| A Single Family Residential Repair or Replacement Electrical Project Involving (1 Panel) | 4448 146th Ave SE, Bellevue |
Electrical | Dec 31, 2025 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU) | 14407 NE 12th Pl, Bellevue |
Mechanical | Dec 31, 2025 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU) | 606 128th Ave NE - Lot 4, Bellevue |
Mechanical | Dec 31, 2025 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU, 1 Heat Pump ) | 1512 177th Ave NE, Bellevue |
Mechanical | Dec 31, 2025 | 2 | Subscribers |
| Maintenance facility for light rail vehicles serving King County., 17 119388 LP | 1907 120th Ave NE, Bellevue |
Other | Dec 31, 2025 | 1 | Subscribers |
| TENANT RENOVATION TO THE EXISTING 1 STORY RETAIL SPACE. SCOPE INCLUDES THE INSTALLATION OF NEW FREESTANDING COLD FORMED CEILING, NEW FURNITU | 11111 NE 8th St - Ste 162, Bellevue |
Major renovation | Dec 31, 2025 | 1 | $250,000 to $1 million |
| A Nonresidential Alteration to Existing Structure Extend two existing sign circuits to new sign locations **Plan review waived by John Grott | 1035 116th Ave NE, Bellevue |
Electrical | Dec 31, 2025 | 2 | Subscribers |
| Repair of existing condominium exterior wall damage due to vehicle strike. **Does not include mechanical, electrical, nor plumbing** | 12234 SE 57th St - Unit 261-D, Bellevue |
Other | Dec 31, 2025 | 2 | Under $250,000 |
| Lumen to intercept cable and place in flower pot or small PED. Dig in new BSW to customer. Work is to repair damaged cable due to contractor | 9644 Evergreen Dr, Bellevue |
Other | Dec 30, 2025 | 1 | Subscribers |
| Like for Like RTU replacement for tattoo parlor | 12330 Northup Way, Bellevue |
Mechanical | Dec 30, 2025 | 1 | Subscribers |
| Removal of two trees | 14511 SE 47th Pl, Bellevue |
Other | Dec 30, 2025 | 1 | Subscribers |
| Remove a roughly 12 inch diameter cedar tree from the north edge of the backyard | 212 130th Ave SE, Bellevue |
Other | Dec 30, 2025 | 1 | Subscribers |
| FROM TERMINAL, PULL THRU TO FLOWERPOT, 45' BORE, EXTEND CUSTOMER CONDUIT TO END OF BORE., ZIPLY FIBER - 199618 | 10010 NE 27th St, Bellevue |
Other | Dec 30, 2025 | 1 | Subscribers |
| CCTV Sewer inspections to PSE as part of their Cross Bore Safety Program. We are Non Invasive. No digging, trenching or boring at all. Each | 9536 Lake Washington Blvd NE, Bellevue |
Plumbing | Dec 30, 2025 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU) | 17250 SE 49th Pl, Bellevue |
Mechanical | Dec 30, 2025 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU) | 15027 SE 14th St, Bellevue |
Mechanical | Dec 30, 2025 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU) | 1622 121st Ave SE, Bellevue |
Mechanical | Dec 30, 2025 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Water Service - 1") | 5024 156th Ave SE, Bellevue |
Plumbing | Dec 30, 2025 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure None Project Involving (1 Generator, 1 Gas Piping Only (No fixtures)) | 24 Lopez Ky, Bellevue |
Mechanical | Dec 30, 2025 | 2 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU) | 12058 SE 41st St - Lot 2, Bellevue |
Mechanical | Dec 30, 2025 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Heat Pump, 2 Added or Altered Branch Circuits), | 428 168th Ave SE, Bellevue |
Electrical | Dec 30, 2025 | 2 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (2 Resistance Heater, 2 Added or Altered Branch Ci | 2399 Killarney Way, Bellevue |
Electrical | Dec 30, 2025 | 1 | Subscribers |
| A Single Family Residential New Structure None Project Involving (1 Gas Piping Only (No fixtures)) | 4603 164th Ave SE, Bellevue |
Mechanical | Dec 30, 2025 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Water Heater Electric => 60 gallons) | 416 159th Pl SE, Bellevue |
Plumbing | Dec 30, 2025 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure None Project Involving (1 Generator) | 21 Lummi Ky, Bellevue |
Mechanical | Dec 30, 2025 | 2 | Subscribers |
| A Single Family Residential Alteration to Existing Structure None Project Involving (1 Generator) | 486 W Lake Sammamish Pkwy NE, Bellevue |
Mechanical | Dec 30, 2025 | 2 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 1 Added or Altered Branch Circuits | 920 165th Ave SE, Bellevue |
Electrical | Dec 30, 2025 | 1 | Subscribers |
| Installation of new 1 deck water meter | 1354 165th Ave NE, Bellevue |
Other | Dec 30, 2025 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU) | 14805 NE 12th St, Bellevue |
Mechanical | Dec 30, 2025 | 2 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU) | 4741 132nd Ave SE, Bellevue |
Mechanical | Dec 30, 2025 | 2 | Subscribers |