| REMOVE AND REPLACE 2 WINDOWS LIKE FOR LIKE NO STRUCTURAL CHANGES Window replacements require rough and final siding inspections. Rough Inspe | 4397 13TH ST, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| ESS addition to existing PV system | 1064 GAPTER RD, BOULDER |
Electrical | Aug 31, 2026 | 1 | Under $250,000 |
| Full structure deconstruction of a single family home, approximately 2724 sqft. *Associated with BLD-SFD2026-00281 | 2535 KENWOOD DR, BOULDER |
Demolition | Aug 31, 2026 | 1 | Subscribers |
| Mini split multi zone install 4 ton outdoor unit and 2 total 24k indoor wall mount units. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUE | 4500 19TH ST 426, BOULDER |
Mechanical | Aug 31, 2026 | 1 | Under $250,000 |
| Replacement of existing Furnace and AC with new Furnace and Heat Pump **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES | 2790 STANFORD AVE, BOULDER |
Mechanical | Aug 31, 2026 | 1 | Under $250,000 |
| COMCAST PROPOSES TO PROOF AND PULL 5 FTOF COAX CABLE NEAR 1777 BROADWAY INSIDETHE ROW OF CITY OF BOULDER, CO 80302 | CONDITIONS OF APPROVAL: | 1777 BROADWAY, BOULDER |
Roofing and exterior | Aug 31, 2026 | 1 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* ADR2025-00251 | Proposed Streetlight small cell to be installed northw | 1898 LEHIGH ST, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| Sewer service repair in the private lot of the property | 3205 5TH ST, BOULDER |
Plumbing | Aug 31, 2026 | 1 | Subscribers |
| Replace 50 gallon water heater - like for like **Any electrical work required beyond a like-for-like replacement of equipment will require a | 4661 HUEY CIR, BOULDER |
Mechanical | Aug 31, 2026 | 1 | Under $250,000 |
| Replace 50-gallon PDV gas water heater **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents f | 1600 YELLOW PINE AVE, BOULDER |
Mechanical | Aug 31, 2026 | 1 | Under $250,000 |
| Grading Permit associated with the Fire Station #2 Development Site | TEC2026-00020 | 2207 BASELINE RD 1, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| Erosion Control Permit associated with the Fire Station #2 Development Site | TEC2026-00020 | 2207 BASELINE RD 1, BOULDER |
Other | Aug 31, 2026 | 1 | Subscribers |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 21 squares of dimensional shingles on a pitch represented as | 1012 ALBION WAY, BOULDER |
Roofing and exterior | Aug 31, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 19 squares of dimensional shingles on a pitch represented as | 1372 GLEN CT, BOULDER |
Roofing and exterior | Aug 31, 2026 | 1 | Under $250,000 |
| Replace existing ac w/a 20 SEER 3 ton heat pump and reconnect. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All n | 1372 GLEN CT, BOULDER |
Mechanical | Aug 31, 2026 | 1 | Under $250,000 |
| Replace like for like AC and gas furnace. **Any electrical work required beyond a like-for-like replacement of equipment will require an ele | 2870 E COLLEGE AVE 305, BOULDER |
Mechanical | Aug 31, 2026 | 1 | Under $250,000 |
| replacing furnace. 90K BTU 97% eff **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for f | 1360 WALNUT ST 212, BOULDER |
Mechanical | Aug 31, 2026 | 2 | Under $250,000 |
| Replacing current furnace and ac with: 1-BOVB-36MTB-M19E 36K BTU 19SEER2 Bosch Heat Pump 1-BMAC3036CBTA Bosch Cased Coil 1-Electrical Discon | 5476 BLACKHAWK RD, BOULDER |
Mechanical | Aug 31, 2026 | 1 | Under $250,000 |
| Keeping existing furnace; replacing a 5 ton AC with a 1-BOVB-60MTB-M19E Bosch 60K BTU 19 Seer Heat Pump 1-BMAC4860DBTA Cased Coil 1-Disconne | 4433 SCARSDALE PL, BOULDER |
Mechanical | Aug 31, 2026 | 1 | Under $250,000 |
| Installation of a 3 Ton Mitsubishi ducted heat pump system. Condenser model #PUZ-AK36NLHZ, AHU model #PVA-AA36NL. Electrical components: 35A | 4185 COOPER CT, BOULDER |
Mechanical | Aug 31, 2026 | 1 | Under $250,000 |
| Like for like water heater replacement **Any electrical work required beyond a like-for-like replacement of equipment will require an electr | 2625 TABLE MESA CT, BOULDER |
Mechanical | Aug 31, 2026 | 1 | Under $250,000 |
| *Traffic Control Only **NO CUTS** for Restoration and Activation to follow. JB0002687525 **contractor must notify impacted residents 72 hrs | 1050 14TH ST, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| *Traffic Control Only **NO CUTS** for Restoration and Activation to follow. JB0002592626 **contractor must notify impacted residents 72 hrs | 1623 19TH ST, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| *Traffic Control Only **NO CUTS** for Restoration and Activation to follow. JB0002687524 **contractor must notify impacted residents 72 hrs | 2068 5TH ST, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| *Traffic Control Only **NO CUTS** for Restoration and Activation to follow. JB0002592628 **contractor must notify impacted residents and bus | 728 PEARL ST, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| JB0002592623 | splicing at two locations | CONDITIONS OF APPROVAL: **contractor must notify impacted residents/businesses a minimum of 72 ho | 1329 5TH ST, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| JB0002592630 | splicing at 3 locations | CONDITIONS OF APPROVAL: **contractor must notify impacted residents/businesses a minimum of 72 hour | 1101 UNIVERSITY AVE, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| *9/3 revision: crane will be needed for 2 days during phase 1 of TCP* ADR2025-00076 | Proposed Streetlight small cell to be installed northe | 1401 YARMOUTH AVE, BOULDER |
Other | Aug 31, 2026 | 1 | Under $250,000 |
| Tenant finish of one-story retail space, 2753 sf net area. | 5350 ARAPAHOE AVE, BOULDER |
Major renovation | Aug 31, 2026 | 1 | Under $250,000 |
| Total demolition of the existing apartment structure, including removal of the surrounding foundations. Scope includes demolition, loading, | 2207 BASELINE RD, BOULDER |
Demolition | Aug 31, 2026 | 1 | Subscribers |