| A Single Family Condo Unit Remodel Residence Project Involving (Bathroom) | 177 107th Ave NE - Unit 1702, Bellevue |
Major renovation | Aug 6, 2026 | 2 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU) | 5116 139th Pl SE, Bellevue |
Mechanical | Aug 6, 2026 | 2 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Heat Pump ) | 5211 148th Ave SE, Bellevue |
Mechanical | Aug 6, 2026 | 2 | Subscribers |
| Lime is contracted with City of Bellevue to offer shared micromobility services across an agreed service area of the City. | 450 110th Ave NE, Bellevue |
Other | Aug 6, 2026 | 1 | Subscribers |
| INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. EXISTING BUILT-IN FIXTURES TO BE DEMOLISHED. INTERIOR WALL PARTITIONS TO REMAIN. EXISTING | 202 Bellevue Sq, Bellevue |
Major renovation | Aug 6, 2026 | 2 | Under $250,000 |
| Finish-out of existing basement bathroom. Rough-in of bathroom was part of larger basement remodel which passed inpsection (permit 22 130499 | 12121 SE 21st St, Bellevue |
Major renovation | Aug 6, 2026 | 3 | Subscribers |
| A Nonresidential Repair or Replacement None Project Involving (1 Water Heater Electric < 60 gallons) | 12816 SE 38th St - Unit K, Bellevue |
Plumbing | Aug 6, 2026 | 2 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU, 1 Air Conditioner) | 4457 142nd Ave SE, Bellevue |
Mechanical | Aug 6, 2026 | 2 | Subscribers |
| New Water meter-connection Lot 4, The Overlook at Glenridge SP, 25 118957 BS | 971 138th Ln SE, Bellevue |
Other | Aug 6, 2026 | 3 | $1 to $5 million |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Generator - Outside) | 845 97th Ave SE, Bellevue |
Electrical | Aug 6, 2026 | 2 | Subscribers |
| A Single Family Residential Repair or Replacement Electrical Project Involving (1 Service Change 126-200 amps, 1 Panel, 1 Ground Rod) | 15015 SE 46th Pl, Bellevue |
Electrical | Aug 6, 2026 | 3 | Subscribers |
| A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System) | 14822 NE Bellevue-Redmond Rd, Bellevue |
Electrical | Aug 6, 2026 | 3 | Subscribers |
| Cut in a pass through on a non-load bearing wall to the living room. | 15330 SE 45th St, Bellevue |
Major renovation | Aug 6, 2026 | 4 | Subscribers |
| A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Exit Sign), 25 121795 BO | 5808 Lakemont Blvd SE, Bellevue |
Electrical | Aug 6, 2026 | 4 | Subscribers |
| New SFR construction in Clyde Hill | 2305 88th Ave NE, Clyde Hill |
Other | Aug 6, 2026 | 2 | Subscribers |
| Construction of 18 townhome units and associated infrastructure., 23110915 LD 23-10918 LO | 12951 NE Bellevue-Redmond Rd, Bellevue |
Other | Aug 5, 2026 | 1 | Subscribers |
| Requesting approval to use primary residence for transient lodging. The rental will be limited to one bedroom, accommodating a maximum of tw | 1120 W Lake Sammamish Pkwy NE, Bellevue |
Other | Aug 5, 2026 | 1 | Subscribers |
| Underground fire service for new construction of a 9-story multifamily residential building with 304 residential units and 294 parking stall | 200 112th Ave NE, Bellevue |
Other | Aug 5, 2026 | 1 | Subscribers |
| The project entails a modernization of the elevator at the south side of Building B at Bellevue College. Scope of work includes, but is not | 3000 Landerholm Cir SE - Bldg B, Bellevue |
Major renovation | Aug 5, 2026 | 1 | Under $250,000 |
| all subject to utility permit 26 114855 UB. Revision to retro-fit a new concrete inlet in the street curb line as presented on the submitted | 15913 Main St, Bellevue |
Other | Aug 5, 2026 | 1 | Subscribers |
| Need to remove 2 dangerous trees near East property line. One cedar tree is a frightening threat to fall on either my or neighbor's house as | 10003 NE 28th Pl, Bellevue |
Other | Aug 5, 2026 | 1 | Subscribers |
| Lumen to bore across 112th Ave SE from Bore Pit to CBO HH, overset bore pit with a new handhole, install new conduit for new fiber placing a | 111 112th Ave SE, Bellevue |
Other | Aug 5, 2026 | 1 | Subscribers |
| Job# 101196774 - Install new OH transformer and (1) 3in riser at P01. Remove existing OH secondary span from P01 to P02. OH to UG service co | 341 106th Ave SE, Bellevue |
Major renovation | Aug 5, 2026 | 1 | Subscribers |
| Customer to install 2inch SCH40 conduit in JUT for Comcast services. | 341 106th Ave SE, Bellevue |
Other | Aug 5, 2026 | 1 | Subscribers |
| INSTALLING COMCAST CONDUIT TO 318. STARTING AT PED LOCATED NEAR NW CORNER OF 318, CREW WILL INSTALL 2INCH CONDUIT E APPROX 3FT TO A PLACED C | 318 124th Pl NE, Bellevue |
Other | Aug 5, 2026 | 1 | Subscribers |
| Replace (1) ductless split., N/A | 4200 124th Ave SE, Bellevue |
Mechanical | Aug 5, 2026 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU, 1 Air Conditioner) | 16457 SE 63rd Pl, Bellevue |
Mechanical | Aug 5, 2026 | 2 | Subscribers |
| A Single Family Condo Unit Alteration to Existing Structure Electrical Project Involving (1 Heat Pump, 1 Receptacles, 1 Added or Altered Bra | 14318 SE 42nd Ln - Unit 44, Bellevue |
Electrical | Aug 5, 2026 | 2 | Subscribers |
| A Single Family Residential Repair or Replacement Electrical Project Involving (1 Panel) | 15410 SE 54th Ct, Bellevue |
Electrical | Aug 5, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure None Project Involving (1 Fireplace Insert - Gas) | 4991 160th Ct SE, Bellevue |
Mechanical | Aug 5, 2026 | 2 | Subscribers |