| Water Heater 48 Gallon Bradford White Tall Power Direct Vent ULN like for like replacement **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FU | 500 KALMIA AVE, BOULDER |
Mechanical | Sep 2, 2026 | 1 | Under $250,000 |
| TI of 20 Heads in Remodeled Lab Area | 4747 ARAPAHOE AVE, BOULDER |
Major renovation | Sep 2, 2026 | 1 | Under $250,000 |
| in-property wastewater service repair | 4271 MILLIKEN CT, BOULDER |
Other | Sep 2, 2026 | 2 | Under $250,000 |
| Commercial gas service demo - Remove 68' of 1 1/4" steel pipe **sidewalk closure for no more than 3 consecutive days** **bike lane merging w | 1012 UNIVERSITY AVE, BOULDER |
Demolition | Sep 2, 2026 | 3 | Under $250,000 |
| Map 11 | Pole replacement, traffic control, OLR on Aurora & 6th **contractor must notify impacted residents 72 hrs in advance; no-parks must | 880 6TH ST, BOULDER |
Other | Sep 2, 2026 | 2 | Under $250,000 |
| Phase 2 (work area 829 SF) of remodel to residence and attached garage. Scope includes new interior finishes, fixtures, and appliances, as w | 1000 ROSEHILL DR, BOULDER |
Major renovation | Sep 2, 2026 | 2 | Under $250,000 |
| FITNESS STUDIO INTERIOR BUILD OUT IN A DEMISED RETAIL SPACE. WORK TO INCLUDE DEMOLITION, THE INSTALLATION OF CEILINGS, PARTITIONS, DOORS, IN | 2490 ARAPAHOE AVE, BOULDER |
Major renovation | Sep 1, 2026 | 1 | $250,000 to $1 million |
| Stair Renewal | 2336 SPRUCE ST, BOULDER |
Other | Sep 1, 2026 | 1 | Under $250,000 |
| Retaining wall in backyard | 3845 CLOVERLEAF DR, BOULDER |
Other | Sep 1, 2026 | 1 | Under $250,000 |
| Bathroom remodel (approx 55 SF) in single family dwelling - demo'd and affected walls are non-structural. | 4281 EATON CT, BOULDER |
Other | Sep 1, 2026 | 1 | Under $250,000 |
| Interior remodel of commercial space for office use - includes electrical - Demolish existing partition wall and reconstruct space to suit n | 2560 28TH ST 202, BOULDER |
Other | Sep 1, 2026 | 1 | Under $250,000 |
| ADR2025-00250 | COMCAST PROPOSES TO PLACE AERIAL 1,648 FT, AERIAL RISER UP & DOWN 50 FT AND DIRECTIONAL BORE 2,094 FT TO INSTALL FIBER OPTIC | 345 22ND ST, BOULDER |
Other | Sep 1, 2026 | 1 | Under $250,000 |
| ADR2025-00139 | Comcast proposes to place directional bore 2,875' to install fiber optic cable in to new conduit along Baseline and 15th **c | 900 BASELINE RD, BOULDER |
Other | Sep 1, 2026 | 1 | Under $250,000 |
| Rebuilding of entire D unit deck railing. There are 3 sections that will be rebuilt, total length of railings is 20' 10". DCS will rebuild t | 4300 MONROE DR D, BOULDER |
Other | Sep 1, 2026 | 1 | Under $250,000 |
| Install (2) helical piers under the SE (front-right) garage foundation, as shown on the attached plans, to help mitigate future vertical mov | 240 MOHAWK DR, BOULDER |
Other | Sep 1, 2026 | 1 | Under $250,000 |
| Installation of one 30'x45' tent without walls for BCH's milestone event honoring employees 15+ years at BCH. Event is on 9/10/2026 | 4747 ARAPAHOE AVE, BOULDER |
Other | Sep 1, 2026 | 1 | Subscribers |
| in-property wastewater repair to install cleanouts | 4770 SHOUP PL, BOULDER |
Other | Sep 1, 2026 | 1 | Subscribers |
| Installation of new minisplit Heat Pump with two indoor head units. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: | 839 PEARL ST, BOULDER |
Mechanical | Sep 1, 2026 | 1 | Under $250,000 |
| Detach and reset of existing solar as permitted PMT2011-02350-ELE. **All Structures must be permitted separately** Total tear-off & reroof o | 3010 18TH ST, BOULDER |
Roofing and exterior | Sep 1, 2026 | 1 | Under $250,000 |
| Replacement furnace and replacement air conditioner with associated electrical. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING | 5571 LONE EAGLE CT, BOULDER |
Mechanical | Sep 1, 2026 | 1 | Under $250,000 |
| Install replacement furnace and heat pump replacing air conditioner with associated electrical. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WI | 3142 11TH ST, BOULDER |
Mechanical | Sep 1, 2026 | 1 | Under $250,000 |
| Install new 5 zone mini split heat pump system and associated electrical. Install transfer switch with generator inlet receptacle. Upgrade s | 2655 ILIFF ST, BOULDER |
Mechanical | Sep 1, 2026 | 1 | Under $250,000 |
| *withdrawn by contractor* Replacement furnace, bypass humidifier, and new heat pump with associated electrical. **PLEASE NOTE: APPLICABLE ON | 545 S 42ND ST, BOULDER |
Mechanical | Sep 1, 2026 | 1 | Under $250,000 |
| Like for like replacement of residential ducted central air conditioner. **Any electrical work required beyond a like-for-like replacement o | 265 CIMMARON WAY, BOULDER |
Mechanical | Sep 1, 2026 | 1 | Under $250,000 |
| in-property wastewater service repair | 417 MAPLETON AVE, BOULDER |
Other | Sep 1, 2026 | 1 | Subscribers |
| Main Panel Upgrade (100 to 200amps), 70amp Subpanel, NEMA 14-50 Outlet, Adjustable EV charger install: Hardwire, 50amps, Electrical Wiring ( | 1385 BEAR MOUNTAIN DR C, BOULDER |
Electrical | Sep 1, 2026 | 2 | Under $250,000 |
| Small Cell Facility: Due to system limitations, wireless facility permits have two permits that require review, approval and inspection toge | 913 BASELINE RD, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| Small Cell Facility: Due to system limitations, wireless facility permits have two permits that require review, approval and inspection toge | 913 BASELINE RD, BOULDER |
Electrical | Aug 31, 2026 | 1 | Under $250,000 |
| Construction of a 212 SF deck with 1hr fire rated, fire-treated framing & railing system, and decking material with Class A fire rating with | 3090 6TH ST, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| Installation of a flush mount, grid-tied, 6.720 kW solar PV system and one Tesla Powerwall 3 battery. | 515 FOREST AVE, BOULDER |
Electrical | Aug 31, 2026 | 1 | Under $250,000 |