| Furnace and AC Replacement **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical permit | 550 MOHAWK DR 55, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 22 squares of dimensional shingles on a pitch represented as | 1955 POPLAR LN, BOULDER |
Roofing and exterior | Aug 13, 2026 | 1 | Under $250,000 |
| Water Heater Replacement. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burni | 5559 LONE EAGLE CT, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| Replace existing furnace with a new 80% AFUE, 60,000 btu/hr furnace. Replace existing a/c system with a new 16 SEER, 1.5 ton a/c system. **P | 2807 SUNDOWN LN 204, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| Replace existing furnace in mobile home closet with new 95% AFUE furnace 45,000 BTU. Dickinson Electric will install a GFCI receptacle for t | 3003 VALMONT RD 112, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| Emergency sewer service replacement from the house to the street **contractor must notify impacted residents 72 hrs in advance; no-parks mus | 2105 KING AVE, BOULDER |
Plumbing | Aug 13, 2026 | 1 | Under $250,000 |
| *Traffic Control Only **NO CUTS** for Restoration and Activation to follow. **contractor must notify impacted residents, businesses, and com | 1087 13TH ST, BOULDER |
Other | Aug 13, 2026 | 1 | Under $250,000 |
| JB0002592629 | traffic control for splicing in multiple locations **contractor must notify impacted residents/businesses a minimum of 72 hou | 802 19TH ST, BOULDER |
Other | Aug 13, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 17 squares of dimensional shingles on a pitch represented as | 1660 MARIPOSA AVE, BOULDER |
Roofing and exterior | Aug 13, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 18 squares of dimensional shingles on a pitch represented as | 3120 3RD ST, BOULDER |
Roofing and exterior | Aug 13, 2026 | 1 | Under $250,000 |
| Replacing existing furnace and AC with a new furnace and heat pump. Heat pump is 2-ton, new furnace is 96% efficient, 60,000 btus. Heat pump | 2340 HILLSDALE WAY, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| HYPER-MXZ-3D30NLHZ Mitsubishi Hyper Heat MXZ-3D 30,000 BTU Outdoor Unit Heat Pump (combine w/up to 3 heads). R454BUp to 20.00 SEER2 & 10.00H | 215 LIPAN WAY, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| New 3 Zone mini split heat pump system with associated electrical **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: Al | 411 VALLEY VIEW DR, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| INSTALL 80,000 BTU 80% FURNACE INSTALL 2-TON 14 SEER AC LIKE FOR LIKE REPLACEMENT **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNIN | 2727 FOLSOM ST 330, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| 1× Mitsubishi Outdoor Unit - SUZ-AK30NLHZ 1× Mitsubishi Air Handler - SVZ-AP30NL 1× Mitsubishi Heat Module Unit - EH05-SVZ-M 1× Mitsubishi C | 4620 TALBOT DR, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| INSTALL 260,000 BTU 95% BOILER INSTALL120 STORAGE TANK **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plast | 1005 BROADWAY, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| System Size: 28.8k BTU's of heat at 5 degrees AHRI #216581393 1× Lennox Elite Series Heat Pump (3 Ton) - EL18KSLV-036 1× Lennox Indoor Coil | 4500 OTTAWA PL, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| Repair gas leak at water heater tee **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for | 3316 34TH ST, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| Replace (2) 40-gallon water heaters. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for | 811 18TH ST, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| mini split instal with upsizing the breaker **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued ve | 1295 HARTFORD DR, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| Installation of a Full HVAC system 3 Ton 13.4 Seer AC unit and 80% 80K BTU Gas furnace. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL | 6676 GUNPARK DR, BOULDER |
Mechanical | Aug 13, 2026 | 1 | Under $250,000 |
| Providing traffic control and manholes protection for client who will be surveying manholes etc in ROW of US 36, Broadway, and 27th. **worki | 2420 BASELINE RD, BOULDER |
Other | Aug 13, 2026 | 1 | Under $250,000 |
| Replace existing furnace & AC with new. Furnace: 80% AFUE, 120K BTU AC: 4 ton, 17 SEER **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL B | 1720 NORWOOD AVE, BOULDER |
Mechanical | Aug 13, 2026 | 2 | Under $250,000 |
| PH1 PG5 - Install 4 new poles (1-35' cl 5, 1-50' cl 2, 2-45' cl 2), rebuild existing framing and configuration **contractor must notify impa | 1237 KALMIA AVE, BOULDER |
Other | Aug 13, 2026 | 2 | Under $250,000 |
| Remodel of existing kitchen with removal of non-load bearing wall. All windows to be replaced in existing openings. Addition of mini-split u | 4238 GREENBRIAR BLVD, BOULDER |
Major renovation | Aug 13, 2026 | 2 | Under $250,000 |
| 115504743 | Replacement of underground primary cable - 1550' bore **CONTRACTOR MUST MAINTAIN UTILITY SEPARATION REQUIREMENTS AS PER CITY OF | 805 LINDEN AVE, BOULDER |
Other | Aug 13, 2026 | 3 | Under $250,000 |
| Install Cold Climate Multi Stage HP/AC With Air Handler and Heat Pump Water Heater **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNI | 963 LARAMIE BLVD E, BOULDER |
Mechanical | Aug 13, 2026 | 2 | Under $250,000 |
| Installing new ducted heat pump system with back up furnace **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new | 1707 GRAPE AVE, BOULDER |
Mechanical | Aug 13, 2026 | 3 | Under $250,000 |
| Adjustable EV charger install: Hardwire, 50amps, Electrical Wiring (WIR), Private EV charging station (Residential) | 2545 TABLE MESA DR, BOULDER |
Electrical | Aug 12, 2026 | 1 | Under $250,000 |
| Dry fire sprinkler system install for solar panel/awning | 2700 29TH ST, BOULDER |
Roofing and exterior | Aug 12, 2026 | 1 | Under $250,000 |