| THE SCOPE INCLUDES RENOVATION OF THE BASE BUILDING CHILLER PLANT TO INCLUDE THE REMOVAL OF EXISTING ABSORPTION CHILLERS AND SYSTEM COMPONENT | 120 WEST 106 STREET, Manhattan |
Electrical | Sep 8, 2026 | 2 | Under $250,000 |
| Interior renovation to combine two adjacent condo units on the 6th, 7th floor and roof in compliance with TPPN#3/97. General Construction. N | 13 EAST 30 STREET, Manhattan |
Roofing and exterior | Sep 8, 2026 | 2 | Under $250,000 |
| Renovate exist. office and Bathroom spaces on the 7th floor - removal nonbearing partitions and doors as required. install new nonbearing pa | 599 BROADWAY, Manhattan |
Roofing and exterior | Sep 8, 2026 | 3 | $250,000 to $1 million |
| Propose interior renovation with existing 2 story residential building with partition work and floor finishes as per plan. No change in use, | 118 4 AVENUE, Brooklyn |
Major renovation | Sep 8, 2026 | 2 | Under $250,000 |
| PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | 317 BROADWAY, Manhattan |
Other | Sep 8, 2026 | 2 | Under $250,000 |
| INTERIOR RENOVATIONS OF APT 7H AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 880 5 AVENUE, Manhattan |
Major renovation | Sep 8, 2026 | 2 | Under $250,000 |
| HERE WITH FILING APPLICATION TO REMOVE ILLEGAL PL FIXTURES AND PARTITIONS IN CELLAR AS PER PLANS.NO CHANGE IN USE OCCUPANCY OR EGRESS TO EXI | 67 TAPSCOTT STREET, Brooklyn |
Other | Sep 8, 2026 | 2 | Under $250,000 |
| THE PROJECT INVOLVES ADDING A REAR YARD EXTENSION AND PARTIAL THIRD STORY TO A TWO-STORY TOWNHOUSE WITH A CELLAR AND BASEMENT. THIS WILL REQ | 302 PROSPECT PLACE, Brooklyn |
Major renovation | Sep 8, 2026 | 2 | $250,000 to $1 million |
| RELOCATE EXISTING 10'-0 CURB CUT | 115-45 GAR 124 STREET, Queens |
Other | Sep 8, 2026 | 2 | Subscribers |
| PROPOSED THREE STORY ONE-FAMILY SEMI-DETACHED DWELLING WITH ACCESSORY BUILT-IN ONE CAR GARAGE. | 74 GRAVES STREET, Staten Island |
Other | Sep 8, 2026 | 3 | Under $250,000 |
| PROPOSED THREE STORY ONE-FAMILY SEMI-DETACHED DWELLING WITH ACCESSORY BUILT-IN ONE CAR GARAGE. | 72 GRAVES STREET, Staten Island |
Other | Sep 8, 2026 | 3 | Under $250,000 |
| FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN | 76 GRAVES STREET, Staten Island |
Plumbing | Sep 8, 2026 | 3 | Under $250,000 |
| FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN | 80 GRAVES STREET, Staten Island |
Plumbing | Sep 8, 2026 | 3 | Under $250,000 |
| RENOVATION OF EXISTING CELLAR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REDUCE AND REPLACE OPEN PORCH AT | 1739 BAY RIDGE AVENUE, Brooklyn |
Roofing and exterior | Sep 8, 2026 | 2 | Under $250,000 |
| PROPOSED INTERIOR RENOVATION OF CELLAR, 1ST & 2ND FLOOR OF EXISTING 2 STORY BUILDING. MECHANICAL WORK AND CONSTRUCTION WORK AS PER PLAN. NEW | 1948 81 STREET, Brooklyn |
Mechanical | Sep 8, 2026 | 2 | Under $250,000 |
| INSTALLING CONSTRUCTION FENCE AS PER PLAN, CONJUNCTION WITH JOB #B01431999-I1 NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 746 59 STREET, Brooklyn |
Other | Sep 8, 2026 | 3 | Under $250,000 |
| INTERIOR RENOVATION ON EXISTING 17TH FLOOR SPACE. NO CHANGE TO USE,, OCCUPANCY OR EGRESS. | 20 WEST 22 STREET, Manhattan |
Major renovation | Sep 8, 2026 | 4 | $250,000 to $1 million |
| PL/SP for INSTALLATION OF NEW SUPPLY WATER AND SANITARY DRAIN PIPING AT 4TH FLOOR, TO BE CONNECTED AT THE 3RD FLOOR CEILING. INSTALLATION OF | 424 MADISON AVENUE, Manhattan |
Other | Sep 8, 2026 | 2 | Under $250,000 |
| INTERIOR RENOVATION OF EXISTING COMMERICAL SPACE AT THE 2ND FLOOR, WITH NEW PARTITIONS, MILLWORK, FIXTURES AND OTHER INTERIOR FINISHES. NO C | 123 5 AVENUE, Manhattan |
Major renovation | Sep 8, 2026 | 3 | Under $250,000 |
| RENOVATION OF APARTMENT 4 IN EXISTING BUILDING AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS | 359 WEST 22 STREET, Manhattan |
Major renovation | Sep 8, 2026 | 2 | Under $250,000 |
| GENERAL CONSTRUCTION WORK FOR INTERIOR PARTITION WORK TO COMBINE APARTMENTS AT THE 3RD FLOOR AS PER TPPN #3/97. NO CHANGE TO EGRESS, USE OR | 240 EAST 19 STREET, Manhattan |
Major renovation | Sep 8, 2026 | 2 | Under $250,000 |
| INTERIOR RENOVATION TO EXISTING APARTMENT UNIT 34 | 516 WEST 156 STREET, Manhattan |
Major renovation | Sep 8, 2026 | 2 | Under $250,000 |
| INTERIOR RENOVATION OF EXISTING MANUFACTURING SPACE & COMMERCIAL SPACES AS PER CO #CO004264 WITH ACCESSORY OFFICES & STORAGE INCLUDING INSTA | 724 SOUTHERN BOULEVARD, Bronx |
Major renovation | Sep 8, 2026 | 2 | $250,000 to $1 million |
| INSTALLATION OF 8'-0 HIGH PLYWOOD TEMPORARY CONSTRUCTION FENCE-NO CHANGE IN USE/OCCUPANCY, EGRESS, ROOM COUNT/DWELLING UNITS | 91-38 111 STREET, Queens |
Other | Sep 8, 2026 | 2 | Under $250,000 |
| Repair and Reinforcement of existing egress stair framing from floors 8 to 20. No change to use, egress, or occupancy. | 1790 BROADWAY, Manhattan |
Other | Sep 8, 2026 | 2 | Under $250,000 |
| MINOR FIRE DAMAGE INTERIOR RENOVATION EXISTING TWO-FAMILY DWELLING UNIT AND BASEMENT INCLUDING NON-LOAD BEARING PARTITION WALL REMOVAL, DRYW | 1636 GLOVER STREET, Bronx |
Major renovation | Sep 8, 2026 | 2 | Under $250,000 |
| NEW BUILDING APPLICATION FOR TWO-FAMILY, THREE-STORY DETACHED RESIDENCE W/ A ONE-CAR BUILT-IN GARAGE AND TWO 8'-6x18'-0 PARKING PADS | 57 ELDER AVENUE, Staten Island |
Other | Sep 8, 2026 | 2 | Subscribers |
| INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP | 1862 EAST 2 STREET, Brooklyn |
Other | Sep 8, 2026 | 2 | Under $250,000 |
| installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc | 410 RIVERSIDE DRIVE, Manhattan |
Other | Sep 8, 2026 | 3 | Under $250,000 |
| installation of heavy duty sidewalk shed and pipe scaffolding. | 176 BROADWAY, Manhattan |
Other | Sep 8, 2026 | 5 | $250,000 to $1 million |