| REPLACE GAS PIPING AND PERFORM GAS PRESSURE TEST TO REACTIVATE GAS SERVICE FOR EXISTING DUAL-FUEL BOILER WITH TANKLESS COIL LOCATED IN THE B | 1818 79 STREET, Brooklyn |
Plumbing | Sep 2, 2026 | 1 | Under $250,000 |
| SUBSEQUENT FILING FOUNDATION PLANS IN CONJUNCTION WITH ALT-2 JOB #B01306775-I1. | 571 EAST 31 STREET, Brooklyn |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| INTERIOR AND EXTERIOR RENOVATIONS OF EXISTING TRUCK TERMINAL AND ADJACENT PARKING INSIDE PROPERTY LINE INCLUDING STRUCTURAL FRAMING AND CONC | 4215 BOSTON ROAD, Bronx |
Roofing and exterior | Sep 2, 2026 | 1 | $1 to $5 million |
| APPLICATION FILE TO EXTERIOR FACADE REPAIR AS BROWN STONE STEP REPAIR AND FACADE REPAIR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY U | 130 EAST 95 STREET, Manhattan |
Roofing and exterior | Sep 2, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN AND 1 ILLUMINATED DOUBLE FACED NON-FLASHING ACCESSORY BUSINESS S | 761 7 AVENUE, Manhattan |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| RESTORE EX. 2-FAMILY DWELLING & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCITON, MINOR STRUCTURAL REPAIR, PARTITIONS & COSMETIC FINISHES. | 208-05 48 AVENUE, Queens |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| HEREWITH FILE NEW BUILDING IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE. FILED SUBSEQUENTLY TO JOB NUMBER Q01264617-I1 | 138-61 102 AVENUE, Queens |
New commercial construction | Sep 2, 2026 | 1 | $250,000 to $1 million |
| Provide electric unit heater for temp heating as part of interior renovation of tenant space. No change in egress, use, zoning, or occupancy | 59-01 MAURICE AVENUE, Queens |
Mechanical | Sep 2, 2026 | 1 | Under $250,000 |
| Installation of new gas equipment for an existing restaurant use gruop#6 on the 1st floor of an existing Res/Com building &a gas hot water h | 622 EAST 187 STREET, Bronx |
Plumbing | Sep 2, 2026 | 1 | Under $250,000 |
| INR BIPLANE: STRUCTURAL SUPPORT FOR MEDICAL LAB EQUIPMENT TO ACCOMMODATE THE INR BIPLANE REPLACEMENT PROJECT AS PER PLANS. NO CHANGE TO USE, | 525 EAST 68 STREET, Manhattan |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| SUPPORT OF EXCAVATION | 25 KOSSUTH PLACE, Brooklyn |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| PROPOSE TO REMOVE DEFECTIVE MASONRY WALL TO INCLUDE PARAPET WALL AND REPLACE WITH NEW WALL | 648 REMSEN AVENUE, Brooklyn |
Other | Sep 2, 2026 | 2 | Under $250,000 |
| REPAIR THE PARAPET WALL BRICK VENEER AND BRICK IN STEP AREA. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 1 PAERDEGAT 9 STREET, Brooklyn |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY | 220 EAST 204 STREET, Bronx |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 14-17 31 AVENUE, Queens |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| REFURBISHING KITCHENS AND BATHS , REPLACING KITCHEN AND VANITY CABINETS NEW K SINK AND LAV, PROTECT TUB AND RANGE AND HOOD IN PLACE. | 501 EAST 87 STREET, Manhattan |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMP | 1190 SHAKESPEARE AVENUE, Bronx |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY | 418 BRIGHTON BEACH AVENUE, Brooklyn |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY | 250 EAST 65 STREET, Manhattan |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP | 215 MOUNT HOPE PLACE, Bronx |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # | 413 8 AVENUE, Manhattan |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS O | 46 DIAMOND STREET, Brooklyn |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY | 218-30 MERRICK BOULEVARD, Queens |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| HEAVY DUTY SIDEWALK SHED DURING BUILDING CONVERSION AND ENLARGMENT FILED UNDER APPLICATION M01041376. SIDEWALK SHED SHALL COMPLY WITH CH #33 | 132 EAST 64 STREET, Manhattan |
Major renovation | Sep 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 250 MULBERRY STREET, Manhattan |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMP | 2866 MARION AVENUE, Bronx |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # | 167 EAST 80 STREET, Manhattan |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # | 155 JOHNSON AVENUE, Brooklyn |
Other | Sep 2, 2026 | 1 | Under $250,000 |
| plumbing work as per plans. | 30 CENTRAL PARK SOUTH, Manhattan |
Plumbing | Sep 2, 2026 | 1 | Under $250,000 |
| PARAPET WALL REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION | 3616 BRONX BOULEVARD, Bronx |
Other | Sep 2, 2026 | 1 | Under $250,000 |