| MINOR RENOVATION TO EXISTING OFFICE SUITE ON THE 16TH FLOOR. CONSTRUCT NON-BEARING INTERIOR PARTITIONS, INSTALL NEW VRF AIR CONDITIONING SYS | 29 WEST 38 STREET, Manhattan |
Mechanical | Aug 20, 2026 | 2 | $250,000 to $1 million |
| INTERIOR LOCALIZED STRUCTURAL REINFORCEMENT AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 111 BROADWAY, Manhattan |
Major renovation | Aug 20, 2026 | 1 | Under $250,000 |
| Foundation work for new front and rear extensions and conversion from one-family to two-family dwelling | 133-08 95 AVENUE, Queens |
Major renovation | Aug 20, 2026 | 1 | Under $250,000 |
| REPLACE GAS/OIL BURNER ON EXISTING BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | 59 PARK AVENUE, Manhattan |
Mechanical | Aug 20, 2026 | 2 | Under $250,000 |
| GAS INFRASTRUCTURE RESTORATION AND INSTALLATION OF APPLIANCE AND LOCK-WING VALVES AT ALL STOVES IN APARTMENTS. NO CHANGE IN EGRESS OR OCCUPA | 1 WEST END AVENUE, Manhattan |
Plumbing | Aug 20, 2026 | 2 | $250,000 to $1 million |
| Install non-illuminated wall sign reading - minute clinic - facing 31st St. | 31-01 DITMARS BOULEVARD, Queens |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| Sprinkler modifications taking place on the 6th floor (Parlux) as per plans filed herewith. No change in use, egress or occupancy. | 630 3 AVENUE, Manhattan |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| Sprinkler work as shown on plans filed herewith. No change in use, egress, or occupancy | 841 BROADWAY, Manhattan |
Other | Aug 20, 2026 | 1 | $250,000 to $1 million |
| Sprinkler head changes as indicated on plans. | 885 THIRD AVENUE, Manhattan |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| Structural work for vertical & horizontal enlargement to existing two-story and cellar building in conjunction with Alt-1 # B01332706-I1. | 1353 41 STREET, Brooklyn |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| Interior Alterations to residence consisting of opening in interior load bearing wall and rear exterior facade. | 18-67 MENAHAN STREET, Queens |
Roofing and exterior | Aug 20, 2026 | 1 | Under $250,000 |
| SPRINKLER MODIFICATIONS FOR 22ND FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. | 535 MADISON AVENUE, Manhattan |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| INSTALLATION OF TEMPORARY CONSTRUCTION FENCE, SIDEWALK SHED, AND SUPPORTED SCAFFOLD AT EXISTING BUILDING. SIDEWALK SHED SHALL COMPLY WITH CH | 117 TAAFFE PLACE, Brooklyn |
Other | Aug 20, 2026 | 3 | Under $250,000 |
| ALTERATION OF AN SINGLE FAMILY DWELLING BUILDING. NON-LOAD BEARING PARTITION WALL WORK. ALTERATION OF REAR WOODEN DECK. NEW FIXTURES, FINISH | 29-31 159 STREET, Queens |
Major renovation | Aug 20, 2026 | 2 | Under $250,000 |
| Installation of a temporary supported scaffold and temporary enclosure per plan submitted. Work shall comply with 2022 building codes chapte | 40 WEST 23 STREET, Manhattan |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| INTERIOR RENOVATION AND REPAIR FIRE DAMAGE HOUSE FRAMING AT REAR ,NEW WINDOWS , NEW VERTICAL AND HORIZONTAL ENLARGEMENT AT SNTRY , NEW STEPS | 1475 ARDEN AVENUE, Staten Island |
Roofing and exterior | Aug 20, 2026 | 1 | $250,000 to $1 million |
| INTERIOR RENOVATION OF APT 6BC. PARTITION CHANGES TO NON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | 188 EAST 70 STREET, Manhattan |
Major renovation | Aug 20, 2026 | 1 | Under $250,000 |
| This application is filed for a temporary use permit for a sales office pursuant to section AC 28-111 and BB 2010-002. Temporary use permit | 757 FLATBUSH AVENUE, Brooklyn |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| foundation drawings in conjunction with NB filing | 158 SOUTH OXFORD STREET, Brooklyn |
Other | Aug 20, 2026 | 1 | Subscribers |
| Installation of a temporary wood construction fence around the perimeter of the one family detached residence | 15 COLLEGE AVENUE, Staten Island |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| Full demolition of Existing 2 story Building. | 23 WYTHE AVENUE, Brooklyn |
Demolition | Aug 20, 2026 | 1 | Under $250,000 |
| INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 220 KIMBERLY PLACE, Bronx |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| INSTALLATION OF TEMPORARY CONSTRUCTION WOOD FENCE PER PLAN SUBMITTED DURING ALTERATION WORK. | 37-11 35 AVENUE, Queens |
Major renovation | Aug 20, 2026 | 1 | Under $250,000 |
| Masonry repairs at the interior elevations of water tank enclosure. | 211 EAST 79 STREET, Manhattan |
Major renovation | Aug 20, 2026 | 1 | Under $250,000 |
| NYC DEV HUB: SOE Work in conjunction with new building construction. | 35-53 41 STREET, Queens |
Other | Aug 20, 2026 | 1 | Subscribers |
| SPRINKLER MODIFICATIONS (ZARA STORE KIDS 3RD FLOOR) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 500 WEST 33 STREET, Manhattan |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| Subsequent filing for structural work | 236 SKILLMAN STREET, Brooklyn |
Other | Aug 20, 2026 | 1 | Subscribers |
| INTERIOR RENOVATION OF EXISITING APARTMENT 1D, INCUDING REMOVAL OF NON-LOAD BEARING PARTITIONS, FIXTURES AND FINISHINGS AS PER PLANS FILED . | 147 WEST 79 STREET, Manhattan |
Major renovation | Aug 20, 2026 | 2 | Under $250,000 |
| Sprinkler work during interior demolition on 28th marketing floor (27th construction floor) | 1155 6 AVENUE, Manhattan |
Demolition | Aug 20, 2026 | 1 | Under $250,000 |
| Sprinkler work during construction for Jenner & Block on 28th marketing floor (27th construction floor) | 1155 6 AVENUE, Manhattan |
Other | Aug 20, 2026 | 1 | Under $250,000 |