| 292 linear ft - 8ft board on board cedar fence with steel poles and 3 gates | 6730 TULIP LN, Dallas |
Other | Sep 2, 2026 | 1 | Subscribers |
| Inground swimming pool and spa | 5971 MELSHIRE DR, Dallas |
Other | Sep 2, 2026 | 1 | Subscribers |
| NSFAA Windows to be like for like. No brick work in front, just the wood fascia. Remove and replace aged front Fascia, Soffit and siding.Rem | 5011 GREENCREST DR, Dallas |
Major renovation | Sep 2, 2026 | 1 | Subscribers |
| 8' Cedar Board on Board fence w/Galvanized Steel posts (set 6' apart 36" deep), using 2"x4" rough cedar rails, and 2 1/4" ringshank galvaniz | 6911 GASTON AVE, Dallas |
Other | Sep 2, 2026 | 1 | Subscribers |
| Clean and Show Permit - non-electrical - electrical transferred. | 1505 WYCLIFF AVE, Dallas |
Electrical | Sep 2, 2026 | 1 | Subscribers |
| Per Conservation District, reducing height of section of fence | 5428 RICHARD AVE, Dallas |
Other | Sep 2, 2026 | 1 | Subscribers |
| NSFAA | 1834 LEATH ST, Dallas |
Other | Sep 2, 2026 | 1 | Subscribers |
| MCR W/BATTERY Installation of a 1 TESLA POWERWALL 3 BATTERY ADDITION - 13.500 kWh CAPACITY | 504 N MOROCCO AVE, Dallas |
Major renovation | Sep 2, 2026 | 2 | Subscribers |
| Clean & Show for vacant space to have Oncor turn on electricity- Lockbox 1946 | 11120 GRADER ST, Dallas |
Electrical | Sep 2, 2026 | 1 | Subscribers |
| Tenant Finish Out Work | 10031 MARSH LN, Dallas |
Major renovation | Sep 2, 2026 | 1 | Subscribers |
| MCR Address: 3020 Pegasus Parkway Scope: RENOVATION TO EXISTING TENANT SUITE IN AN OFFICE BUILDING. | 3020 PEGASUS PARK DR, Dallas |
Major renovation | Sep 2, 2026 | 1 | Subscribers |
| QTEAM INHOUSE - We are replacing rotten 2x4s in the wndows of 3 units. Unit 139,142 and 239 | 4619 LAKE AVE, Dallas |
Major renovation | Sep 2, 2026 | 1 | Subscribers |
| QTEAM PROJECT - 7.8.2026 (9AM) Ground-up new construction of a single-story office and warehouse building totaling 20,004 square feet. The b | 10102 TECHNOLOGY BLVD E, Dallas |
New commercial construction | Sep 2, 2026 | 1 | Subscribers |
| MCR W/BATTERY Install a 14.800 kW roof mounted PV solar system, 37 Panels and a Tesla Energy Gateway, Tesla Powerwall UTILITY CONTROLLED SHU | 1735 S MARSALIS AVE, Dallas |
Roofing and exterior | Sep 2, 2026 | 2 | Subscribers |
| Disconnect all utilities from residence, Demo the residence as well as backyard shed using large backhoe, giving attention to leaving mature | 3910 BOWSER AVE, Dallas |
Demolition | Sep 2, 2026 | 1 | Subscribers |
| Removing old shingles and felt down to the decking installing ice and water on valleys and installing new underlayment and new asphalt shing | 738 EZEKIAL AVE, Dallas |
Roofing and exterior | Sep 2, 2026 | 1 | Subscribers |
| Residential ReroofRemove and replace 1 shingle layerRoof profile and slope is not changingInstalling Certainteed XT25 shingles in Weathered | 1043 N EDGEFIELD AVE, Dallas |
Roofing and exterior | Sep 2, 2026 | 2 | Subscribers |
| CET 3 F - INSTALL ELECTRICAL FOR CONCESSION BOOTH | 4150 MARTIN LUTHER KING JR BLVD, Dallas |
Electrical | Sep 2, 2026 | 4 | Subscribers |
| NSFAA-CONSTRUCT NEW SFD | 1723 GARZA AVE, Dallas |
Other | Sep 2, 2026 | 4 | Subscribers |
| Remove existing one layer roof, replace one layer roof | 4314 WILLOW GROVE RD, Dallas |
Roofing and exterior | Sep 2, 2026 | 2 | Subscribers |
| MLK 24 F - COTTON CANDY INSTALL PLUMBING AT STATE FAIR CONASTER & GILES LLC | 4000 MARTIN LUTHER KING JR BLVD, Dallas |
Plumbing | Sep 2, 2026 | 9 | Subscribers |
| Swimming pool in the rear garden | 2423 N PRAIRIE AVE, Dallas |
Other | Sep 2, 2026 | 2 | Subscribers |
| QTEAM INHOUSE - New Remodel Permit for Zoox: Prior record # 2410311116_194044633-001 requires CLOSE | 2335 BURBANK ST, Dallas |
Major renovation | Sep 2, 2026 | 4 | Subscribers |
| F 161 F 1101 1ST AVE (ISAC ROUSSO) | 1101 1ST AVE, Dallas |
Electrical | Sep 2, 2026 | 5 | Subscribers |
| MCR Based on everything in the DBI estimate and our work:---**Fire damage repair and restoration of a multi-family residential building at 4 | 4700 WIMBELTON WAY, Dallas |
Major renovation | Sep 2, 2026 | 4 | Subscribers |
| NSFAA - ADDITION/PARTIAL REMODEL OF MAIN BUILDING W/ DECK EXTENSION | 1019 EVERGREEN HILL RD, Dallas |
Major renovation | Sep 2, 2026 | 4 | Subscribers |
| MCR Removal of interior partitions and re-configuration of existing bathrooms | 502 N EDGEFIELD AVE, Dallas |
Major renovation | Sep 2, 2026 | 3 | Subscribers |
| NSFAA Second story addition and full remodel of existing space | 8819 LIPTONSHIRE DR, Dallas |
Major renovation | Sep 2, 2026 | 2 | Subscribers |
| Replacing electrical panel due to faulty main breaker and unsafe wires. Moving to outside wall from where it is at now in a closet. | 6351 OLD OX RD, Dallas |
Electrical | Sep 2, 2026 | 2 | Subscribers |
| install 46 press pile piers and level the house | 6441 STONEHAVEN DR, Dallas |
Other | Sep 2, 2026 | 2 | Subscribers |