| *** See note in condition box-Hyatt*** T-Mobile (Unit #2) cell tower site was vandalized thieves came in and cut overhead service lines to d | 807 1/2 RUBY DR UNIT B, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 2004 ABBEY CIR, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| Install Level 2 EV Charger | 6500 JENNINGS DR, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| replace a tank with a tankless | 11420 GOSSAMER DR, AUSTIN |
Plumbing | Aug 13, 2026 | 1 | Subscribers |
| Express: Foundation repair | 13516 RYAN MATTHEW DR, AUSTIN |
Other | Aug 13, 2026 | 1 | Under $250,000 |
| BASE: Installing a backup battery system and additional meter socket. | 9436 HOPELAND DR, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| 1.7 MW roof top PV solar installation with microinverters | 3301 HIBBETTS RD, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| Update overhead riser install new meter can install new 125 amp outdoor main breaker update grounding. | 8310 FRANWOOD LN, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 6712 CUESTA TRL, AUSTIN |
Mechanical | Aug 13, 2026 | 1 | Subscribers |
| DC/RC . Remove existing electrical service equipment. Install a 200-amp AE approved meter can. Install new breakers for existing loads. Incl | 2600 CLEAR CV, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work Belinda Wilson | 4909 SINGLE SHOT CIR, AUSTIN |
Mechanical | Aug 13, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 2106 SCHULLE AVE, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 8027 CHALK KNOLL DR, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 1913 PRAIRIE KNOLL CT BLDG A, AUSTIN |
Mechanical | Aug 13, 2026 | 1 | Subscribers |
| 120amp panel replacement. no meter work. Austin Electric is the electrical provider | 12002 GREY FAWN PATH, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| 5004 Lark Cove (Unit B) pipe by water heater needs city inspection per gas company and swapping out 50 gal water heater | 5004 LARK CV UNIT 2, AUSTIN |
Plumbing | Aug 13, 2026 | 1 | Subscribers |
| Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls park | 6111 FM 969 RD, AUSTIN |
Major renovation | Aug 13, 2026 | 1 | Subscribers |
| We will replace the existing galvanized water service line running through the yard with new PEX-A piping. | 1510 PIEDMONT AVE, AUSTIN |
Plumbing | Aug 13, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 11801 THREE OAKS TRL, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| Tunnel 10 from edge of porch to broken fitting under home. We will replace all exposed piping | 4128 GOCHMAN ST, AUSTIN |
Plumbing | Aug 13, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 2204 COLGATE LN, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| Install Level 2 EV Charger | 6002 RAIN CREEK PKWY, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| New 1-story single family residence 4 bed/2.5 bath with attached garage covered porch and covered patio Green Building | 9412 BRAIDED REIN DR, AUSTIN |
Other | Aug 13, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 8014 CARDIN DR, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| Installing new 36 inch pull boxes and upgrading main service to home this is a design project. **Add a second meter to feed shop | 8510 GALEANA TRACE CV, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work ** EDWARD NEUSEL: Change out existing 3-ton horizonta | 14 PASCAL LN, AUSTIN |
Mechanical | Aug 13, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. - ETJ | 12712 BELCARA PL, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 2708 RAE DELL AVE, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 1917 W 39TH ST, AUSTIN |
Electrical | Aug 13, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work BAJWA | 4607 MADRONA DR, AUSTIN |
Mechanical | Aug 13, 2026 | 1 | Subscribers |