| PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICA | 118-08 JAMAICA AVENUE, Queens |
Other | Aug 26, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE I | 2342 ATLANTIC AVENUE, Brooklyn |
Other | Aug 26, 2026 | 1 | Under $250,000 |
| Herewith filing support of excavation work in conjunction with GC application number M01217953. NO Change in use and occupancy. | 137 WEST 14 STREET, Manhattan |
Other | Aug 26, 2026 | 1 | Under $250,000 |
| SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE REPAIR WORK AND INSPECTION AT 1420 BRONX RIVER AVENUE, BRONX, NY 10472. | 1420 BRONX RIVER AVENUE, Bronx |
Roofing and exterior | Aug 26, 2026 | 1 | Subscribers |
| Propose renovation at cellar & 1st floor commercial space of existing eating and drinking establishment as per plan. No change in use, egres | 5721 8 AVENUE, Brooklyn |
Major renovation | Aug 26, 2026 | 2 | $250,000 to $1 million |
| PROPOSED CONSTRUCTION OF A NEW TWO-STORY, ONE-FAMILY FRAME BUILDING WITH CELLAR AND ATTIC, WITH EXISTING ELEMENTS TO REMAIN. | 75-15 195 STREET, Queens |
New commercial construction | Aug 26, 2026 | 5 | $5 to $25 million |
| Installation of suspended scaffold for facade repair & inspection. | 240 CROWN STREET, Brooklyn |
Roofing and exterior | Aug 26, 2026 | 1 | Subscribers |
| Combining of medical suites 1 and 2 into 1 medical suite with exam rooms and waiting room renovations as per plans filed herewith. | 82-12 151 AVENUE, Queens |
Major renovation | Aug 26, 2026 | 2 | $250,000 to $1 million |
| EIFS Repair, Brick Replacement, Concrete Repairs, Re-pointing of Masonry Mortar Joints per plans. No change in use, egress, or occupancy. | 100 LUQUER STREET, Brooklyn |
Other | Aug 26, 2026 | 1 | Under $250,000 |
| Install foundation as per plans filed. Filed subsequent to NB #B01283545. | 178 MONTROSE AVENUE, Brooklyn |
Other | Aug 26, 2026 | 1 | Subscribers |
| TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01341355-I1 | 1027 DEAN STREET, Brooklyn |
Other | Aug 26, 2026 | 1 | Subscribers |
| SPRINKLER & STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01341355-I1 | 1027 DEAN STREET, Brooklyn |
Other | Aug 26, 2026 | 2 | Subscribers |
| INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE | 1027 DEAN STREET, Brooklyn |
Other | Aug 26, 2026 | 1 | Subscribers |
| FILING STRUCTURAL WORK-TYPE FOR REAR DECK & 3RD FL ROOF STRUCTURE TO REMEDY VACATE ORDER S25/2025 ASSOCIATED WITH DOB VIOLATION #040825C25-0 | 14 TOWNSEND AVENUE, Staten Island |
Roofing and exterior | Aug 26, 2026 | 1 | Under $250,000 |
| IT IS PROPOSED TO REPLACE ROOF AND LIMITED FACADE REPAIRS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 706 SACKETT STREET, Brooklyn |
Roofing and exterior | Aug 26, 2026 | 1 | Under $250,000 |
| Horizontal addition and renovation of existing one family dwelling. | 8309 12 AVENUE, Brooklyn |
Major renovation | Aug 26, 2026 | 1 | Under $250,000 |
| NEW FULLY WET SPRINKLER SYSTEM. EACH FLOOR IS TO BE PROVIDED WITH A SINGLE INTERLOCK PREACTION VALVE CONNECTEDTO THE BUILDING VESDA SYSTEM. | 9 WEST 54 STREET, Manhattan |
New commercial construction | Aug 26, 2026 | 1 | $250,000 to $1 million |
| Temporary installations to be used on a temporary event LAIKA Wildwood Portal Tour. All installations are to be removed upon completion of t | 1 MANHATTAN PLAZA, Manhattan |
Other | Aug 26, 2026 | 1 | Under $250,000 |
| Temporary sculpture Uniite in TSQ-Father Duffy Square. Removed at the end of the programing. No changes to existing structures, use or egres | 1 MANHATTAN PLAZA, Manhattan |
Other | Aug 26, 2026 | 1 | Under $250,000 |
| HEREWITH FILE ALTERATION TYPE 1 TO COMPLY WITH NEW BUILDING REQUIREMENTS, CONVERSION OF EXISTING 2 STORY 2 FAMILY DWELLING TO FOUR (4) STORY | 189 GRAFTON STREET, Brooklyn |
Other | Aug 26, 2026 | 1 | $1 to $5 million |
| General construction as shown on plans filed herewith. No change in use, egress, and occupancy. | 200 LIBERTY STREET, Manhattan |
Other | Aug 26, 2026 | 1 | $5 to $25 million |
| STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01252547-I1 | 2258 MORRIS AVENUE, Bronx |
Other | Aug 26, 2026 | 1 | Subscribers |
| INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | 140 WEST STREET, Manhattan |
Major renovation | Aug 26, 2026 | 1 | Under $250,000 |
| Interior renovation of existing 4-family residential building. No change of use, egress or occupancy. | 170 SOUTH 2 STREET, Brooklyn |
Major renovation | Aug 26, 2026 | 2 | $250,000 to $1 million |
| American Gem (Suite 601) - Construction work on the 6th floor as indicated on drawings. | 608 FIFTH AVENUE, Manhattan |
Other | Aug 26, 2026 | 1 | Under $250,000 |
| FILING FOR FOUNDATION WORKTYPE IN CONJUNCTION WITH B01229848-I1 | 180 12 STREET, Brooklyn |
Other | Aug 26, 2026 | 1 | Subscribers |
| Standpipe connections to existing risers and installation of (8) new FHCs per plans submitted herewith. New Sprinkler heads and piping insta | 375 MADISON AVENUE, Manhattan |
Other | Aug 26, 2026 | 2 | $1 to $5 million |
| INTERIOR FIT-OUT OF DENTAL OFFICE IN EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY | 45-57 BELL BOULEVARD, Queens |
Major renovation | Aug 26, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | 747 10 AVENUE, Manhattan |
Other | Aug 26, 2026 | 1 | Under $250,000 |
| HEAVY DUTY SIDEWALK SHED DURING BLDG ENLARGEMENT FILED UNDER APPLICATION # X01255054. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. | 1074 KELLY STREET, Bronx |
Other | Aug 26, 2026 | 1 | Under $250,000 |