| Addition of small outdoor kitchen containing one propane grill and one min beverage fridge. | 3275 19TH ST, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| Replace existing fan coil unit (Aquatherm) with new. **Any electrical work required beyond a like-for-like replacement of equipment will req | 3601 ARAPAHOE AVE 320, BOULDER |
Mechanical | Mar 30, 2026 | 1 | Under $250,000 |
| Installation of a flush mount, grid-tied, 12.180 kW solar PV system and one Tesla Powerwall 3 battery. | 1110 KALMIA AVE, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| ESS addition to existing PV system | 445 UTICA AVE, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| ESS battery. Installation of one Tesla Powerwall 3 battery retrofit to an existing PV solar system. | 2850 5TH ST, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| PV roof mounted system w/ ESS | 542 DAKOTA BLVD, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| Replace like for like water boiler in mechanical room of building. | 3473 28TH ST, BOULDER |
Mechanical | Mar 30, 2026 | 1 | Under $250,000 |
| PV roof mounted system w/ ESS | 2917 13TH ST, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| ESS only addition to existing PV system | 3295 19TH ST, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| **REVISION 5/21/26-New load center upsized to 225A along with feeder size. Breaker feeding existing loads updated to 200A. Install 27kWh Tes | 800 MCINTIRE ST, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| ESS Addition to Existing Solar System ***7/23/26*** Update to relocate ESS equipment | 1955 3RD ST 7, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| replace tankless water heater like for like **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued ve | 1043 PEARL ST, BOULDER |
Mechanical | Mar 30, 2026 | 1 | Under $250,000 |
| Ductless Heat Pump System Installation: Quilt 3-Zone Mini Split Cold Climate Heat Pump System QUILT OUTDOOR UNIT: With a SEER2 of 25.3 and H | 2021 BLUFF ST, BOULDER |
Mechanical | Mar 30, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspection within 180 days** Replace 75-gallon water heater **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL | 3301 ARAPAHOE AVE 327, BOULDER |
Mechanical | Mar 30, 2026 | 1 | Under $250,000 |
| ESS battery. Outdoor installation of one Tesla Powerwall 3 battery retrofit to an existing solar PV system. | 1094 QUINCE AVE, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| **REVISION 5/11/26- Adding 100A main breaker in the existing subpanel and tap from that a 70A fused disconnect. ESS addition to existing sol | 3973 PROMONTORY CT, BOULDER |
Electrical | Mar 30, 2026 | 1 | Under $250,000 |
| *VOID- Inspections not completed within 180 days* Replace furnace like for like 70k btu 80%. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH | 245 MARTIN DR, BOULDER |
Mechanical | Mar 30, 2026 | 1 | Under $250,000 |
| Full closure of 34th Street and the East sidewalk on 34th for crane occupancy **impacted residents and businesses must be notified a minimum | 3400 VALMONT RD, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| emergency pole replacement after-the-fact permit **replaced pole must be removed at time of installation** | 3045 5TH ST, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| Provide a rolloff dumpster for hauling debris from jobsite 3573 Ivy Circle | 3573 IVY CIR, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| Map 7 | Pole Replacement, traffic control, alley closure & OLR **contractor must notify impacted residents and businesses 72 hrs in advance; | 1133 PLEASANT ST, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| Map 6 | Pole replacement, traffic control, alley closure & OLR **contractor must notify impacted residents 72 hrs in advance; no-parks must | 1091 LINCOLN PL, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| Map 5 | WO #115611440 - Pole replacements - traffic control, alley closure & OLR **contractor must notify impacted residents 72 hrs in advan | 908 UNIVERSITY AVE, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| Map 4 | WO #115611440 Pole replacements - traffic control, alley closure & OLR **contractor must notify impacted residents 72 hrs in advance | 802 MARINE ST, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| Cut, remove, and replace 15?x3? section of asphalt located in city street and 23?x3? yard at about 9? deep. Will tunnel under sidewalk. **co | 3155 DOVER DR, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| ADR2025-00274 Occupancy only to splice at vaults - no traffic control needed. All work is on the side of the road **contractor will not occu | 3390 28TH ST, BOULDER |
Other | Mar 30, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 16 squares of dimensional shingles on a pitch represented as | 3833 ORION CT, BOULDER |
Roofing and exterior | Mar 30, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 37 squares of dimensional shingles on a pitch represented as | 3280 SAINT VINCENT PL, BOULDER |
Roofing and exterior | Mar 30, 2026 | 1 | Under $250,000 |
| Install heat pump replacing an air conditioner. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glue | 3106 GALILEO LN, BOULDER |
Mechanical | Mar 30, 2026 | 1 | Under $250,000 |
| Replacement furnace and heat pump replacing air conditioner. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new | 780 9TH ST, BOULDER |
Mechanical | Mar 30, 2026 | 1 | Under $250,000 |