| Build a new single family residence. Does not include mechanical, or electrical. Includes plumbing. | 3751 122nd Ave NE, Bellevue |
Electrical | Feb 26, 2026 | 2 | $1 to $5 million |
| A Single Family Residential Utility Modification Side Sewer Repair Only | 16810 SE 29th St, Bellevue |
Plumbing | Feb 26, 2026 | 3 | Subscribers |
| Upgrade existing water meter, 25 110466 BS | 12127 SE 26th St, Bellevue |
Other | Feb 26, 2026 | 4 | Subscribers |
| New traffic signal at NE 37th Ct and 108th Ave NE, and associated curb, gutter, ramps and asphalt paving. | 3529 108th Pl NE - Unit 41-1, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| remove 15 ich dbh Thundercloud plum in decline | 13819 SE 2nd St, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| Remove two trees from from southern border of property. | 15334 SE 23rd St, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| Remove 23 inch diameter tree. | 15334 SE 23rd St, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| 9,820 SF, NON-STRUCTURAL INTERIOR TENANT IMPROVEMENT: WORK INCLUDES NON-STRUCTURAL DEMOLITION, NEW PARTITIONS, DOORS, SIDELIGHTS, CASEWORK A | 15395 SE 30th Pl - Bldg 4, Bellevue |
Major renovation | Feb 25, 2026 | 1 | $250,000 to $1 million |
| Install Qty (1) flush mounted individual LED illuminated channel letter set at 19 Sq Ft | 1600 148th Ave SE, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| Voluntary seismic retrofit upgrade to crawlspace of SFR, per Seattle's Project Impact standard plan set. Does not include Mechanical, Electr | 16613 SE 11th St, Bellevue |
Other | Feb 25, 2026 | 1 | Under $250,000 |
| Level 3 to access manhole in the intersection of 156th Ave SE and SE 30th Pl for splicing. This is a clone of Bellevue permit 25 115851 TJ. | 3079 156th Ave SE, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| Install a new residential fire sprinkler system based on NFPA 13D and City requirements for the new SFR. | 326 157th Ave NE, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| Underground fire service connection, 23-110801-BB | 383 111th Ave NE, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| Customer to install 2inch SCH40 conduit in JUT for Comcast services. | 1318 164th Pl NE, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| CUSTOMER TO PLACE ONE 2 INCH SCH40 CONDUIT IN JUT FROM P01 TO HOME FOR LUMEN SERVICE | 1318 164th Pl NE, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| ER Job# 101198324 - Emergency after-the-fact permit. Crew excavated in soft surface to repair UG transformer (TUT). | 805 170th Pl NE, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| ext 8/28/26 kb. STARTING NEAR 5235 HIGHLAND DR SPLICE AND TIE INTO EXISTING COMCAST PEDESTAL. PROOF PULL NEW 48CT FIBER CABLE THROUGH EXISTI | 5235 Highland Dr, Bellevue |
Roofing and exterior | Feb 25, 2026 | 1 | Subscribers |
| INSTALLING COMCAST CONDUIT TO 2648. STARTING AT PED LOCATED NEAR SW CORNER OF 2656, CREW WILL INSTALL 2INCH CONDUIT S & E APPROX 3FT TO A PL | 2648 168th Ave NE, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| ALL WORK WILL REMAIN ON PRIVATE PROPERTY. REQUEST TO PARK WORK VEHICLE & TRAILER ON RIGHT WAY IN ROW FOR DURATION OF INSTALLATION. | 14518 SE 46th St, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| reroute and connect new sewer line from house to existing concrete 6-inch stub. | 1801 86th Ave NE, Clyde Hill |
Plumbing | Feb 25, 2026 | 1 | Subscribers |
| Temporary parking and sidewalk closure associated with the sign installation, under Permit #25 121872 SA. | 288 106th Ave NE, Bellevue |
Other | Feb 25, 2026 | 1 | Subscribers |
| Demolition and removal of existing concrete walkways; installation of eighty-four (84) structural support piles; placement and tying of rein | 101 101st Ave SE - Unit site, Bellevue |
Demolition | Feb 25, 2026 | 1 | Subscribers |
| Scope is to install a total of (20) Wallbox EVSE on levels P2 & P3. Install (4) new circuits and Wallbox chargers in stalls 62-65, future ci | 75 102nd Ave NE, Bellevue |
Electrical | Feb 25, 2026 | 1 | Subscribers |
| NEW 100 AMP ENTRY MONUMENT PEDESTAL; GATE CONDUIT AND POWER; MONUMENT LIGHTING CIRCUIT | 4603 143rd Pl NE, Bellevue |
Electrical | Feb 25, 2026 | 1 | Subscribers |
| Comcast proposes to overlash 48ct fiber to existing strand; proof and pull 48ct fiber thru existing conduit. | 1035 Sunset Way, Bellevue |
Roofing and exterior | Feb 25, 2026 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Boiler or Compressor 100,001 to 399,000 BTU) | 15938 SE 43rd St, Bellevue |
Mechanical | Feb 25, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Vehicle Charging Station) | 16711 SE 40th Pl, Bellevue |
Electrical | Feb 25, 2026 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement Electrical Project Involving (6 Light Fixtures, 24 Receptacles, 15 Switches, 6 Fan) | 2290 140th Way SE, Bellevue |
Electrical | Feb 25, 2026 | 1 | Subscribers |
| A Nonresidential Repair or Replacement Electrical Project Involving (2 Added or Altered Branch Circuits), N/A | 100 Bellevue Sq, Bellevue |
Electrical | Feb 25, 2026 | 1 | Subscribers |
| A Single Family Residential New Structure Electrical Project Involving (1 Vehicle Charging Station) | 14420 SE 61st St, Bellevue |
Electrical | Feb 25, 2026 | 1 | Subscribers |