| - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocatio | 2317 N HANCOCK ST, Philadelphia |
Major renovation | May 21, 2026 | 2 | Subscribers |
| FOR THE INSTALLATION OF ROOF-MOUNTED SOLAR COLLECTORS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLA | 111 HILLTOP RD, Philadelphia |
Electrical | May 21, 2026 | 2 | Subscribers |
| FOR THE STRUCTURAL REPAIR TO EXTERIOR WALL, JOISTS AND ROOF TO RESOLVE CASE #CF-2026-024433. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONA | 710 N 42ND ST, Philadelphia |
Roofing and exterior | May 21, 2026 | 2 | Subscribers |
| rear steps alteration and basement renovation of an existing single fmaily dwelling, details as shown on the plan. NO UNDERPINNING IN THIS S | 5701 VANDIKE ST, Philadelphia |
Major renovation | May 21, 2026 | 3 | Subscribers |
| - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocatio | 1705 BENSON ST, Philadelphia |
Major renovation | May 21, 2026 | 4 | Subscribers |
| FOR STRUCTURAL ALTERATION, REMOVAL AND REPLACEMENT OF THE ENTIRE ROOF FRAMING, TO AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE-FAMILY DWE | 2102 E DAUPHIN ST, Philadelphia |
Major renovation | May 21, 2026 | 2 | Subscribers |
| FOR A VERTICAL ADDITION IN THE REAR WITH A ROOF DECK ACCESSED BY THE THIRD FLOOR WITH INTERIOR ALTERATIONS THROUGHOUT AN EXISTING ATTACHED S | 2640 FEDERAL ST, Philadelphia |
Major renovation | May 21, 2026 | 4 | Subscribers |
| interior alterations the removal of the stairwell to convert a single family to a two family dwellings, Details as shwon on the plan. | 1530 S 53RD ST, Philadelphia |
Major renovation | May 21, 2026 | 4 | Subscribers |
| FOR PARTIAL DEMOLITION OF EXISTING REAR ONE STORY PORTION AND ERECTION OF TWO STORY REAR ADDITION AND ONE STORY ADDITION ABOVE THE EXISTING | 2214 E LETTERLY ST, Philadelphia |
Major renovation | May 21, 2026 | 2 | Subscribers |
| FOR THE ERECTION OF A TWO-STORY ATTACHED STRUCTURE WITH BASEMENT. HEIGHT NTE 25 FT. SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLAN. SEE | 1610 W VENANGO ST, Philadelphia |
Major renovation | May 21, 2026 | 7 | Subscribers |
| FOR THE ERECTION OF A TWO-STORY ATTACHED STRUCTURE WITH BASEMENT. HEIGHT NTE 25 FT. SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLAN. SEE | 1612 W VENANGO ST, Philadelphia |
Major renovation | May 21, 2026 | 7 | Subscribers |
| FOR THE ERECTION OF A TWO-STORY ATTACHED STRUCTURE WITH BASEMENT. HEIGHT NTE 25 FT. SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLAN. SEE | 1614 W VENANGO ST, Philadelphia |
Major renovation | May 21, 2026 | 7 | Subscribers |
| FOR THE ERECTION OF A TWO-STORY ATTACHED STRUCTURE WITH BASEMENT. HEIGHT NTE 25 FT. SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLAN. SEE | 1616 W VENANGO ST, Philadelphia |
Major renovation | May 21, 2026 | 7 | Subscribers |
| FOR THE ERECTION OF A TWO-STORY ATTACHED STRUCTURE WITH BASEMENT. HEIGHT NTE 25 FT. SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLAN. SEE | 1618 W VENANGO ST, Philadelphia |
Major renovation | May 21, 2026 | 7 | Subscribers |
| FOR THE PARTIAL DEMOLITION AND ERECTION OF REAR AND VERTICAL ADDITIONS TO AN EXISTING ATTACHED BUILDING TO INCLUDE WALK-OUT ROOF DECK ON SEC | 2216 E LETTERLY ST, Philadelphia |
Major renovation | May 21, 2026 | 2 | Subscribers |
| FOR THE INSTALLATION OF ONE (1) ACCESSORY DOUBLE FACED FREE-STANDING SIGN WITH DIGITAL ANIMATED ILLIMINATION AND STATIC ILLUMINATION. | 3500 ACADEMY RD, Philadelphia |
Other | May 21, 2026 | 3 | Subscribers |
| For the erection of a third-floor addition at the rear of an existing attached structure. details per plans. | 1709 S 2ND ST, Philadelphia |
Major renovation | May 21, 2026 | 2 | Subscribers |
| FOR THE RELOCATION OF LOT LINES TO CREATE ELEVEN(11) LOTS (PARCEL “A”, PARCEL “B”, PARCEL”C”, PARCEL”D”, PARCEL ”E”, PARCEL”F”, PARCEL”G”, P | 1620 W VENANGO ST, Philadelphia |
Other | May 21, 2026 | 7 | Subscribers |
| Install new panels and branch circuits for EV charging stations as per 2017 NEC. | 1820 RITTENHOUSE SQ, Philadelphia |
Electrical | May 21, 2026 | 4 | Subscribers |
| INSTALLATION OF ROOFTOP MOUNTED 4.4 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER EZ STANDARD. | 7414 MALVERN AVE, Philadelphia |
Electrical | May 21, 2026 | 2 | Subscribers |
| Personal Services | 7919 BUSTLETON AVE, Philadelphia |
Major renovation | May 20, 2026 | 1 | Subscribers |
| Limited Lodging | 3126 LIVINGSTON ST, Philadelphia |
Major renovation | May 20, 2026 | 1 | Subscribers |
| FOR THE ERECTION OF VARIOUS DETACHED STRUCTURES, PLAY EQUIPMENT, FEATURE WALLS. SIZES AND LOCATIONS AS SHOWN IN PLAN. | 1 S CHRISTOPHER COLUMBUS BLVD, Philadelphia |
New commercial construction | May 20, 2026 | 1 | Subscribers |
| Limited Lodging | 5860 HAZEL AVE, Philadelphia |
Major renovation | May 20, 2026 | 1 | Subscribers |
| FOR THE ERECTION OF AN ATTACHED BUILDING TO INCLUDE ROOF DECK AND ROOF DECK ACCESS STRUCTURES. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLA | 213-19 POPLAR ST, Philadelphia |
New commercial construction | May 20, 2026 | 1 | Subscribers |
| Public, Civic, and Institutional - Libraries and Cultural Exhibits | 111 N 3RD ST, Philadelphia |
Major renovation | May 20, 2026 | 1 | Subscribers |
| Limited Lodging | 2842 S ISEMINGER ST, Philadelphia |
Major renovation | May 20, 2026 | 1 | Subscribers |
| FOR THE ERECTION OF TWO (2) STATICALLY ILLUMINATED ACCESSORY WALL SIGNS. SIZE AND LOCATION AS SHOWN IN PLANS. | 1701 MARKET ST, Philadelphia |
Other | May 20, 2026 | 1 | Subscribers |
| Residential Zoning Family Daycare at 1632 67TH AVE | 1632 67TH AVE, Philadelphia |
Other | May 20, 2026 | 1 | Subscribers |
| Limited Lodging | 2126 PALETHORP ST, Philadelphia |
Major renovation | May 20, 2026 | 1 | Subscribers |