| 10ft sewer line repair at city sewer line tap | 3005 LYNRIDGE DR, AUSTIN |
Plumbing | Sep 29, 2026 | 1 | Subscribers |
| 50 tunnel JP-10/30/2026- update: The sewer yard line was replaced as well. | 2109 MATTHEWS LN, AUSTIN |
Plumbing | Sep 29, 2026 | 1 | Subscribers |
| move gas line at range | 904 ISERNIA DR, AUSTIN |
Plumbing | Sep 29, 2026 | 1 | Subscribers |
| ePlan: Commercial Expedited Review - New Construction of Shell Affordable Housing Units. | 4810 GONZALES ST, AUSTIN |
New commercial construction | Sep 29, 2026 | 8 | $25 to $100 million |
| Replace RPZ for IRRIGATION W/ AUXILIARY WATER SOURCE ON SITE | 3703 BALCONES DR, AUSTIN |
Plumbing | Sep 29, 2026 | 1 | Subscribers |
| Mciver - 40-18701- Install new 3.8 kW rooftop solar system to existing residential only using backfed breaker only. | 6200 MYRA CT, AUSTIN |
Electrical | Sep 29, 2026 | 2 | Subscribers |
| Total demo of sfr 1048 sqft circa 1942 | 2920 PRADO ST, AUSTIN |
Demolition | Sep 29, 2026 | 1 | Subscribers |
| Addition and remodel extending dinning room and remodel of kitchen | 8507 BARGAMIN DR, AUSTIN |
Other | Sep 29, 2026 | 3 | Under $250,000 |
| Total Demo of a SFR 1420sqft built in 1953 ***The building shall not be demolished until after the contractor has fulfilled the neighbor not | 6403 CARY DR, AUSTIN |
Demolition | Sep 29, 2026 | 1 | Subscribers |
| Installation of EV Dual Charging Station pedestal mounted at building #6. Existing multifamily building. 2026-082927 DA. | 2601 ESPERANZA XING, AUSTIN |
Other | Sep 29, 2026 | 2 | Under $250,000 |
| Repair indoor electrical sub panel. | 5504 EVANS AVE, AUSTIN |
Electrical | Sep 29, 2026 | 2 | Subscribers |
| Total Demo of SFR 1409 sqft CIRCA 1953 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notific | 6107 CARY DR, AUSTIN |
Demolition | Sep 29, 2026 | 1 | Subscribers |
| Adding a subpanel that will be 60amps from the existing panel. It will have lights outlets and one mini split for a shed approximately 140 s | 203 SHEFFIELD DR, AUSTIN |
Electrical | Sep 29, 2026 | 2 | Subscribers |
| Tenant improvement to existing space (formerly CVS) for Dollar Tree. Scope includes updating finishes and fixtures New RTUs at existing loca | 4001 W WILLIAM CANNON DR, AUSTIN |
Major renovation | Sep 29, 2026 | 4 | Subscribers |
| Total demo of SFR 1080 SqFt circa 1954 | 2603 GERAGHTY AVE, AUSTIN |
Demolition | Sep 29, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 6700 HOT SPRINGS DR, AUSTIN |
Electrical | Sep 29, 2026 | 2 | Subscribers |
| New construction accessory use in-ground pool and spa w/ concrete decking. | 1004 KAREN AVE, AUSTIN |
Other | Sep 29, 2026 | 2 | Subscribers |
| **TEMPORARY BUILDING PERMIT - Scope is limited to structural foundations for the Factory building for Project Toaster including piles grade | 475 PATTON AVE, AUSTIN |
Other | Sep 29, 2026 | 1 | Under $250,000 |
| PB: New construction of 3 story SFR attached garage covered patio 3 beds 3.5 baths | 5001 PECAN SPRINGS RD BLDG 9, AUSTIN |
Other | Sep 29, 2026 | 1 | Subscribers |
| PB: New construction of 2 story SFR condo 25 bath 3 bedrooms attached garage attached covered patio | 5001 PECAN SPRINGS RD BLDG 11, AUSTIN |
Other | Sep 29, 2026 | 1 | Subscribers |
| Green Building. New construction of 2 story SFR w/ 3 bedroom 2.5 bath attached garage covered front porch and covered patio. | 7106 STITZEL WELLER DR, AUSTIN |
Mechanical | Sep 29, 2026 | 3 | Subscribers |
| This project consists of an interior residential remodel of the existing single-family residence. No additions no increase in conditioned sq | 4906 MANCHESTER CIR, AUSTIN |
Other | Sep 29, 2026 | 4 | Under $250,000 |
| BASE: Installing a backup battery system and additional meter socket. | 1405 MATTHEWS LN, AUSTIN |
Electrical | Sep 29, 2026 | 2 | Subscribers |
| New SFR 2 - Story 4-bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio | 7104 STITZEL WELLER DR, AUSTIN |
Other | Sep 29, 2026 | 5 | Subscribers |
| New vehicular gate. | 7077 GRAND CANYON DR, AUSTIN |
Other | Sep 29, 2026 | 2 | Under $250,000 |
| ETJ-New Service AE (Commercial Office) 1600 sq.ft. New wiring new electrical devices light fixtures and new electrical breaker | 1500 S HEATHERWILDE BLVD UNIT 240, PFLUGERVILLE |
Electrical | Sep 29, 2026 | 2 | Subscribers |
| Interior Non Structural Demo | 3707 SPEEDWAY UNIT 101, AUSTIN |
Demolition | Sep 29, 2026 | 2 | Under $250,000 |
| Replace existing overhead service with new 200 AMP overhead service new 200 AMP meter can new 200 AMP main breaker load center additional gr | 6106 MOUNTAINCLIMB DR, AUSTIN |
Electrical | Sep 29, 2026 | 2 | Subscribers |
| New pool with required enclosure (heater or autofill) | 2703 OAK HAVEN DR, AUSTIN |
Other | Sep 29, 2026 | 2 | Subscribers |
| Rebuild Main Service new riser meter can panel grounding surge protection Austin energy scheduled shutdown required | 1904 SPINEL RD, AUSTIN |
Electrical | Sep 29, 2026 | 2 | Subscribers |