| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Air Conditioner, 1 Furnace) | 10325 SE 16th St, Bellevue |
Electrical | Jul 15, 2026 | 1 | Subscribers |
| A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (2 Fire Alarms) | 2058 Bellevue Sq, Bellevue |
Major renovation | Jul 15, 2026 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement Electrical Project Involving (1 Heat Pump, 1 Furnace) | 16500 SE 45th St, Bellevue |
Electrical | Jul 15, 2026 | 2 | Subscribers |
| A Single Family Residential New Structure None Project Involving (2 Shower, Tub, or Combo) | 3211 112th Ave SE, Bellevue |
Plumbing | Jul 15, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure None Project Involving (1 Barbecue, 1 Gas Piping Only (No fixtures)) | 17905 NE 13th St, Bellevue |
Mechanical | Jul 15, 2026 | 1 | Subscribers |
| A Nonresidential Repair or Replacement Fire Alarm Project Involving (6 Fire Alarms) | 11100 NE 6th St, Bellevue |
Other | Jul 15, 2026 | 1 | Subscribers |
| New Water meter-connection Glenridge Lot 3, 24 104359 BS | 951 138th Ln SE, Bellevue |
Other | Jul 15, 2026 | 2 | Subscribers |
| Clearing and Grading: ROW work completion (Off Site). Scope of work includes site work related to final grading conditions, finishing below | 200 112th Ave NE, Bellevue |
Major renovation | Jul 15, 2026 | 1 | Subscribers |
| Install a new residential fire sprinkler system based on NFPA 13D and City requirements for the new SFR. | 3910 146th Ave SE, Bellevue |
Other | Jul 15, 2026 | 1 | Subscribers |
| Lumen to splice at Manholes 269, 55, and 174. | 10401 NE 8th St, Bellevue |
Other | Jul 15, 2026 | 1 | Subscribers |
| A Nonresidential Partial Demoltion Primary Building, 26 108458 BZ | 777 108th Ave NE, Bellevue |
Demolition | Jul 15, 2026 | 1 | Subscribers |
| A Single Family Residential Remodel Residence Project Involving (Kitchen, Bathroom) | 5303 143rd Ave SE, Bellevue |
Major renovation | Jul 15, 2026 | 4 | Subscribers |
| Install new roof top mounted PV system. 5.72kW DC - 5.38 kW AC | 14433 SE 41st St, Bellevue |
Electrical | Jul 15, 2026 | 2 | Subscribers |
| A Single Family Residential New Structure None Project Involving (4 Toilet, 6 Bathroom Sink, 2 Dishwasher, 1 Clothes Washer, 1 Floor Drain, | 12072 SE 63rd Ct - Lot 7, Bellevue |
Plumbing | Jul 15, 2026 | 3 | Subscribers |
| NON-STRUCTURAL INTERIOR TENANT IMPROVEMENT: WORK INCLUDES NON-STRUCTURAL DEMOLITION, NEW PARTITIONS, DOORS AND FINISHES. 3/24/2026 (Pre 2 su | 15325 SE 30th Pl - Bldg 1, Bellevue |
Major renovation | Jul 14, 2026 | 1 | $250,000 to $1 million |
| Construction of a new stormwater detention vault with a volume of approximately 27,221 cubic feet., 25 109622 GD | 13440 Main St, Bellevue |
New commercial construction | Jul 14, 2026 | 1 | $250,000 to $1 million |
| CONTRACTOR TO TIE INTO EXISTING PED AND BORE 220' TO TIE INTO EXISTING PED | 5603 135th Pl SE, Bellevue |
Other | Jul 14, 2026 | 1 | Subscribers |
| Lumen to access existing facilities MH381 and PED140 for fiber placing and splicing. No surface disturbance. | 13626 NE 20th St, Bellevue |
Other | Jul 14, 2026 | 1 | Subscribers |
| Job# 101203683 - UG service replacement. Install new UG from padmount transformer V01 on private property to Customer's property, trenching | 14407 SE 55th St, Bellevue |
Other | Jul 14, 2026 | 1 | Subscribers |
| Job# 101204020 - Replace poles at P01 (221177-166785), P02 (221177-166797), P03 (221177-166812), P04 (221177-166824), & P05 (221182-166830). | 4202 120th Ave SE, Bellevue |
Other | Jul 14, 2026 | 1 | Subscribers |
| RE-INSATLL EXISTING WALL SIGN AFTER WORK IS COMPLETED TOT EH BUILDINGS WALL. INSTALLING (1) ILLUMINATED WALL SIGN FOR FRENCH FLORIST | 2620 Bellevue Way NE, Bellevue |
Other | Jul 14, 2026 | 1 | Subscribers |
| Removal of an obviously dead and hazardous tree. | 12101 NE 33rd St, Bellevue |
Other | Jul 14, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure None Project Involving (1 Ductless Heat Pump) | 15417 NE 3rd Pl, Bellevue |
Mechanical | Jul 14, 2026 | 2 | Subscribers |
| A Single Family Condo Unit Repair or Replacement None Project Involving (1 Water Heater Electric < 60 gallons) | 15725 NE 18th St - Unit E-1, Bellevue |
Plumbing | Jul 14, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Vehicle Charging Station) | 3817 163rd Ave SE - Lot 9, Bellevue |
Electrical | Jul 14, 2026 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU, 1 Heat Pump ) | 212 Lake Hills Blvd, Bellevue |
Mechanical | Jul 14, 2026 | 2 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Service Change 126-200 amps, 1 Panel, 4 Added o | 204 110th Pl SE, Bellevue |
Electrical | Jul 14, 2026 | 1 | Subscribers |
| A Single Family Residential Reroofing Residence Project Involving (1 Asphalt Shingle - New, 1 Roof Rafters or Trusses 24" on center, 1 Plywo | 4401 139th Ave SE, Bellevue |
Major renovation | Jul 14, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Water Heater) | 2112 155th Ln SE, Bellevue |
Electrical | Jul 14, 2026 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU, 1 Heat Pump ) | 2368 127th Ave NE, Bellevue |
Mechanical | Jul 14, 2026 | 2 | Subscribers |