| Tenant improvement to existing Party City for a new Five Below. Interior alterations consist of new interior partitions, finishes, fixtures, | 15600 NE 8th St - Ste E2, Bellevue |
Major renovation | Aug 20, 2026 | 1 | Under $250,000 |
| Install DAS system: Head end, cabling to support (1) donor antenna, and (14) antenna modules | 4255 153rd Ave SE, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Demo existing SFR, 26 108851 GD. -------- MIDDLE HOUSING PROJECT ---------- | 3626 164th Pl SE, Bellevue |
Demolition | Aug 20, 2026 | 1 | Subscribers |
| Modification of an existing deck and connecting stairs on a residential house to improve it's durability, bring it up to current code and to | 5639 126th Ave SE, Bellevue |
Other | Aug 20, 2026 | 1 | Under $250,000 |
| The goal of this project is to remove and replace the siding and decking on the North and East elevations of Building H. The scope will incl | 14605 NE 34th St - Bldg H, Bellevue |
Major renovation | Aug 20, 2026 | 1 | $250,000 to $1 million |
| Job# 101187830 - P01 POLE REPLACEMENT, OH XFMR, RISER, LIGHT TRASNFER. OH SECONDARY REMOVAL. OH TO UG SVC CONVERSION. | 13656 SE 7th St, Bellevue |
Major renovation | Aug 20, 2026 | 1 | Subscribers |
| CUSTOMER TO PLACE ONE 2 INCH SCH40 CONDUIT IN JUT FROM P01 TO HH FOR LUMEN SERVICE. | 13656 SE 7th St, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Customer to install 2inch SCH40 conduit in JUT for Comcast services. | 13656 SE 7th St, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Interior only TI involving new demising wall to divide existing suite into 2 separate suites. New suite A215 to get a new entry, walls and d | 11235 SE 6th St, Bellevue |
Major renovation | Aug 20, 2026 | 1 | $250,000 to $1 million |
| Customer to install 2inch SCH40 conduit in ROW approx 8ft for Comcast services. Comcast cannot follow route for power, this is a standalone | 9603 Evergreen Dr, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Job# 101206076 - Crew to park along West bound lane of cul-de-sac next to V01 only. All work to be completed on private property. | 14726 SE 65th St, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Job# 109171363 - Traffic control signage to be set up along North & South bound lanes of 140th Ave NE. All potholing work to be completed on | 3438 140th Ave NE, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Job# 109171336 - Pothole #1 - Pothole existing 2in PE main at 50ft S CL of NE 40th Pl and 20ft W CL of 142nd Pl NE for material identificati | 14201 NE 40th Pl, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Job# 109171775 - Set 42ft of 1-1,8in PE SCAT Stub. (1) 3x5x2 soft surface and (3) 3x5x2 asphalt cuts anticipated. | 12920 NE 32nd Pl, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Job# 101206084 - Replace B.O. Handhole & Fargos at HH01. Soft surface disturbance only. | 1455 180th Ave NE, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| ER Job# 101205927 - Emergency after-the-fact permit. Crew excavated to replace pole and upgrade OH transformer at Grid 222007-168332. Old po | 16621 SE 16th St, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Install a new residential fire sprinkler system based on NFPA 13D and City requirements for the new SFR. | 3421 96th Ave NE, Clyde Hill |
Other | Aug 20, 2026 | 1 | Subscribers |
| CONSTRUCTION TO CONSIST OF ACCESS EXISTING COMCAST EQUIPMENT ON POLE FOR MAINTENANCE, UPGRADE EXISTING COMCAST AERIAL SPLICE CASE, OVERLASH | 4325 130th Pl SE, Bellevue |
New commercial construction | Aug 20, 2026 | 1 | Subscribers |
| Job# 109171350 - (2) Potholes for material identification. Pothole #1 - Pothole 2in PE-A IP Main at 50ft S CL of NE 27th Pl & 17ft W CL of 1 | 2614 160th Ave NE, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Job# 105110269 - COB Project - Lakemont at Red Town Trailhead RRFB Crosswalk. Install new OH transformer and (1) 3in riser at P01. Install n | 15502 Newcastle Golf Club Rd, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Install a new residential fire sprinkler system based on NFPA 13D and City requirements for the new SFR. | 5246 116th Pl SE, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Removal of existing pavers within the right-of-way. This permit also requests approval of the existing fence currently located within the RO | 626 174th Pl NE, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| Remove a Dead Pine tree from backyard | 1117 141st Pl NE, Bellevue |
Other | Aug 20, 2026 | 1 | Subscribers |
| A Nonresidential Partial Demoltion Primary Building, 26 118115 BY | 13150 SE 32nd St, Bellevue |
Demolition | Aug 20, 2026 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU, 1 Heat Pump ) | 14623 SE 49th St, Bellevue |
Mechanical | Aug 20, 2026 | 2 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Water Service - 1") | 5835 129th Ave SE, Bellevue |
Plumbing | Aug 20, 2026 | 1 | Subscribers |
| A Single Family Residential Remodel Residence Project Involving (Living Room, Bedroom, Kitchen, Den, Bathroom, Family Room), McDonnell | 1020 147th Pl NE, Bellevue |
Major renovation | Aug 20, 2026 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Water Service - 1") | 14769 SE 63rd St, Bellevue |
Plumbing | Aug 20, 2026 | 1 | Subscribers |
| A Single Family Residential Utility Modification Side Sewer Repair Only | 16840 NE 11th Pl, Bellevue |
Plumbing | Aug 20, 2026 | 1 | Subscribers |
| A Single Family Residential Reroofing Residence Project Involving (1 Asphalt Shingle - New, 1 Roof Rafters or Trusses 24" on center, 1 Plywo | 4509 177th Ave SE, Bellevue |
Major renovation | Aug 20, 2026 | 1 | Subscribers |