| new gas back up generator | 90 MERRICK AVENUE, Staten Island |
Plumbing | Aug 25, 2026 | 1 | Under $250,000 |
| installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc | 111 CENTRAL PARK NORTH, Manhattan |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc | 188 EAST 78 STREET, Manhattan |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc | 512 WEST 122 STREET, Manhattan |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc | 512 WEST 122 STREET, Manhattan |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc | 514 WEST 122 STREET, Manhattan |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHATPER 33 OF NYCBC | 514 WEST 122 STREET, Manhattan |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| Facade repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy. | 103 EAST 210 STREET, Bronx |
Roofing and exterior | Aug 25, 2026 | 1 | Under $250,000 |
| REMOVE EXISTING ROOFING AND WOOD SHEATHING AND REPLACE WITH SHINGLES AND 1/2 WOOD SHEATING. NO CHANGE TO ROOF RAFTERS. | 266 RIDGEWOOD AVENUE, Staten Island |
Roofing and exterior | Aug 25, 2026 | 1 | Under $250,000 |
| Installation of suspended scaffold for facade repair & inspection. | 285 RIVERSIDE DRIVE, Manhattan |
Roofing and exterior | Aug 25, 2026 | 1 | Subscribers |
| PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE | 125 RALPH AVENUE, Brooklyn |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # | 125 RALPH AVENUE, Brooklyn |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| RESTORE THE FRONT YARD PLANTING AREA TO ITS LEGALLY REQUIRED CONDITION TO REMOVE THE VIOLATION # 39195811J, NO CHANGE IN USE, EGRESS, OR OCC | 142-02 HORACE HARDING EXPRESSWAY, Queens |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| ALTERATION TYPE 2 HEREWITH FILING FOR A RENOVATION OF THE FRONT FACADE; REPATCH MASONRY. NO CHANGE IN USE, OCCUPANCY OR EGRESS | 137 TAAFFE PLACE, Brooklyn |
Roofing and exterior | Aug 25, 2026 | 1 | Under $250,000 |
| PARAPET WALL REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION | 124-04 LIBERTY AVENUE, Queens |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| THIS JOB IS FILED FOR FULL DEMOLITION WORK AT 9-20 MAIN AVENUE, QUEENS, NY 11102 | 9-20 MAIN AVENUE, Queens |
Demolition | Aug 25, 2026 | 1 | Under $250,000 |
| THIS JOB IS FILED FOR FULL DEMOLITION WORK AT 9-18 MAIN AVENUE, QUEENS, NY 11102 | 9-18 MAIN AVENUE, Queens |
Demolition | Aug 25, 2026 | 1 | Under $250,000 |
| Interior renovation of existing Showroom & Offices space, with non-load bearing partitions to be installed on the 7th floor as indicated on | 689 5 AVENUE, Manhattan |
Major renovation | Aug 25, 2026 | 1 | $250,000 to $1 million |
| THIS JOB IS FILED FOR FULL DEMOLITION WORK AT 9-16 MAIN AVENUE, QUEENS, NY 11102 | 9-16 MAIN AVENUE, Queens |
Demolition | Aug 25, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # | 1005 WALTON AVENUE, Bronx |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| Interior demo on 11th floor as per plans filed herewith. | 18 WEST 21 STREET, Manhattan |
Demolition | Aug 25, 2026 | 1 | Under $250,000 |
| LEGALIZE FULL DEMO OF GARAGE | 131-05 GAR 135 STREET, Queens |
Demolition | Aug 25, 2026 | 1 | Subscribers |
| INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER DRAWINGS, ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPAN | 1825 RIVERSIDE DRIVE, Manhattan |
Mechanical | Aug 25, 2026 | 1 | Under $250,000 |
| REMOVE, REPLACE AND INSTALL NEW BOILER & COMPONENTS. NO CHANGE TO USE, OCCUPANCY OR EGRESS | 206 EAST 95 STREET, Manhattan |
Mechanical | Aug 25, 2026 | 2 | Under $250,000 |
| Masonry facade repairs as per plans. No change to use, occupancy or egress. | 36 BLEECKER STREET, Manhattan |
Roofing and exterior | Aug 25, 2026 | 1 | Under $250,000 |
| HORIZONTAL HOUSE EXTENSION ON FIRST FLOOR AT EXISTING ONE FAMILY HOUSE. NO CHANGE IN USE, OCCUPANCY AND EGRESS UNDER THIS APPLICATION. | 43-18 214 PLACE, Queens |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| HEREWITH FILING FOR AN INTERIOR RENOVATION FOR FLOORS CEL-002. FILING TO REMOVE AND REPLACE INTERIOR NON STRUCTURAL PARTITIONS. FILING TO RE | 1513 39 STREET, Brooklyn |
Major renovation | Aug 25, 2026 | 1 | Under $250,000 |
| HEREWITH FILING A PLUMBING APPLICATION FOR THE REMOVAL AND DIRECT REPLACEMENT OF PLUMBING FIXTURES AT FLOORS CEL-002. THERE SHALL BE NO GAS | 1513 39 STREET, Brooklyn |
Plumbing | Aug 25, 2026 | 1 | Subscribers |
| Installation of new chimney liner in the existing chimney. | 2540 BATCHELDER STREET, Brooklyn |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| FILING HEREWITH FOR THE REMOVAL OF ALL THE MINOR INTERIOR IMPROVEMENT/RENOVATION OF THE PREVIOUS TENANT. | 555 MORRIS AVENUE, Bronx |
Major renovation | Aug 25, 2026 | 1 | Under $250,000 |