| Addition of Mini-split system. Electrical upgrades to be completed by Lovell Electric. | 2890 DARTMOUTH AVE, BOULDER |
Mechanical | Aug 14, 2026 | 1 | Under $250,000 |
| Replace conventional gas water heater with energy efficient heat pump, electrical water heater | 4640 SPRUCEDALE PL, BOULDER |
Mechanical | Aug 14, 2026 | 1 | Under $250,000 |
| Install temp construction meter in back yard. Associated with BLD-SFD2026-00140 and BLD-ACC2026-00007. | 3120 JEFFERSON ST, BOULDER |
Electrical | Aug 14, 2026 | 1 | Subscribers |
| Load/unload from 2 POD containers in front of 955 College Avenue for 4 days, 08/17-08/20 | 955 COLLEGE AVE, BOULDER |
Other | Aug 14, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 33 squares of dimensional shingles on a pitch represented as | 315 MANHATTAN DR, BOULDER |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| 1x Mitsubishi Outdoor Unit - MUZ-FX12NLHZ and 1x Mitsubishi Wall Mounted - MSZ-FX12NL HVAC Scope: Install new 1 head mini split on ground mo | 1330 RIVERSIDE AVE, BOULDER |
Mechanical | Aug 14, 2026 | 1 | Under $250,000 |
| Install new 2.5 ton, 16 SEER a/c system and new dedicated electrical circuit for a/c **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BUR | 1703 COLUMBINE AVE, BOULDER |
Mechanical | Aug 14, 2026 | 1 | Under $250,000 |
| Air conditioner replacement **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical permit | 700 MOHAWK DR 107, BOULDER |
Mechanical | Aug 14, 2026 | 1 | Under $250,000 |
| Install new mini split system w/ electrical connect - 3-1 Condenser - 30,000 BTU Head 1 - 9,000 BTU Head 2 -15,000 BTU Head 3 - 6,000 BTU !! | 4452 GREENBRIAR BLVD, BOULDER |
Mechanical | Aug 14, 2026 | 1 | Under $250,000 |
| *Traffic Control Only **NO CUTS** for Restoration and Activation to follow. **contractor must notify impacted residents and businesses 72 hr | 901 PEARL ST, BOULDER |
Other | Aug 14, 2026 | 1 | Under $250,000 |
| (15730148) 40.04003066, -105.2614686 - Pole Maintenance Scheduled for 8/20/2026 (15730157) 40.04003851, -105.2604095 - Pole Maintenance (157 | 3592 NOTTINGHAM CT, BOULDER |
Other | Aug 14, 2026 | 1 | Under $250,000 |
| Repair, recondition, and repaint of façade at 1617 Pearl St. **contractor must notify impacted businesses 72 hrs in advance** **no materials | 1617 PEARL ST, BOULDER |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| Load/unload from a POD container in front of 2265 Floral Drive for 3 days, 09/01-09/03 | 2265 FLORAL DR, BOULDER |
Other | Aug 14, 2026 | 1 | Under $250,000 |
| *Traffic Control Only **NO CUTS** for Restoration and Activation to follow. JB0002592622 **contractor must notify impacted residents 72 hrs | 520 AURORA AVE, BOULDER |
Other | Aug 14, 2026 | 1 | Under $250,000 |
| Place a 10 yard roll off curbside in front of the home for construction debris | 4625 WINTERCRESS CT, BOULDER |
Other | Aug 14, 2026 | 1 | Under $250,000 |
| Water service line repair | 4886 KINGS RIDGE BLVD, BOULDER |
Plumbing | Aug 14, 2026 | 1 | Under $250,000 |
| WO 116286992 | Xcel Energy needs to perform a service renewal on the main gas line due to a leak **contractor must notify impacted residents | 637 NORTH ST, BOULDER |
Plumbing | Aug 14, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of detached garage, 9 squares of dimensional shingles on a pitch rep | 808 10TH ST, BOULDER |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 16 squares of dimensional shingles on a pitch represented as | 808 10TH ST, BOULDER |
Roofing and exterior | Aug 14, 2026 | 1 | Under $250,000 |
| 3? drain line repair on line from upstairs stack and 2? drain line repair with 2? p-trap for laundry. Removed old thin copper drain installe | 235 IROQUOIS DR, BOULDER |
Plumbing | Aug 14, 2026 | 1 | Under $250,000 |
| New 3 zone mini split heat pump system with associated electrical **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: Al | 3562 SMUGGLER WAY, BOULDER |
Mechanical | Aug 14, 2026 | 1 | Under $250,000 |
| Replace 2 x Heat Pump Condenser and Furnace. No electrical Upgrades. **Any electrical work required beyond a like-for-like replacement of eq | 3610 PAONIA ST, BOULDER |
Mechanical | Aug 14, 2026 | 1 | Under $250,000 |
| Installation of new NFPA 13D fire sprinkler system with dedicated 1" UG and backflow | 520 PEARL ST, BOULDER |
Other | Aug 14, 2026 | 1 | Under $250,000 |
| ***9/25/26***upgrade the existing 200a electrical service to a 320a service. ***7/2/26 Revision to design*** We are building a 556 sq ft. up | 5224 PINEHURST DR, BOULDER |
Major renovation | Aug 13, 2026 | 1 | Under $250,000 |
| Full structure deconstruction of a single family residence, ranch with a finished walkout basement, 4,565sqft | 2945 LAFAYETTE DR, BOULDER |
Demolition | Aug 13, 2026 | 1 | Subscribers |
| FIX OR REPLACE ALL NON-WORKING OR IMPROPERLY INSTALLED OUTLETS. Additionally, the boiler must have final inspection and the plywood must be | 1838 23RD ST 6, BOULDER |
Major renovation | Aug 13, 2026 | 1 | Under $250,000 |
| Demolition of existing elevated wood deck and removal of existing hot tub. Construction of new elevated deck in same general footprint using | 5488 LONE EAGLE CT, BOULDER |
Other | Aug 13, 2026 | 1 | Under $250,000 |
| FIRST GENERATION TENANT IMPROVEMENTS TO EXISTING CORE AND SHELL 2-STORY BUILDING TO BE FIT OUT FOR RESEARCH AND DEVELOPMENT FACILITY WITH LA | 5505 CENTRAL AVE, BOULDER |
Major renovation | Aug 13, 2026 | 1 | $5 to $25 million |
| Remove and replace 8.25 Squares of Siding between the Left/Rear/Right Elevations. | 3356 FOLSOM ST, BOULDER |
Roofing and exterior | Aug 13, 2026 | 1 | Under $250,000 |
| Replace 9 windows like for like with retrofit fibrex windows, installed per manufacturer?s specifications. | 772 16TH ST, BOULDER |
Other | Aug 13, 2026 | 1 | Under $250,000 |