction work as per plans filed herewith. No change to use egress or occupancy. | 59-17 JUNCTION BOULEVARD, Queens |
Other | Sep 21, 2026 | 1 | Under $250,000 |