| **All Structures must be permitted separately** Partial tear-off & reroof, 62 squares of 115 MIL Fleeceback EPDM on a pitch represented as < | 3122 STERLING CIR, BOULDER |
Roofing and exterior | Mar 31, 2026 | 1 | Under $250,000 |
| *Revision to add pressure test to get gas turned on due to it being turned off by Xcel for safety because of water heater fire damage* Repla | 4500 19TH ST 639, BOULDER |
Mechanical | Mar 31, 2026 | 1 | Under $250,000 |
| *VOID- Inspections not completed within 180 days* replacing AC. 2 ton 16 SEER **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING AP | 1504 PINE ST A, BOULDER |
Mechanical | Mar 31, 2026 | 1 | Under $250,000 |
| Replacement water heater. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burni | 753 COTTAGE LN, BOULDER |
Mechanical | Mar 31, 2026 | 1 | Under $250,000 |
| Replacement furnace. Replacement water heater. Heat pump replacing air conditioner. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURN | 3410 EMERSON AVE, BOULDER |
Mechanical | Mar 31, 2026 | 1 | Under $250,000 |
| Replace the existing service with a new service and upgraded grounding. | 1860 FOREST AVE, BOULDER |
Electrical | Mar 31, 2026 | 1 | Under $250,000 |
| Replace existing furnace & A/C with new, like for like. Furnace: 80% AFUE, 40K BTU AC: 2 ton, 14 SEER **PLEASE NOTE: APPLICABLE ONLY TO SYST | 4935 TWIN LAKES RD 27, BOULDER |
Mechanical | Mar 31, 2026 | 1 | Under $250,000 |
| 80% AFUE 150K BTU Furnace Replace, 19 Seer2 5 ton Heat Pump for AC Replace Only, **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING | 4853 DAKOTA BLVD, BOULDER |
Mechanical | Mar 31, 2026 | 2 | Under $250,000 |
| Replace like for like gas furnace with Rheem 96% AFUE 2 stage variable speed motor furnace and replace AC with Rheem 18 SEER 3 ton heat pump | 2501 BRIARWOOD DR, BOULDER |
Mechanical | Mar 31, 2026 | 1 | Under $250,000 |
| 8' sewer service repair in the front yard 10' in depth. PVC-40 as pipe, squeegee as bedding, and strongback coupling connections | 1875 DEL ROSA CT, BOULDER |
Plumbing | Mar 31, 2026 | 1 | Subscribers |
| occupancy for tree pruning | 4016 26TH ST, BOULDER |
Other | Mar 31, 2026 | 1 | Under $250,000 |
| JB0002113018 - TREE TRIM ON COMMUNICATION LINE AND OVERLASH A TOTAL 1428' OF 48CT FIBER AND SPLICE WHEN COMPLETE **contractor must notify im | 3525 19TH ST, BOULDER |
Other | Mar 31, 2026 | 1 | Under $250,000 |
| JB0002159660 - Bore 2506' 2x2"conduit and pull 48ct fiber. Add 3 new vaults and 1 new pedestal. Splice when complete **contractor must notif | 3101 GAMOW LN, BOULDER |
Other | Mar 31, 2026 | 1 | Under $250,000 |
| *VOID- Inspections not completed within 180 days* Install 199,000 Btu's Tankless water heater, 96% efficiency - Local 1 Plbg subcontractor M | 311 SEMINOLE DR, BOULDER |
Mechanical | Mar 31, 2026 | 2 | Under $250,000 |
| The project is a tenant improvement within the first level for a new office space associated with Boulder Community Health Foundation. The a | 4865 RIVERBEND RD, BOULDER |
Major renovation | Mar 31, 2026 | 1 | $250,000 to $1 million |
| **All Structures must be permitted separately** Partial tear-off & reroof of SFD, 7 squares of EPDM on a pitch represented as less than 2/12 | 4882 KELLOGG CIR, BOULDER |
Roofing and exterior | Mar 31, 2026 | 1 | Under $250,000 |
| after-the-fact wastewater service cutoff permit | 844 19TH ST, BOULDER |
Other | Mar 31, 2026 | 1 | Subscribers |
| **All Structures must be permitted separately** **Total tear-off & reroof of SFD, 21 squares of dimensional shingles on a pitch represented | 210 S 39TH ST, BOULDER |
Roofing and exterior | Mar 31, 2026 | 2 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of detached garage, 9 squares of dimensional shingles on a pitch rep | 1494 YAUPON AVE, BOULDER |
Roofing and exterior | Mar 31, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 20 squares of dimensional shingles on a pitch represented as | 1494 YAUPON AVE, BOULDER |
Roofing and exterior | Mar 31, 2026 | 1 | Under $250,000 |
| REMOVE & REPALCE (7) WINDOWS LIKE FOR LIKE INTO (6) OPENINGS - NO ALTERATIONS TO FRAMED OPENINGS - U-FACTORS .24 OR BETTER | 1458 PERIWINKLE DR, BOULDER |
Other | Mar 31, 2026 | 2 | Under $250,000 |
| Master bathroom remodel | 4400 CHIPPEWA DR, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| Upgrade to a high-efficiency tankless water heater. Reconfiguration of existing water and gas lines Installation of fresh air intake and exh | 521 ARAPAHOE AVE, BOULDER |
Mechanical | Mar 30, 2026 | 1 | Under $250,000 |
| THIS SCOPE INCLUDES THE INSTALLATION OF (4) NEW EV CHARGERS IN AN EXISTING SUBTERRANEAN GARAGE AND THE DESIGNATION OF EXISTING SURFACE PARKI | 1805 29TH ST, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| This basement was previously finished and was demolished after the 2013 floods. All concrete foundation walls, mechanical ductwork, windows | 4705 RICARA DR, BOULDER |
Major renovation | Mar 30, 2026 | 1 | Under $250,000 |
| Installation of a flush mount, grid-tied, 7.395 kW solar PV system and one Tesla Powerwall 3 battery. *See HIS2026-00039* | 728 14TH ST, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| Replacing the furnace with a cold climate heat pump and AHU **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new | 3995 MARTIN DR, BOULDER |
Mechanical | Mar 30, 2026 | 1 | Under $250,000 |
| Roof mounted PV system with ESS | 731 PINE ST, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| PV roof mounted system w/ ESS & EV charger | 4162 WESTCLIFFE CT, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| **180-day one-time extension request granted. Project must be completed by 4/25/2027.** *Reinstatement permit to complete inspections from B | 2203 HOLYOKE DR, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |