| - For New Decks to an Existing One Family Dwelling as per attached standards. Deviations from these standards require submission of construc | 7437 BEVERLY RD, Philadelphia |
Other | Aug 11, 2026 | 1 | Subscribers |
| Install a 1600-amp electrical service system, including wiring, equipment and 46 meter packs including proper grounding and bonding. Install | 2800 DIAMOND ST, Philadelphia |
Other | Aug 11, 2026 | 1 | Subscribers |
| For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references co | 1817 N 57TH ST, Philadelphia |
Roofing and exterior | Aug 11, 2026 | 2 | Subscribers |
| Solar Photovoltaic Equipment installed on a one- or two-family dwelling with no ESS equipment and roof slopes not exceeding 2:12 (17%) in ac | 1721 TASKER ST, Philadelphia |
Electrical | Aug 11, 2026 | 2 | Subscribers |
| EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per | 3319 EDGEMONT ST, Philadelphia |
Mechanical | Aug 11, 2026 | 2 | Subscribers |
| For sitework to include new athletic field, improvements to the basketball courts, stormwater management, drainage, fencing, landscaping, an | 7301 TORRESDALE AVE, Philadelphia |
Major renovation | Aug 11, 2026 | 2 | Subscribers |
| For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references co | 4748-50 TACONY ST, Philadelphia |
Roofing and exterior | Aug 11, 2026 | 2 | Subscribers |
| FOR THE LEVEL II INTERIOR ALTERATIONS FOR THE RENOVATION TO THE BATHROOM IN UNIT #3 ON THE THIRD FLOOR OF AN EXISTING BUILDING. ALL WORK TO | 704-10 S 6TH ST, Philadelphia |
Major renovation | Aug 11, 2026 | 3 | Subscribers |
| For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references co | 409 WESTVIEW AVE, Philadelphia |
Demolition | Aug 11, 2026 | 3 | Subscribers |
| Interior renovations of an existing single family structure. details as shown on the plan. no structural work. | 2205 DELANCEY PL, Philadelphia |
Major renovation | Aug 11, 2026 | 3 | Subscribers |
| - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocatio | 2227 BAINBRIDGE ST, Philadelphia |
Major renovation | Aug 11, 2026 | 4 | Subscribers |
| For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references co | 2043 CHURCH LN, Philadelphia |
Roofing and exterior | Aug 11, 2026 | 2 | Subscribers |
| For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references co | 1971 ASHLEY RD, Philadelphia |
Other | Aug 11, 2026 | 4 | Subscribers |
| FOR THE ERECTION OF AN ATTACHED STRUCTURE TO INCLUDE A ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN PLANS. | 1528 S LECOUNT ST, Philadelphia |
Major renovation | Aug 11, 2026 | 7 | Subscribers |
| FOR THE ERECTION OF A DEMISING WALL TO SEPARATE AN EXISTING VACANT SPACE INTO TWO (2) TENANT SPACES PER APPROVED PLANS. SEPARATE PERMITS REQ | 5361-91 CHEW AVE, Philadelphia |
Major renovation | Aug 11, 2026 | 8 | Subscribers |
| EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations f | 611 S 7TH ST, Philadelphia |
Major renovation | Aug 11, 2026 | 5 | Subscribers |
| 4 water closet 2 lav 4 sink 2 mop sink floor drain | 1213 CREASE ST, Philadelphia |
Plumbing | Aug 11, 2026 | 4 | Subscribers |
| FOR THE ERECTION OF AN ADDITION AT THE REAR, ELIMINATION OF THE INTERIOR PARKING SPACE, CONVERSION OF THE ATTACHED GARAGE INTO HABITABLE SPA | 9523 NORTHEAST AVE, Philadelphia |
Major renovation | Aug 11, 2026 | 3 | Subscribers |
| Roof deck on existing 2nd floor roof of single-family dwelling as per approved plan | 1905 S 16TH ST, Philadelphia |
Major renovation | Aug 11, 2026 | 4 | Subscribers |
| For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references co | 1626 SPARKS ST, Philadelphia |
Roofing and exterior | Aug 11, 2026 | 3 | Subscribers |
| Eating and Drinking Establishments - Sit-Down Restaurant | 5435 N 5TH ST, Philadelphia |
Major renovation | Aug 11, 2026 | 2 | Subscribers |
| EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations f | 3025 JOHN F KENNEDY BLVD, Philadelphia |
Major renovation | Aug 11, 2026 | 10 | Subscribers |
| Residential - Household Living - Multi-Family | 4928 N 5TH ST, Philadelphia |
Major renovation | Aug 10, 2026 | 1 | Subscribers |
| Erection of Three story attach structure (Height NTE 38 feet). Size an location per plan. | 623 W GIRARD AVE, Philadelphia |
New commercial construction | Aug 10, 2026 | 1 | Subscribers |
| Erection of Three story attach structure (Height NTE 38 feet). Size an location per plan. | 621 W GIRARD AVE, Philadelphia |
New commercial construction | Aug 10, 2026 | 1 | Subscribers |
| Retail Sales - Food, Beverages, and Groceries | 3874 POPLAR ST, Philadelphia |
Major renovation | Aug 10, 2026 | 1 | Subscribers |
| FOR ERECTION OF ONE (1) NON-ILLUMINATED ACCESSORY FLAT WALL SIGN ON EXISTING STRUCTURE. SIZE AND LOCATION AS SHOWN ON THE APPLICATION / PLAN | 113-47 E HUNTING PARK AVE, Philadelphia |
Other | Aug 10, 2026 | 1 | Subscribers |
| FOR REMOVAL TWO (2) EXISTING FLAT WALL SIGNS AND ERECTION OF TWO (2) NON-ILLUMINATED FLAT WALL SIGNS ON EXISTING STRUCTURE. SIZE AND LOCATIO | 7100 GERMANTOWN AVE, Philadelphia |
Other | Aug 10, 2026 | 1 | Subscribers |
| For the erection of a detached structure and creation of one (1) accessory surface parking space. Size and location as shown in plan. | 5210 REXFORD RD, Philadelphia |
Major renovation | Aug 10, 2026 | 1 | Subscribers |
| Retail Sales - Consumer Goods | 23-25 S 19TH ST, Philadelphia |
Major renovation | Aug 10, 2026 | 1 | Subscribers |