| Closure of I405 northbound for construction of NE 85th Street Interchange in Kirkland. Detour signage to be placed within Bellevue ROW. | 818 112th Ave NE, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| Replace worn elements on existing residential dock. Dock framing to be replaced with ACZA treated fir, stringers to be 4in x 8in. Pile caps | 804 W Lake Sammamish Pkwy SE, Bellevue |
Other | Aug 28, 2026 | 1 | Under $250,000 |
| Installation of a stand-alone NFPA 13D system, comprised of CPVC pipe and fittings. | 8048 NE 8th St, Medina |
Other | Aug 28, 2026 | 1 | Subscribers |
| Removal of two trees | 14616 NE 36th St - Bldg E, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| Connecting side sewer to convert septic to sewer | 11226 Newcastle Way, Bellevue |
Plumbing | Aug 28, 2026 | 1 | Subscribers |
| Demolish the existing driveway and replace it with a new 24-foot-wide driveway and approach in accordance with City of Bellevue Standard Dra | 12927 SE 5th Pl, Bellevue |
Demolition | Aug 28, 2026 | 1 | Subscribers |
| Job# 109162626 - From existing 2in STW Main, install 45ft of 1-1,8in PE SCAT Stub and connect to the already installed and left on air servi | 3251 99th Ave NE, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| INSTALLING COMCAST CONDUIT TO 376. STARTING AT PED LOCATED NEAR NW CORNER OF 360, CREW WILL AERIAL TAP THE UTILITY POLE ON THE S SIDE OF W L | 376 Northup Way, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| INSTALLING COMCAST CONDUIT TO 4601. STARTING AT PED LOCATED NEAR NE CORNER OF 15819, CREW WILL INSTALL 2INCH CONDUIT NW, SW APPROX 56FT TO A | 4601 159th Ave SE, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| INSTALLING COMCAST CONDUIT TO 2440. STARTING AT PED LOCATED NEAR NW CORNER OF 2422, CREW WILL INSTALL 2INCH CONDUIT W, N APPROX 78FT TO A PL | 2440 168th Ave NE, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| INSTALLING COMCAST CONDUIT TO 10536. STARTING AT PED LOCATED NEAR SW CORNER OF 10524, CREW WILL INSTALL 2INCH CONDUIT S, E, N APPROX 130FT T | 10536 NE 20th St, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| LUMEN TO ACCESS AND SPLICE AT MH204. NO SURFACE DISTURBANCE. | 845 106th Ave NE, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| ER Job# 101205976 - Emergency after-the-fact permit. Crew parked in ROW to replace B.O. transformer cut-out on Pole Grid# 221227-167225. Aer | 4020 134th Ave SE, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| ER Job# 101206161 - Emergency after-the-fact permit. Crew parked in ROW only, all work completed on private property. | 744 96th Ave SE, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| ER Job# 101206165 - Emergency after-the-fact permit. Crew replaced Handhole at 15613 fed from TUT Transformer at Grid 221024-167983. Soft su | 15613 SE 43rd St, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| Re roof removal existing shingles, inspections of sheathing, install new underlayment, new CertainTeed landmark shingles, new gutters | 14624 NE 38th St, Bellevue |
Major renovation | Aug 28, 2026 | 1 | Under $250,000 |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Vehicle Charging Station) | 6628 114th Ave SE - Lot 149-KC, Bellevue |
Electrical | Aug 28, 2026 | 3 | Subscribers |
| A Multifamily Residential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System), N/A | 111 Cedar Crest Ln, Bellevue |
Electrical | Aug 28, 2026 | 1 | Subscribers |
| A Single Family Residential Addition to Existing Structure Electrical Project Involving (2 Added or Altered Branch Circuits) | 5456 156th Ave SE, Bellevue |
Electrical | Aug 28, 2026 | 1 | Subscribers |
| A Single Family Residential Reroofing Residence Project Involving (1 Asphalt Shingle - New, 1 Wood Shingle - Existing, 1 Roof Rafters or Tru | 4749 Somerset Dr SE, Bellevue |
Major renovation | Aug 28, 2026 | 1 | Subscribers |
| A Single Family Residential Reroofing Residence Project Involving (1 Asphalt Shingle - New, 1 Roof Rafters or Trusses 24" on center, 1 Plywo | 2524 162nd Ave NE, Bellevue |
Major renovation | Aug 28, 2026 | 1 | Subscribers |
| A Single Family Condo Unit Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 1 Added or Altered Branch Circuits) | 100 98th Ave NE, Bellevue |
Electrical | Aug 28, 2026 | 1 | Subscribers |
| Job# 101202550 - Upgrade OH transformer and install (1) 3in riser at P01. OH to UG service conversion. Trench 3x12x3 in soft surface from P0 | 10425 SE 20th St, Bellevue |
Major renovation | Aug 28, 2026 | 1 | Subscribers |
| Customer to install 2inch SCH40 conduit in JUT for Comcast services. | 14433 SE 41st St, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| A Nonresidential Repair or Replacement Fire Sprinkler Systems Project Involving (20 Total Sprinkler Heads) | 11235 SE 6th St, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| Job# 101204468 - UG service replacement. Trench in new conduit and UG service from Handhole HH1 to property, 1x55x4 in soft surface. | 5328 135th Pl SE, Bellevue |
Other | Aug 28, 2026 | 2 | Subscribers |
| Install a new residential fire sprinkler system based on NFPA 13D and City requirements for the new SFR. | 936 138th Ln SE, Bellevue |
Other | Aug 28, 2026 | 1 | Subscribers |
| Residential water damage reconstruction including removal and replacement of deteriorated structural floor framing, support beams, support p | 15667 SE 8th St, Bellevue |
Other | Aug 28, 2026 | 2 | Under $250,000 |
| BUILD-OUT OF VACANT TENANT SPACE WITHIN LEVEL 11. TENANT WILL NOW OCCUPY THE FULL FLOOR. NO STRUCTURAL WORK PERFORMED WITH THE EXCEPTION OF | 555 110th Ave NE, Bellevue |
Major renovation | Aug 28, 2026 | 1 | $1 to $5 million |
| RENOVATION OF EXISTING OFFICE SPACE GROUP B OCCUPANCY ON THE 6TH FLOOR, APPROXIMATELY 10,092 RSF. NO WORK IS PROPOSED WITHIN THE EXISTING EL | 555 110th Ave NE, Bellevue |
Major renovation | Aug 28, 2026 | 1 | $1 to $5 million |